- 05000352/LER-1997-009, Forwards LER 97-009-00 Which Documents Event That Occurred at Lgs,Units 1 & 2 on 971015 + (ML20199H694)
- ML20199H695 + (ML20199H695)
- ML20199H698 + (ML20199H698)
- ML20199H699 + (ML20199H699)
- 05000352/LER-1997-009-01, :on 971015,RM Was Incorrectly Configured.Caused by Personnel Error.Piping at RM Sample Skid Has Been Corrected & Affected Drawings Have Been Revised to Reflect Change + (ML20199H701)
- ML20199H702 + (ML20199H702)
- ML20199H703 + (ML20199H703)
- ML20199H704 + (ML20199H704)
- ML20199H706 + (ML20199H706)
- ML20199H707 + (ML20199H707)
- ML20199H708 + (ML20199H708)
- 05000295/LER-1996-007-01, Forwards LER 96-007-01 Which Is Being Submitted to Update Safety Analysis & CA Taken Re Event That Occurred at Zion Nuclear Power Station,Unit 1.Commitments Made within Ltr, Encl + (ML20199H711)
- ML20199H712 + (ML20199H712)
- ML20199H716 + (ML20199H716)
- ML20199H717 + (ML20199H717)
- ML20199H719 + (ML20199H719)
- NPL-98-0004, Discusses Main Control Board Wiring Separation for Units 1 & 2.Attachment B Copy of Work Package List & Wire/Sys Designators for Each Package + (ML20199H720)
- ML20199H721 + (ML20199H721)
- ML20199H723 + (ML20199H723)
- ML20199H725 + (ML20199H725)
- ML20199H726 + (ML20199H726)
- ML20199H727 + (ML20199H727)
- ML20199H728 + (ML20199H728)
- ML20199H729 + (ML20199H729)
- 05000295/LER-1996-007, :on 960308,below Freezing Conditions Created Flow Restrictions in SI Pump Recirculation Line.Caused by Design Deficiency.Si Pump Recirculation Line Was Cleared by Securing Purge Sys & Increasing Temperature + (ML20199H730)
- ML20199H731 + (ML20199H731)
- ML20199H732 + (ML20199H732)
- ML20199H737 + (ML20199H737)
- ML20199H739 + (ML20199H739)
- ML20199H740 + (ML20199H740)
- ML20199H743 + (ML20199H743)
- ML20199H745 + (ML20199H745)
- ML20199H746 + (ML20199H746)
- ML20199H751 + (ML20199H751)
- ML20199H752 + (ML20199H752)
- ML20199H756 + (ML20199H756)
- ML20199H759 + (ML20199H759)
- IR 05000382/1998001 + (ML20199H761)
- ML20199H762 + (ML20199H762)
- 05000304/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl + (ML20199H766)
- ML20199H768 + (ML20199H768)
- ML20199H769 + (ML20199H769)
- ML20199H772 + (ML20199H772)
- 05000304/LER-1997-005-07, :on 971021,failed to Test 2A SI Pump Suction Valve in Prescribed Periodicity.Caused by Inadequate Program to Ensure That TS IST Requirements for Each Component Are Met.Ist Group Will Include Second Check in Review + (ML20199H773)
- ML20199H775 + (ML20199H775)
- IR 05000445/1997023 + (ML20199H777)
- ML20199H779 + (ML20199H779)
- ML20199H781 + (ML20199H781)
- ML20199H782 + (ML20199H782)
- ML20199H783 + (ML20199H783)
- ML20199H785 + (ML20199H785)