Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138Q141 + (ML20138Q141)
- ML20138Q144 + (ML20138Q144)
- ML20138Q145 + (ML20138Q145)
- ML20138Q147 + (ML20138Q147)
- ML20138Q148 + (ML20138Q148)
- ML20138Q149 + (ML20138Q149)
- ML20138Q151 + (ML20138Q151)
- ML20138Q152 + (ML20138Q152)
- ML20138Q153 + (ML20138Q153)
- ML20138Q154 + (ML20138Q154)
- IR 05000914/2010025 + (ML20138Q155)
- ML20138Q156 + (ML20138Q156)
- 05000245/LER-1997-006, Forwards LER 97-006-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 1 on 970131, Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed + (ML20138Q158)
- PNO-II-85-120, on 851119 & 1217,concentrated Hydrazine/ Ammonia Mixture Leaked from Steam Generator Vent Valve. Personnel Evacuated.Several Cases of Breathing Difficulties Noted + (ML20138Q159)
- ML20138Q160 + (ML20138Q160)
- ML20138Q161 + (ML20138Q161)
- ML20138Q163 + (ML20138Q163)
- IR 05000277/1985029 + (ML20138Q164)
- ML20138Q164 + (ML20138Q164)
- ML20138Q167 + (ML20138Q167)
- ML20138Q168 + (ML20138Q168)
- ML20138Q170 + (ML20138Q170)
- U-602704, Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys + (ML20138Q171)
- ML20138Q172 + (ML20138Q172)
- ML20138Q173 + (ML20138Q173)
- ML20138Q176 + (ML20138Q176)
- ML20138Q180 + (ML20138Q180)
- ML20138Q181 + (ML20138Q181)
- ML20138Q182 + (ML20138Q182)
- ML20138Q184 + (ML20138Q184)
- ML20138Q185 + (ML20138Q185)
- ML20138Q187 + (ML20138Q187)
- 05000245/LER-1997-006-01, :on 970131,failure to Exert Best Efforts to Restore Radwaste Effluent Line Radiation Monitor to Operable Status Occurred.Caused by Failure to Provide Clear Management Expectations.Management Will Be Provided + (ML20138Q188)
- IR 05000309/1985024 + (ML20138Q189)
- ML20138Q190 + (ML20138Q190)
- IR 015000004/1997001 + (ML20138Q191)
- ML20138Q192 + (ML20138Q192)
- ML20138Q193 + (ML20138Q193)
- ML20138Q194 + (ML20138Q194)
- ML20138Q195 + (ML20138Q195)
- ML20138Q197 + (ML20138Q197)
- ML20138Q198 + (ML20138Q198)
- ML20138Q199 + (ML20138Q199)
- ML20138Q200 + (ML20138Q200)
- 05000245/LER-1996-046-03, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed + (ML20138Q202)
- IR 05000155/1985020 + (ML20138Q203)
- ML20138Q205 + (ML20138Q205)
- ML20138Q206 + (ML20138Q206)
- ML20138Q208 + (ML20138Q208)
- ML20138Q209 + (ML20138Q209)
- L-85-043, Forwards Amend to Security Plan.Amend Withheld (Ref 10CFR2.790 & 73.21) + (ML20138Q210)