Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138L708 + (ML20138L708)
- ML20138L712 + (ML20138L712)
- ML20138L713 + (ML20138L713)
- ML20138L715 + (ML20138L715)
- ML20138L717 + (ML20138L717)
- ML20138L718 + (ML20138L718)
- ML20138L721 + (ML20138L721)
- ML20138L723 + (ML20138L723)
- BSEP-97-0070, Provides Addl Info Re Root Cause & Corrective Actions Associated W/Failure of Multiple Chlorine Detectors as Specified in Response to Violations Noted in Insp Repts 50-324/96-15 & 50-325/96-15 + (ML20138L725)
- ML20138L726 + (ML20138L726)
- 05000331/LER-1997-001, :on 970115,failure to Comply with TS for Main Steam Line Radiation Monitors Occurred.Caused by Less than Adequate Implementation of post-outage NMCA Test.Mslrm Were Set in Accordance with TS + (ML20138L729)
- ML20138L730 + (ML20138L730)
- NG-97-0245, Provides Response to RAI Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info + (ML20138L733)
- IR 05000029/1985021 + (ML20138L735)
- ML20138L736 + (ML20138L736)
- ML20138L738 + (ML20138L738)
- ML20138L739 + (ML20138L739)
- ML20138L742 + (ML20138L742)
- ML20138L743 + (ML20138L743)
- ML20138L745 + (ML20138L745)
- ML20138L749 + (ML20138L749)
- ML20138L750 + (ML20138L750)
- ML20138L751 + (ML20138L751)
- ML20138L752 + (ML20138L752)
- ML20138L755 + (ML20138L755)
- ML20138L757 + (ML20138L757)
- ML20138L759 + (ML20138L759)
- 05000336/LER-1985-014, :on 850927,orderly Shutdown Commenced as Precautionary Measure Due to Hurricane Gloria.Grounding Problems Caused Unit to Divorce from Offsite Power.Unit Returned to Normal Hot Shutdown Condition + (ML20138L760)
- ML20138L761 + (ML20138L761)
- NUREG-1433, Discusses 960906 TVA Submittal Application to Amend Operating Licenses for Plants.Amend Proposes to Convert BFN Current TS to Improve TS Based Upon ISTS Format Given in NUREG-1433.NRC Staff Concluded Submittal Inadequate + (ML20138L763)
- ML20138L767 + (ML20138L767)
- ML20138L769 + (ML20138L769)
- ML20138L772 + (ML20138L772)
- 05000341/LER-1985-061, :on 850924,reactor Water Cleanup Sys Isolated. Caused by Incorrect Module Leads Being Lifted,Simulating High Temp Signal.Sys Isolated Again on High Differential Flow Signal Due to Flow Problems + (ML20138L773)
- ML20138L775 + (ML20138L775)
- ML20138L777 + (ML20138L777)
- 05000454/LER-1985-084-01, :on 850924,fire Watch Delayed.Caused by Key Stuck in Vital Area Door Lock.Fire Watch Resumed After Another Security Person Arrived to Attend Door.Lock Repaired + (ML20138L782)
- IR 05000271/1985035 + (ML20138L783)
- ML20138L786 + (ML20138L786)
- ML20138L788 + (ML20138L788)
- ML20138L790 + (ML20138L790)
- ML20138L791 + (ML20138L791)
- ML20138L792 + (ML20138L792)
- ML20138L794 + (ML20138L794)
- ML20138L796 + (ML20138L796)
- U-600370, Forwards Response to Unresolved Items Identified by Sqrt 850827-30 Insp Concerning SER Outstanding Issue 7ii, Seismic & Dynamic Qualification of Equipment. Response to Sqrt Open Items NSSS 3.1,BOP 2.1 & 2.2 Also Encl + (ML20138L798)
- ML20138L800 + (ML20138L800)
- ML20138L801 + (ML20138L801)
- ML20138L802 + (ML20138L802)
- ML20138L803 + (ML20138L803)
- 1CAN029703, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 1 + (ML20138L806)