Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206N224 + (ML20206N224)
- ML20206N225 + (ML20206N225)
- ML20206N226 + (ML20206N226)
- ML20206N227 + (ML20206N227)
- ML20206N228 + (ML20206N228)
- 05000259/LER-1986-023-01, :on 860717,during Attempt to Put Switchyard Capacitor Bank in Svc,Reactor Scram Occurred.Caused by Incomplete Closing of Switchyard Disconnect & Mechanical Failure.Retraining Course Developed + (ML20206N230)
- ML20206N231 + (ML20206N231)
- 05000275/LER-1986-008-01, :on 860415,flow Control Valve Surveillance Test Interval Exceeded.Caused by Personnel Error.Alert Status Board Used to Increase Emphasis on Updating & Validation of Surveillances + (ML20206N233)
- ML20206N234 + (ML20206N234)
- ML20206N235 + (ML20206N235)
- 05000482/LER-1986-042, :on 860724,during Controlled Plant Shutdown, Reactor Trip Occurred.Caused by lo-lo Steam Generator B Level.Evaluation of Feedwater Flow Control Design Enhancements Continuing + (ML20206N236)
- ML20206N239 + (ML20206N239)
- 0CAN088606, Responds to Violations Noted in Insp Repts 50-313/86-16 & 50-368/86-16.Corrective Actions:Second Set of Procedures Assigned to Dosimetry Supervisor to Be Located at Secondary Work Station.Violation Should Be Severity Level V + (ML20206N241)
- ML20206N242 + (ML20206N242)
- ML20206N243 + (ML20206N243)
- ML20206N247 + (ML20206N247)
- ML20206N248 + (ML20206N248)
- ML20206N249 + (ML20206N249)
- ML20206N250 + (ML20206N250)
- ML20206N251 + (ML20206N251)
- RBG-24216, Special Rept:On 851010,860109,0422 & 0712,marker 34 Structural Settlement Value Measured Outside Limits of Tech Spec Table 3.7.10-1.Change to FSAR Table 2.5-19 Will Be Made to Revise Predicted Settlement + (ML20206N253)
- LIC-98-0163, Informs of Rev to Commitment Made in Response to Violation 50-285/97-16 Re Failure to Remove Uncalibrated Electronic Dosimeter from Svc.Implementation of Computer Software That Was Received on 981030,is Not Expected Until 990228 + (ML20206N254)
- ML20206N255 + (ML20206N255)
- ML20206N257 + (ML20206N257)
- 3F1298-04, Provides Notification That NRC Commitment Per Violations Noted in Insp Rept 50-302/97-12,is Being Revised & Is Considered to Be Completed.Listed Commitments Were Combined & Revised.Due Date Was Extended as Listed + (ML20206N259)
- ML20206N261 + (ML20206N261)
- ML20206N262 + (ML20206N262)
- ML20206N264 + (ML20206N264)
- ST-HL-AE-2046, Forwards Revised FSAR Table 9.2.2-2, Component Cooling Water Chemistry,Normal Plant Operations, Reflecting Expected Sys Ph at 25 C + (ML20206N265)
- ML20206N266 + (ML20206N266)
- ML20206N267 + (ML20206N267)
- ML20206N269 + (ML20206N269)
- ML20206N270 + (ML20206N270)
- ML20206N271 + (ML20206N271)
- ML20206N273 + (ML20206N273)
- ML20206N275 + (ML20206N275)
- 05000302/LER-1998-012, :on 981109,delay in Performance of Improved TSs Required Actions Was Noted.Caused by Personnel Error. Discussed Lessons Learned,Addl Training & Developed Improved Method of Tracking LCO Entries.With + (ML20206N277)
- 05000482/LER-1986-041, :on 860723,control Room Ventilation Isolation Signal (Crvis) Occurred.Caused by Short Supply of Tape in Chlorine Monitor.Design Change to Minimize Potential Spurious Crvis Currently Being Considered + (ML20206N278)
- ML20206N279 + (ML20206N279)
- 05000423/LER-1986-040, :on 860721,Train B Control Bldg Isolation Signals Generated Due to Failures of Control Bldg Inlet Ventilation Chlorine Detectors.Caused by Presence of Contaminants on Probes.Detectors Relocated + (ML20206N280)
- 05000306/LER-1998-005-02, :on 981109,RT from 22% Power During Planned SD Operation Was Noted.Caused by Tt.Fw Heater Drain Level Control Was Thoroughly Inspected & Calibrated.With + (ML20206N281)
- ML20206N282 + (ML20206N282)
- IR 05000498/1986012 + (ML20206N284)
- ML20206N286 + (ML20206N286)
- ML20206N287 + (ML20206N287)
- ML20206N290 + (ML20206N290)
- ML20206N292 + (ML20206N292)
- ML20206N293 + (ML20206N293)
- 05000266/LER-1998-028, :on 981113,surveillances Required by Section XI Pressure Test Program Were Missed.Caused by Failure to Take Timely Action on & Implement Corrective Actions for ASME Program Problems.Completed 40 Month Pressure Test + (ML20206N296)
- ML20206N297 + (ML20206N297)
- IR 05000456/1986027 + (ML20206N299)