Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000312/1986038 + (ML20212K950)
- ML20212K951 + (ML20212K951)
- ML20212K953 + (ML20212K953)
- ML20212K955 + (ML20212K955)
- ML20212K956 + (ML20212K956)
- ML20212K957 + (ML20212K957)
- ML20212K960 + (ML20212K960)
- ML20212K961 + (ML20212K961)
- IR 05000295/1986008 + (ML20212K962)
- ML20212K963 + (ML20212K963)
- ML20212K964 + (ML20212K964)
- ML20212K965 + (ML20212K965)
- ML20212K966 + (ML20212K966)
- PNO-V-87-018, on 870301,1-2 Mw/Min Shutdown Initiated to Investigate & Repair Main Generator Hydrogen Coolant Leak. Vibration,Induced by Main Generator,Caused Cracking in Welds of Stator Cooling Water Sys Which Occurred on 870217 + (ML20212K967)
- ML20212K968 + (ML20212K968)
- ML20212K969 + (ML20212K969)
- ML20212K970 + (ML20212K970)
- ML20212K972 + (ML20212K972)
- IR 05000373/1987008 + (ML20212K973)
- 05000302/LER-1986-022, :on 861124,discovered Acceptance Criteria for Weekly Surveillance on Battery,Performed on 861119,not Satisfied.Caused by Personnel Error.Personnel Counseled.W/ + (ML20212K974)
- ML20212K975 + (ML20212K975)
- ML20212K976 + (ML20212K976)
- ML20212K978 + (ML20212K978)
- ML20212K979 + (ML20212K979)
- ML20212K980 + (ML20212K980)
- ML20212K981 + (ML20212K981)
- ML20212K982 + (ML20212K982)
- ML20212K983 + (ML20212K983)
- ML20212K984 + (ML20212K984)
- ML20212K985 + (ML20212K985)
- ML20212K986 + (ML20212K986)
- ML20212K989 + (ML20212K989)
- ML20212K990 + (ML20212K990)
- ML20212K991 + (ML20212K991)
- ML20212K994 + (ML20212K994)
- 05000346/LER-1987-001, Errata to LER 87-001-00,correcting Incomplete Sentence on Page 2 + (ML20212K995)
- ML20212K996 + (ML20212K996)
- ML20212K997 + (ML20212K997)
- ML20212K998 + (ML20212K998)
- ML20212K999 + (ML20212K999)
- ML20212L000 + (ML20212L000)
- TXX-4965, Final Deficiency Rept CP-86-30 Re Burnt Wire on Capacitor Bank in Elgar Corp Power Sys Inverter & Burnt Tywraps. Initially Reported on 860418.Burnt Wire Attributed to Bad Crimping.Issue Not Reportable Per 10CFR50.55(e) + (ML20212L001)
- ML20212L004 + (ML20212L004)
- ML20212L005 + (ML20212L005)
- ML20212L006 + (ML20212L006)
- ML20212L009 + (ML20212L009)
- ML20212L010 + (ML20212L010)
- ML20212L011 + (ML20212L011)
- ML20212L012 + (ML20212L012)
- 3F0187-16, Partial Revised Response to Violations Noted in Insp Rept 50-302/86-31.Corrective Actions:Procedures OP-402 & OP-408 Revised to Assure Inclusion of Tech Spec 6.8.1 Requirements. Short Term Instruction Corrected Problem Temporarily + (ML20212L013)
- U-600686, Deficiency Rept 55-86-05 Re Unsealed Gaps in 3-h Rated Fire Wall.Initially Reported on 860717.Investigation Continuing. Addl Fire Watches Established.Final Rept Will Be Submitted in Approx 30 Days + (ML20212L014)