ML20138Q147

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-277/85-29 & 50-278/85-33 on 850914-1025 & Notice of Violation.Info on Mgt Controls Used to Ensure Plant Operations Review Committee Procedures Not Revised in Less Conservative Manner Needed
Date released: 05/31/2020 Download: ML20138Q147


Insp Repts 50-277/85-29 & 50-278/85-33 on 850914-1025. Violations Noted:Failure to Calibr Portal Monitor,Failure to Manually Test Relief Valves During Cycle 6 & Failure to Rept Reactor Protection Sys Actuations from 850829-1015
ML20138Q164
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/18/1985
From: Beall J, Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20138Q164 (31)
Notice of Violation from Insp on 850914-1025
ML20138Q155
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/20/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20138Q155 (2)
Forwards Insp Repts 50-277/85-29 & 50-278/85-33 on 850914-1025 & Notice of Violation.Info on Mgt Controls Used to Ensure Plant Operations Review Committee Procedures Not Revised in Less Conservative Manner Needed
ML20138Q144
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/20/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: DALTROFF S L
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
Download: ML20138Q144 (2)