Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000128/1986002 + (ML20214M450)
- ML20214M453 + (ML20214M453)
- ML20214M454 + (ML20214M454)
- ML20214M456 + (ML20214M456)
- ML20214M459 + (ML20214M459)
- ML20214M462 + (ML20214M462)
- 05000251/LER-1986-014, :on 860805,while Tests 4-OSP-089 & TOP-233 Being Performed,Subcritical Reactor Trip Occurred.Caused by Personnel Oversight in Preparing TOP-233 to Ensure at Power Trip Signals Clear.Procedure Reviewed + (ML20214M464)
- ML20214M466 + (ML20214M466)
- ML20214M468 + (ML20214M468)
- ML20214M470 + (ML20214M470)
- ML20214M471 + (ML20214M471)
- W3P87-1067, Responds to NRC Ltr Re Violation Noted in Insp Rept 50-382/87-06.Corrective Actions:Completed Shipping Records Placed in lockable,1 H Rated Fireproof Filing Cabinet Purchased & Received on 870406 + (ML20214M472)
- ML20214M473 + (ML20214M473)
- ML20214M474 + (ML20214M474)
- ML20214M477 + (ML20214M477)
- 05000338/LER-1987-006-01, :on 870430, as Found Dropout Voltages for Undervoltage Relay Found Below Min Allowable Value Stated in Periodic Test & Immediately Recalibr.Caused by Setpoint Drift.Periodic Test Revised + (ML20214M478)
- IR 05000456/1987017 + (ML20214M481)
- ML20214M482 + (ML20214M482)
- ML20214M484 + (ML20214M484)
- ML20214M485 + (ML20214M485)
- ML20214M487 + (ML20214M487)
- ML20214M488 + (ML20214M488)
- ML20214M490 + (ML20214M490)
- IA-86-518, Partial Response to FOIA Request Re Formation of NRC-DOE Team to Study Safeguards for Category I Fuel Facilities.App a Document PDR-available.App B Documents Withheld (Ref FOIA Exemptions 1,4 & 5) + (ML20214M493)
- ML20214M493 + (ML20214M493)
- ML20214M495 + (ML20214M495)
- ML20214M503 + (ML20214M503)
- W3P87-1376, Forwards Draft Waterford 3 Nuclear Plant Island Structure Basemat Summary Rept, Per 870331 Agreement.Final Rept Will Be Submitted by 870701 + (ML20214M505)
- ML20214M508 + (ML20214M508)
- ML20214M511 + (ML20214M511)
- ML20214M513 + (ML20214M513)
- ML20214M517 + (ML20214M517)
- ML20214M519 + (ML20214M519)
- ML20214M522 + (ML20214M522)
- ML20214M525 + (ML20214M525)
- ML20214M528 + (ML20214M528)
- PNO-V-86-060, on 860903,reactor Feedwater Pump B Tripped Due to Failure of Overspeed Controls.Caused by Partial Control Valve Closure Re Tripping of Hydraulic Power Units. Investigation Underway + (ML20214M530)
- ML20214M531 + (ML20214M531)
- RBG-24023, Monthly Operating Rept for June 1986 + (ML20214M534)
- ML20214M535 + (ML20214M535)
- ML20214M538 + (ML20214M538)
- ML20214M541 + (ML20214M541)
- ML20214M542 + (ML20214M542)
- ML20214M545 + (ML20214M545)
- ML20214M546 + (ML20214M546)
- ML20214M548 + (ML20214M548)
- ML20214M550 + (ML20214M550)
- RBG-25995, Responds to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. Leak Testing Performed Every 18 Months at Facility,Including High Pressure Tests at 1,025 Psig,Per Tech Specs + (ML20214M551)
- ML20214M553 + (ML20214M553)
- ML20214M554 + (ML20214M554)
- ML20214M556 + (ML20214M556)