Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135B916 + (ML20135B916)
- ML20135B919 + (ML20135B919)
- 05000315/LER-1985-038, :on 850806 & 23,during Surveillance Testing, ESF Ventilation Sys Charcoal Absorber Banks Inoperable. Caused by Carbon Settling in Banks.Investigation of Event & Generic Implications Underway + (ML20135B920)
- ML20135B921 + (ML20135B921)
- ML20135B922 + (ML20135B922)
- ML20135B924 + (ML20135B924)
- ML20135B928 + (ML20135B928)
- 05000295/LER-1985-029-03, :on 850808,during Aircraft Fire Detection Sys Test (PT-210),diesel Generator 1A & 1B Room Ventilation Fan Outlet Butterfly Dampers Failed to Close at Proper Time. Caused by Stuck Pilot Valves.Valves Replaced + (ML20135B931)
- ML20135B933 + (ML20135B933)
- ML20135B935 + (ML20135B935)
- JAFP-96-0474, Responds to NRC Re Violations Noted in Insp Rept 50-333/96-06.Corrective Action:Training on Procedure Changes Was Conducted with Plant Staff + (ML20135B936)
- 05000304/LER-1985-015-06, :on 850809,during Aircraft Fire Detection Sys Test (PT-210),diesel Generator 2A & 2B Room Ventilation Fan Outlet Butterfly Dampers Failed to Close.Caused by Stuck Pilot Valves.Valves Replaced + (ML20135B939)
- ML20135B940 + (ML20135B940)
- ML20135B943 + (ML20135B943)
- ML20135B947 + (ML20135B947)
- ML20135B950 + (ML20135B950)
- ML20135B951 + (ML20135B951)
- ML20135B954 + (ML20135B954)
- ML20135B955 + (ML20135B955)
- ML20135B959 + (ML20135B959)
- ML20135B961 + (ML20135B961)
- ML20135B964 + (ML20135B964)
- ML20135B967 + (ML20135B967)
- ML20135B969 + (ML20135B969)
- ML20135B971 + (ML20135B971)
- ML20135B974 + (ML20135B974)
- ML20135B975 + (ML20135B975)
- 05000454/LER-1985-078, :on 850807,during Delta I Calibrs,Reactor Tripped on Power Range High Negative Flux Rate.Caused by Personnel Error.Instrument Maint Dept Personnel Counseled & Surveillance Procedures Revised + (ML20135B977)
- ML20135B978 + (ML20135B978)
- ML20135B980 + (ML20135B980)
- ML20135B981 + (ML20135B981)
- 05000280/LER-1984-020, :on 840926,reactor Trip Occurred Due to Reactor Coolant Pump (RCP) Motor C Trip.Caused by Complete Separation of Phase Main Load Connection Bus Bar A.All Bus Bars in RCP Replaced + (ML20135B982)
- ML20135B983 + (ML20135B983)
- ML20135B985 + (ML20135B985)
- ML20135B986 + (ML20135B986)
- ML20135B987 + (ML20135B987)
- ML20135B990 + (ML20135B990)
- ML20135B992 + (ML20135B992)
- ML20135B993 + (ML20135B993)
- ML20135B995 + (ML20135B995)
- ML20135B997 + (ML20135B997)
- ML20135B998 + (ML20135B998)
- ML20135C000 + (ML20135C000)
- ML20135C003 + (ML20135C003)
- ML20135C004 + (ML20135C004)
- ML20135C007 + (ML20135C007)
- ML20135C008 + (ML20135C008)
- ML20135C011 + (ML20135C011)
- ML20135C012 + (ML20135C012)
- ML20135C014 + (ML20135C014)
- ML20135C015 + (ML20135C015)