Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149G798 + (ML20149G798)
- ML20149G800 + (ML20149G800)
- IR 05000424/1997004 + (ML20149G803)
- ML20149G804 + (ML20149G804)
- IR 05000327/1987075 + (ML20149G805)
- ML20149G806 + (ML20149G806)
- ML20149G808 + (ML20149G808)
- U-602359, Submits Response to Violations Noted in Insp Rept 50-461/94-14.Corrective Actions:B Diesel Fire Pump Fuel Oil Sampled & Analyzed for Presence of Particulate & None Found + (ML20149G809)
- 05000312/LER-1987-048, :on 871228,discovered That Procedure Methodology Failed Adequately to Measure Actual Water Flow from Spray & Sprinkler Header.Caused by Misinterpretation of Tech Spec Requirements.Procedure Revised + (ML20149G810)
- ML20149G811 + (ML20149G811)
- B14999, Requests to Use Alternative to Section XI of ASME Boiler & Pressure Vessel Code for Unit 1,per 10CFR50.55a(a)(3) + (ML20149G812)
- ML20149G813 + (ML20149G813)
- ML20149G814 + (ML20149G814)
- NRC-94-4318, Forwards non-proprietary WCAP-14191, Scaling Analysis for AP600 Passive Containment Cooling Sys, & Proprietary WCAP-14190, Scaling Analysis for AP600 Passive Containment Cooling Sys.Proprietary Portion of Doc Sent to Westinghouse + (ML20149G816)
- ML20149G820 + (ML20149G820)
- ML20149G822 + (ML20149G822)
- ML20149G823 + (ML20149G823)
- ML20149G825 + (ML20149G825)
- 05000440/LER-1988-005, :on 880107,reactor Protection Sys Bus Power Supply Transfer Resulted in RHR Shutdown Cooling Isolation. Caused by Personnel Error.Operating Personnel Counseled & Plant Instructions Will Be Enhanced + (ML20149G826)
- ML20149G827 + (ML20149G827)
- ML20149G828 + (ML20149G828)
- ML20149G831 + (ML20149G831)
- IR 05000413/1997007 + (ML20149G832)
- ML20149G834 + (ML20149G834)
- ML20149G836 + (ML20149G836)
- ML20149G837 + (ML20149G837)
- 05000498/LER-1988-005, :on 880110,inadequate Surveillance Performed on Control Room Intake Air Radioactivity Monitor.Caused by Procedure & Operator Errors.Procedures Will Be Revised & Addl Guidance Will Be Given to Operators + (ML20149G841)
- ML20149G842 + (ML20149G842)
- ML20149G847 + (ML20149G847)
- ML20149G849 + (ML20149G849)
- ML20149G850 + (ML20149G850)
- ML20149G851 + (ML20149G851)
- ML20149G852 + (ML20149G852)
- ML20149G853 + (ML20149G853)
- ML20149G855 + (ML20149G855)
- ML20149G856 + (ML20149G856)
- ML20149G857 + (ML20149G857)
- ML20149G858 + (ML20149G858)
- ML20149G860 + (ML20149G860)
- ML20149G862 + (ML20149G862)
- ML20149G863 + (ML20149G863)
- LIC-94-0227, Advises of Extension of Schedule for Performance of EDG Hot Weather Testing at Plant from During Summer of 1994 to Summer of 1995,or Subsequent Summers,As Conditions Permit + (ML20149G864)
- B14720, Requests NRC Review & Approval of Revised Basis for Fire Protection Exemption + (ML20149G865)
- ML20149G868 + (ML20149G868)
- ML20149G871 + (ML20149G871)
- ML20149G876 + (ML20149G876)
- ML20149G877 + (ML20149G877)
- PNO-III-88-010, on 880210,as Result of Ongoing Investigation, 12 Contractor Fire Surveillance Personnel Terminated & 34 Addl Individuals Suspended.Caused by Discrepancies in Electronic Door Entry Records & Workers Records + (ML20149G878)
- ML20149G879 + (ML20149G879)
- ML20149G880 + (ML20149G880)
- ML20149G882 + (ML20149G882)