Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196B215 + (ML20196B215)
- ML20196B216 + (ML20196B216)
- ML20196B218 + (ML20196B218)
- ML20196B219 + (ML20196B219)
- ML20196B222 + (ML20196B222)
- 05000423/LER-1999-006, Forwards LER 99-006-00,re Failure of Both Reactor Plant Aerated Drains SR Air Driven Sump Pumps During Technical Requirements Manual Surveillance on 990516.Commitments Also Encl + (ML20196B225)
- ML20196B227 + (ML20196B227)
- ML20196B229 + (ML20196B229)
- VPN-075-98, Informs That,Per Commitments Made in 981119 Meeting with Nrc,Rev to PGE-1075 Will Be Submitted No Later than 981218 + (ML20196B232)
- ML20196B233 + (ML20196B233)
- ML20196B235 + (ML20196B235)
- ML20196B236 + (ML20196B236)
- ML20196B241 + (ML20196B241)
- ML20196B242 + (ML20196B242)
- ML20196B243 + (ML20196B243)
- ML20196B245 + (ML20196B245)
- ML20196B246 + (ML20196B246)
- ML20196B248 + (ML20196B248)
- 05000423/LER-1999-006-01, :on 990516,both Reactor Plant Aerated Drains SR Air Driven Sump Pumps Failed During TRM Surveillance.Caused by Inadequate Preventive Maint Program Design.Surveillance Procedure Sp 3635B.2 Will Be Conducted Monthly + (ML20196B250)
- ML20196B252 + (ML20196B252)
- ML20196B253 + (ML20196B253)
- ML20196B255 + (ML20196B255)
- ML20196B257 + (ML20196B257)
- ML20196B258 + (ML20196B258)
- ML20196B259 + (ML20196B259)
- ML20196B261 + (ML20196B261)
- 05000395/LER-1999-008, :on 990518,manual RT Initiated Due to Main Turbine High Vibration.Caused by Light Rubbing within New Monoblock Turbine Rotor.Reactor Power Was Reduced.With + (ML20196B262)
- RBG-29498, Forwards Supplemental Response to Violations Noted in Insp Rept 50-458/88-18.Corrective Actions:Temporary Change Notice Issued for STP-403-0601 to Reflect Actual Testing Requirements for Standby Gas Treatment Sys.Affidavit Encl + (ML20196B263)
- ML20196B265 + (ML20196B265)
- ML20196B266 + (ML20196B266)
- ML20196B267 + (ML20196B267)
- NOC-AE-000360, Requests Authorization to Use Alternative to Requirements of 10CFR50.55a(g)(6)(ii)(A) to Perform ISI Nondestructive Exam on Essentially 100% of Weld Length of All RPV Welds + (ML20196B268)
- ML20196B271 + (ML20196B271)
- ML20196B273 + (ML20196B273)
- ML20196B275 + (ML20196B275)
- ML20196B276 + (ML20196B276)
- ML20196B277 + (ML20196B277)
- ML20196B279 + (ML20196B279)
- ML20196B280 + (ML20196B280)
- ML20196B281 + (ML20196B281)
- ML20196B285 + (ML20196B285)
- LIC-88-1071, Confirms That Response to Safety Sys Outage Mod Insp Rept 50-285/88-200 Extended to 881219,per Telcon Between PD Milano & Jj Fisicaro + (ML20196B286)
- ML20196B287 + (ML20196B287)
- 05000278/LER-1998-005-03, :on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With + (ML20196B288)
- ML20196B291 + (ML20196B291)
- ML20196B292 + (ML20196B292)
- ML20196B294 + (ML20196B294)
- LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated + (ML20196B298)
- ML20196B299 + (ML20196B299)
- ML20196B300 + (ML20196B300)
- ML20196B303 + (ML20196B303)