Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199D189 + (ML20199D189)
- ML20199D193 + (ML20199D193)
- TXX-9724, Forwards MOR for CPSES for Oct 1997.Unit 2 Power Relief Valves Opened After Unit Was Cooled Down to LTOP Arming Temperature (350 Degrees) W/Pressure Above LTOP Setpoint + (ML20199D199)
- ML20199D206 + (ML20199D206)
- 05000528/LER-1986-028, :on 860516,determined That Previous Testing Performed on Halon Portion of Fire Protection Sys Did Not Fulfill Tech Specs as Storage Tanks Could Not Be Calibr. Caused by Personnel Error.Fire Watch Posted + (ML20199D207)
- ML20199D208 + (ML20199D208)
- ML20199D210 + (ML20199D210)
- ML20199D212 + (ML20199D212)
- ML20199D214 + (ML20199D214)
- ML20199D215 + (ML20199D215)
- ML20199D216 + (ML20199D216)
- ML20199D225 + (ML20199D225)
- ML20199D226 + (ML20199D226)
- ML20199D229 + (ML20199D229)
- ML20199D231 + (ML20199D231)
- ML20199D234 + (ML20199D234)
- ML20199D238 + (ML20199D238)
- ML20199D242 + (ML20199D242)
- ML20199D244 + (ML20199D244)
- ML20199D246 + (ML20199D246)
- ML20199D247 + (ML20199D247)
- 05000341/LER-1986-014, :on 860516,while Refueling,Offsite Ac Power to Div 2 Interrupted,Causing half-scram.Caused by Personnel Procedural error.Half-scram Reset & Sys Restored + (ML20199D250)
- IR 05000373/1997018 + (ML20199D256)
- ML20199D259 + (ML20199D259)
- ML20199D260 + (ML20199D260)
- ML20199D261 + (ML20199D261)
- ML20199D263 + (ML20199D263)
- ML20199D265 + (ML20199D265)
- ML20199D268 + (ML20199D268)
- ML20199D269 + (ML20199D269)
- ML20199D272 + (ML20199D272)
- ML20199D274 + (ML20199D274)
- ML20199D279 + (ML20199D279)
- ML20199D280 + (ML20199D280)
- ML20199D281 + (ML20199D281)
- ML20199D282 + (ML20199D282)
- ML20199D283 + (ML20199D283)
- ML20199D290 + (ML20199D290)
- ML20199D294 + (ML20199D294)
- 3F0198-21, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-17.Corrective Actions:Revised B EDG Functional Test Procedure Safety Assessment + (ML20199D298)
- DD-97-26, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-97-26 Has Expired.Decison Became Final Agency Action on 980123. W/Certificate of Svc.Served on 980128 + (ML20199D301)
- ML20199D302 + (ML20199D302)
- ML20199D304 + (ML20199D304)
- ML20199D309 + (ML20199D309)
- ML20199D315 + (ML20199D315)
- ML20199D316 + (ML20199D316)
- ML20199D317 + (ML20199D317)
- ML20199D318 + (ML20199D318)
- ML20199D319 + (ML20199D319)
- ML20199D321 + (ML20199D321)
- ML20199D322 + (ML20199D322)