Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IA-85-663, Summary of 850725 Meeting W/Licensee Re Integrated Living Schedules Requested by Generic Ltr 85-07.Attendance List, Agenda & Viewgraphs Encl + (ML20138L975)
- ML20138L976 + (ML20138L976)
- ML20138L978 + (ML20138L978)
- ML20138L982 + (ML20138L982)
- ML20138L983 + (ML20138L983)
- ML20138L985 + (ML20138L985)
- ML20138L986 + (ML20138L986)
- ML20138L989 + (ML20138L989)
- ML20138L990 + (ML20138L990)
- ML20138L995 + (ML20138L995)
- ML20138L996 + (ML20138L996)
- ML20138L997 + (ML20138L997)
- ML20138M001 + (ML20138M001)
- ML20138M006 + (ML20138M006)
- ML20138M007 + (ML20138M007)
- ML20138M010 + (ML20138M010)
- ML20138M011 + (ML20138M011)
- ML20138M012 + (ML20138M012)
- ML20138M015 + (ML20138M015)
- ML20138M020 + (ML20138M020)
- ML20138M021 + (ML20138M021)
- ML20138M023 + (ML20138M023)
- 05000266/LER-1997-006, :on 970120,refueling Cavity Drain Failed During Loca.Caused by Inadequate Evaluation of Original Design.Design of Refueling Cavity Drains Was Revised with Respect Capability to Withstand an Earthquake + (ML20138M024)
- ML20138M026 + (ML20138M026)
- ML20138M030 + (ML20138M030)
- ML20138M032 + (ML20138M032)
- IR 05000443/1985015 + (ML20138M034)
- ML20138M035 + (ML20138M035)
- ML20138M038 + (ML20138M038)
- ML20138M043 + (ML20138M043)
- ML20138M044 + (ML20138M044)
- ML20138M048 + (ML20138M048)
- ML20138M054 + (ML20138M054)
- B16121, Responds to NRC Re Violations Noted in Insp Rept 50-213/96-11.Corrective Actions:Cyapco Will Write New Procedure to Provide Guidance in Assessing Operability. Procedure Will Be Issued by 970630 + (ML20138M055)
- ML20138M057 + (ML20138M057)
- ML20138M058 + (ML20138M058)
- 05000245/LER-1985-018, :on 850927,loss of Normal Power Occurred Causing Various Isolations & Sys Initiations.Caused by Hurricane Gloria + (ML20138M061)
- ML20138M062 + (ML20138M062)
- ST-HL-AE-1555, Forwards Rept 3,Colorado River Entrainment & Impingement Monitoring Program,Phase 2 Studies,Jul-Sept 1985, Per Fes + (ML20138M065)
- ML20138M066 + (ML20138M066)
- ML20138M069 + (ML20138M069)
- ML20138M070 + (ML20138M070)
- ML20138M071 + (ML20138M071)
- ML20138M072 + (ML20138M072)
- ML20138M076 + (ML20138M076)
- ML20138M081 + (ML20138M081)
- ML20138M083 + (ML20138M083)
- ML20138M086 + (ML20138M086)
- SNRC-1215, Forwards Executive Summary Rept,For Low Power Testing.Four Sys Will Require Retesting.Minor HPCI & RCIC Testing for Controls Tuning & Addl Testing on Reactor Vessel Water Level Instrumentation Will Proceed Following Outage + (ML20138M087)
- IR 05000219/1985021 + (ML20138M089)
- ML20138M090 + (ML20138M090)