Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195J049 + (ML20195J049)
- PNO-IV-88-053, on 880615,during State Insp,Minor Amounts of Ir-92 Radioactive Contamination Found Outside Restricted Area of Facility.Caused by Dumping Wash Bucket After Cleaning Workshop.License Suspended Pending Program Mods + (ML20195J050)
- ML20195J052 + (ML20195J052)
- IR 05000440/1998021 + (ML20195J053)
- ML20195J055 + (ML20195J055)
- TXX-8806, Interim Deficiency Rept CP-88-10 Re 15 Kv Bus Ampacity Rating.Design Change Authorization Indicating New Bus Ratings for Rev to Project & Vendor Documents Issued.Next Rept Will Be Submitted No Later than 880304 + (ML20195J056)
- ML20195J057 + (ML20195J057)
- ML20195J059 + (ML20195J059)
- ML20195J060 + (ML20195J060)
- ML20195J061 + (ML20195J061)
- ML20195J062 + (ML20195J062)
- ML20195J063 + (ML20195J063)
- ML20195J064 + (ML20195J064)
- ML20195J065 + (ML20195J065)
- ML20195J066 + (ML20195J066)
- 05000458/LER-1988-006, :on 880219,reactor Shutdown Required by TS Due to Reactor Recirculation Pump Motor Trip.Caused by Moisture Intrusion from Leaking Svc Water Valve.Leaking Valve Repaired & Termination Cabinet Cleaned & Dried + (ML20195J067)
- ML20195J068 + (ML20195J068)
- ML20195J069 + (ML20195J069)
- ML20195J070 + (ML20195J070)
- ML20195J071 + (ML20195J071)
- ML20195J073 + (ML20195J073)
- ML20195J076 + (ML20195J076)
- ML20195J077 + (ML20195J077)
- ML20195J078 + (ML20195J078)
- RBG-29386, Special Rept:On 880825 & 0906,two Injections of ECCS Occurred During Unrelated But Similar Reactor Scrams.Caused by Reactor Scram Initiated by Turbine Control Valve Fast Closure + (ML20195J079)
- ML20195J080 + (ML20195J080)
- ML20195J081 + (ML20195J081)
- ML20195J082 + (ML20195J082)
- ML20195J083 + (ML20195J083)
- ML20195J084 + (ML20195J084)
- ML20195J085 + (ML20195J085)
- ML20195J087 + (ML20195J087)
- ML20195J089 + (ML20195J089)
- ML20195J090 + (ML20195J090)
- ML20195J093 + (ML20195J093)
- ML20195J094 + (ML20195J094)
- ML20195J097 + (ML20195J097)
- ML20195J098 + (ML20195J098)
- ML20195J100 + (ML20195J100)
- ML20195J101 + (ML20195J101)
- ML20195J102 + (ML20195J102)
- ML20195J103 + (ML20195J103)
- ML20195J104 + (ML20195J104)
- ML20195J105 + (ML20195J105)
- ML20195J106 + (ML20195J106)
- PY-CEI-NRR-2404, Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology + (ML20195J107)
- ML20195J108 + (ML20195J108)
- ML20195J109 + (ML20195J109)
- ML20195J110 + (ML20195J110)
- ML20195J111 + (ML20195J111)
- ML20195J113 + (ML20195J113)