Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206G007 + (ML20206G007)
- ML20206G008 + (ML20206G008)
- 05000282/LER-1999-004, :on 990402,discovered That Sp That Demonstrates Inoperability of SFP Special Ventilation Sys Was Inadequate. Caused by Inadequate GL 96-01 Initial Review.Isolation Order Removed Control Fuses from Affected Fail Close Valves + (ML20206G012)
- ML20206G014 + (ML20206G014)
- ML20206G015 + (ML20206G015)
- ML20206G017 + (ML20206G017)
- ML20206G018 + (ML20206G018)
- ML20206G019 + (ML20206G019)
- ML20206G020 + (ML20206G020)
- ML20206G021 + (ML20206G021)
- L-99-069, Forwards BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031, Per 10CFR50.59.Determination of Changes,Discussed + (ML20206G023)
- 05000414/LER-1986-014-01, :on 860518,manual Reactor Trip Occurred When Turbine Tripped on hi-hi Steam Generator Level.Cause Unknown.Main Feedwater Isolation Reset.Main Feedwater Flow to Steam Generators Realigned + (ML20206G025)
- ML20206G026 + (ML20206G026)
- ML20206G028 + (ML20206G028)
- ML20206G029 + (ML20206G029)
- ML20206G030 + (ML20206G030)
- ML20206G033 + (ML20206G033)
- ML20206G034 + (ML20206G034)
- ML20206G035 + (ML20206G035)
- ML20206G036 + (ML20206G036)
- ML20206G039 + (ML20206G039)
- ST-HL-AE-2031, Responds to 870402 Request for Info Re Reg Guide 1.75 Testing of 750 MCM Cable,Item 4 Re Dc Battery Cells & Item 5 Re Electrical Penetration Protection Devices.Existing Design Meets Requirements of Rev 0 to Reg Guide 1.63 + (ML20206G040)
- ML20206G043 + (ML20206G043)
- ML20206G045 + (ML20206G045)
- 05000267/LER-1987-007, :on 870310,switch Input Module (XDSH-93133) for High Reactor Bldg Pressure Channel PDSH-93133 Discovered to Be Inoperable Since 870222.Caused by Personnel Error. Supervisors Will Be Informed of Problems Found + (ML20206G048)
- ML20206G049 + (ML20206G049)
- ML20206G050 + (ML20206G050)
- ML20206G051 + (ML20206G051)
- ML20206G053 + (ML20206G053)
- IR 05000334/1987099 + (ML20206G059)
- ML20206G061 + (ML20206G061)
- ML20206G063 + (ML20206G063)
- ML20206G065 + (ML20206G065)
- U-601311, Forwards Rev 0 to QUAD-1-87-004, Nonsafety-Related Control Sys Failure Analysis & Proprietary EAS-18-0388, Special Transient Event Analysis to Support Control Sys Failure Analysis for Clinton.... Proprietary Rept Withheld + (ML20206G067)
- ML20206G069 + (ML20206G069)
- ML20206G070 + (ML20206G070)
- ML20206G072 + (ML20206G072)
- ML20206G077 + (ML20206G077)
- ST-HL-AE-2023, Forwards Proposed Change to Initial Startup Test for Pressurizer Effectiveness.Initial Startup Procedure Will Compare Test Results to Predicted Responses in Westinghouse NSSS Startup Procedure.Test Description Also Encl + (ML20206G078)
- ML20206G080 + (ML20206G080)
- ML20206G081 + (ML20206G081)
- ML20206G082 + (ML20206G082)
- ML20206G083 + (ML20206G083)
- ML20206G085 + (ML20206G085)
- 05000414/LER-1986-013-01, :on 860517,reactor Tripped During Swapover from Auxiliary to Main Feedwater Nozzles.Caused by Stuck Reverse Purge Isolation Valve Due to Separation of Valve Disc from Valve Stem.Valve Replaced + (ML20206G087)
- ML20206G088 + (ML20206G088)
- 3F0487-09, Forwards Partial Revised Response to Insp Rept 50-302/86-12. Response Delayed as Described in Util .Corrective Actions:Ler Will Be Submitted by 870511,documenting Design Deficiency W/Potential to Cause Loss of RHR Ability + (ML20206G089)
- ML20206G090 + (ML20206G090)
- ML20206G094 + (ML20206G094)
- ML20206G095 + (ML20206G095)
- ML20206G096 + (ML20206G096)