Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196B174 + (ML20196B174)
- 05000344/LER-1988-003, :on 880324,single Failure Mechanism Discovered Which Could Result in Overpressurization of Containment Electrical Penetration Seals.Cause Undetermined.Nitrogen Supply to Subj Penetrations Isolated + (ML20196B176)
- ML20196B177 + (ML20196B177)
- ML20196B178 + (ML20196B178)
- ML20196B179 + (ML20196B179)
- ML20196B183 + (ML20196B183)
- ML20196B185 + (ML20196B185)
- ML20196B186 + (ML20196B186)
- ML20196B189 + (ML20196B189)
- ML20196B191 + (ML20196B191)
- ML20196B193 + (ML20196B193)
- ML20196B195 + (ML20196B195)
- ML20196B197 + (ML20196B197)
- ML20196B198 + (ML20196B198)
- ML20196B199 + (ML20196B199)
- ML20196B203 + (ML20196B203)
- IA-98-358, Forwards NRC License 34-24578-01 + (ML20196B204)
- ML20196B204 + (ML20196B204)
- ML20196B206 + (ML20196B206)
- ML20196B207 + (ML20196B207)
- ML20196B209 + (ML20196B209)
- ML20196B211 + (ML20196B211)
- 05000482/LER-1999-007, :on 990519,action Statement 19 of TS 3.3.2 Was Violated.Caused by Inadequate Work Practices.Revised Procedure & Discussed Expectations with Maint & Operations Personnel + (ML20196B212)
- 05000482/LER-1998-006, :on 960119,failure to Correctly Test Portion of Automatic Level Control Circuitry of EDG Fuel Oil Transfer Sys Was Noted.Caused by Failure to Ensure well-constructed License Amend Was Submitted.Revised Procedures & Forms + (ML20196B214)
- ML20196B215 + (ML20196B215)
- ML20196B216 + (ML20196B216)
- ML20196B218 + (ML20196B218)
- ML20196B219 + (ML20196B219)
- ML20196B222 + (ML20196B222)
- 05000423/LER-1999-006, Forwards LER 99-006-00,re Failure of Both Reactor Plant Aerated Drains SR Air Driven Sump Pumps During Technical Requirements Manual Surveillance on 990516.Commitments Also Encl + (ML20196B225)
- ML20196B227 + (ML20196B227)
- ML20196B229 + (ML20196B229)
- VPN-075-98, Informs That,Per Commitments Made in 981119 Meeting with Nrc,Rev to PGE-1075 Will Be Submitted No Later than 981218 + (ML20196B232)
- ML20196B233 + (ML20196B233)
- ML20196B235 + (ML20196B235)
- ML20196B236 + (ML20196B236)
- ML20196B241 + (ML20196B241)
- ML20196B242 + (ML20196B242)
- ML20196B243 + (ML20196B243)
- ML20196B245 + (ML20196B245)
- ML20196B246 + (ML20196B246)
- ML20196B248 + (ML20196B248)
- 05000423/LER-1999-006-01, :on 990516,both Reactor Plant Aerated Drains SR Air Driven Sump Pumps Failed During TRM Surveillance.Caused by Inadequate Preventive Maint Program Design.Surveillance Procedure Sp 3635B.2 Will Be Conducted Monthly + (ML20196B250)
- ML20196B252 + (ML20196B252)
- ML20196B253 + (ML20196B253)
- ML20196B255 + (ML20196B255)
- ML20196B257 + (ML20196B257)
- ML20196B258 + (ML20196B258)
- ML20196B259 + (ML20196B259)
- ML20196B261 + (ML20196B261)
- 05000395/LER-1999-008, :on 990518,manual RT Initiated Due to Main Turbine High Vibration.Caused by Light Rubbing within New Monoblock Turbine Rotor.Reactor Power Was Reduced.With + (ML20196B262)