Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000315/1985038 + (ML20138P006)
- ML20138P008 + (ML20138P008)
- ML20138P010 + (ML20138P010)
- PNO-II-85-119, on 851216,painter Fell 20 Ft from Scaffold While Working in Containment.Painter Hospitalized in Stable Condition,But W/Serious Head & Back Injuries.State of Ga & OSHA Notified + (ML20138P011)
- ML20138P013 + (ML20138P013)
- ML20138P014 + (ML20138P014)
- ML20138P016 + (ML20138P016)
- ML20138P017 + (ML20138P017)
- ML20138P018 + (ML20138P018)
- ML20138P019 + (ML20138P019)
- ML20138P020 + (ML20138P020)
- ML20138P021 + (ML20138P021)
- ML20138P022 + (ML20138P022)
- ML20138P024 + (ML20138P024)
- IR 05000458/1985076 + (ML20138P025)
- ML20138P026 + (ML20138P026)
- ML20138P027 + (ML20138P027)
- ML20138P028 + (ML20138P028)
- ML20138P029 + (ML20138P029)
- ML20138P030 + (ML20138P030)
- ML20138P032 + (ML20138P032)
- ML20138P033 + (ML20138P033)
- ML20138P034 + (ML20138P034)
- 05000413/LER-1985-065, :on 851115,motor-driven Auxiliary Feedwater Pumps auto-started Following Main Feedwater Pump Turbine Trip.Caused by Defective Reactor Trip Breaker Test Procedure.Procedures Revised + (ML20138P036)
- ML20138P037 + (ML20138P037)
- ML20138P038 + (ML20138P038)
- ML20138P040 + (ML20138P040)
- ML20138P041 + (ML20138P041)
- ML20138P043 + (ML20138P043)
- ML20138P045 + (ML20138P045)
- ML20138P046 + (ML20138P046)
- ML20138P047 + (ML20138P047)
- 05000261/LER-1985-023-01, :on 851118,discrepancy Identified Between Tech Spec Steam/Feedwater Flow Mismatch Test Requirement & Monthly Maint Surveillance Test MST-014.Caused by Failure to Verify Setpoints of Comparators + (ML20138P048)
- ML20138P049 + (ML20138P049)
- ML20138P050 + (ML20138P050)
- ML20138P051 + (ML20138P051)
- ML20138P053 + (ML20138P053)
- ML20138P056 + (ML20138P056)
- ML20138P058 + (ML20138P058)
- ML20138P060 + (ML20138P060)
- ML20138P061 + (ML20138P061)
- ML20138P062 + (ML20138P062)
- ML20138P064 + (ML20138P064)
- ML20138P065 + (ML20138P065)
- ML20138P066 + (ML20138P066)
- 05000278/LER-1985-018-02, :on 840711,fault Occurred in cross-tie Between North & South Substations During Lightning Storm.Caused by Insulator Strip Flashover Due to Lightning Strike.Offsite Power Restored to Plant Startup Bus + (ML20138P067)
- ML20138P068 + (ML20138P068)
- PNO-IV-85-064A, on 851212,offsite Power Loss Occurred During Electrical Storm When Switchyard Breakers Tripped Because of Ground Current from Startup Transformers.Trip Relays Reset from 1,200 to 2,400 Amps + (ML20138P069)
- ML20138P070 + (ML20138P070)
- PY-CEI-NRR-0417, Certifies Completion of Work Needed to Close All But Seven Human Engineering Discrepancies (Heds) Required by Fuel Load,Per Suppl 1 to Dcrdr Summary Rept Submitted on 851014. Remaining Seven Heds Will Be Completed Prior to Fuel Load + (ML20138P072)
- ML20138P074 + (ML20138P074)