Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release + (ML20198R845)
- ML20198R846 + (ML20198R846)
- ML20198R847 + (ML20198R847)
- ML20198R848 + (ML20198R848)
- ML20198R851 + (ML20198R851)
- ML20198R853 + (ML20198R853)
- 05000346/LER-1997-016-01, :on 971217,monthly ECCS Valve Position SR Was Missed.Caused by Flow Path That Was Not Part of Contiguous ECCS Flow Path Envisioned for Compliance W/Ts 4.5.2.Verified Valves Open on 971222 + (ML20198R854)
- ML20198R855 + (ML20198R855)
- ML20198R856 + (ML20198R856)
- ML20198R858 + (ML20198R858)
- ML20198R860 + (ML20198R860)
- ML20198R862 + (ML20198R862)
- ML20198R864 + (ML20198R864)
- ML20198R868 + (ML20198R868)
- ML20198R870 + (ML20198R870)
- 05000245/LER-1997-038-01, :on 971008,RB Roof Was Not Analyzed for Seismic Sse.Caused by Failure to Analyze RB Roof for Higher Loads During Sse.Administrative Controls in Place to Prevent Fuel Movement Until RB Roof Has Been Qualified for SSE + (ML20198R871)
- IR 05000369/1986004 + (ML20198R872)
- ML20198R874 + (ML20198R874)
- ML20198R876 + (ML20198R876)
- ML20198R877 + (ML20198R877)
- ML20198R878 + (ML20198R878)
- ML20198R882 + (ML20198R882)
- ML20198R883 + (ML20198R883)
- ML20198R884 + (ML20198R884)
- ML20198R885 + (ML20198R885)
- ML20198R887 + (ML20198R887)
- ML20198R888 + (ML20198R888)
- ML20198R889 + (ML20198R889)
- ML20198R892 + (ML20198R892)
- ML20198R893 + (ML20198R893)
- ML20198R894 + (ML20198R894)
- ML20198R895 + (ML20198R895)
- 05000331/LER-1986-015, :on 860503,fire Suppression Sys Isolation Occurred.Caused by Simultaneous Closures of Manual post- Indicating Valves Due to Inadequate Administrative Procedures.Procedures Revised + (ML20198R896)
- B12102, Forwards Response to 851206 Request for Description of Flow Modeling Methodology Used for three-loop Main Steam Line Break Analysis,Identified as Open Item in Sser 4 (NUREG-1031) + (ML20198R898)
- ML20198R899 + (ML20198R899)
- ML20198R900 + (ML20198R900)
- ML20198R901 + (ML20198R901)
- ML20198R904 + (ML20198R904)
- RBG-23-810, Forwards marked-up Listing of NRC Approved multi-plant Actions,Per 860502 Request + (ML20198R905)
- ML20198R906 + (ML20198R906)
- ML20198R907 + (ML20198R907)
- ML20198R908 + (ML20198R908)
- ML20198R909 + (ML20198R909)
- ML20198R914 + (ML20198R914)
- ML20198R916 + (ML20198R916)
- ML20198R917 + (ML20198R917)
- ML20198R918 + (ML20198R918)
- ML20198R919 + (ML20198R919)
- ML20198R921 + (ML20198R921)
- ML20198R924 + (ML20198R924)
- ML20198R926 + (ML20198R926)