Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-43339, Responds to NRC Re Violations Noted in Insp Rept 50-458/96-12.Corrective Actions:Restored Transmitter to Svc,Verified Nuclear Boiler Instrumentation line-up & Performed Verification of 2,650 Safety Related Valves + (ML20134L428)
- ML20134L429 + (ML20134L429)
- 05000282/LER-1996-018, :on 961010,surveillance of Low Pressure Start of Component Cooling Pumps Was Missed Due to Inadequate Procedure.Procedures Will Be Revised by 970215 to Test Low Pressure auto-start of Component Cooling Pumps + (ML20134L430)
- ML20134L431 + (ML20134L431)
- LG-85-000, Forwards Changes to FSAR Table 3.2-1 Re Structures,Sys & Components Classification.Changes Will Be Incorporated Into Next Rev to Updated FSAR + (ML20134L432)
- ML20134L433 + (ML20134L433)
- RBG-43668, Forwards Response to NRC 961009 Request for Info Per 10CFR50.54(f) Re Adequacy & Availability of Design Basis Info + (ML20134L434)
- ML20134L435 + (ML20134L435)
- ML20134L437 + (ML20134L437)
- ML20134L439 + (ML20134L439)
- ML20134L440 + (ML20134L440)
- ML20134L442 + (ML20134L442)
- ML20134L443 + (ML20134L443)
- ML20134L446 + (ML20134L446)
- ML20134L447 + (ML20134L447)
- ML20134L448 + (ML20134L448)
- ML20134L449 + (ML20134L449)
- ML20134L450 + (ML20134L450)
- ML20134L451 + (ML20134L451)
- ML20134L452 + (ML20134L452)
- ML20134L457 + (ML20134L457)
- ML20134L458 + (ML20134L458)
- ML20134L460 + (ML20134L460)
- ML20134L461 + (ML20134L461)
- ML20134L462 + (ML20134L462)
- ML20134L463 + (ML20134L463)
- 05000414/LER-1994-002, :on 940615,reactor Trip Breakers Opened Due to Component Failure.Failed Firing Cards Were Replaced, Remaining Firing Cards in Stock Tested & Procedures Revised + (ML20134L465)
- ML20134L466 + (ML20134L466)
- ML20134L468 + (ML20134L468)
- ML20134L470 + (ML20134L470)
- 05000237/LER-1985-031-03, :on 850727,east Bank Scram Discharge Vol hi-hi Water Level Scram Occurred.Caused by Steam Generated from Reactor Bldg Drain Header.Trip Setpoint of Instruments Lowered & Engineering Analysis Performed + (ML20134L471)
- ML20134L472 + (ML20134L472)
- U-600209, Part 21 Rept (21-85-03) Re Failure of Actuator to Valve Stem Coupling During Testing of Hammel-Dahl 2500 Valve (GE PRC 89-14).Caused by Improper Test Startup.Evaluation Underway + (ML20134L474)
- ML20134L477 + (ML20134L477)
- ML20134L479 + (ML20134L479)
- DD-96-15, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-15 Expired.Decision Final Agency Action on 961112.W/certificate of Service.Served on 961115 + (ML20134L480)
- ML20134L482 + (ML20134L482)
- 05000412/LER-1996-005-01, :on 961011,motor Control Ctr Auxiliary Control Relays Failed Due to Thermal Aging.Replaced 203 Active J12 Relays + (ML20134L485)
- ML20134L489 + (ML20134L489)
- ML20134L490 + (ML20134L490)
- ML20134L492 + (ML20134L492)
- ML20134L493 + (ML20134L493)
- ML20134L494 + (ML20134L494)
- ML20134L496 + (ML20134L496)
- IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities + (ML20134L496)
- ML20134L501 + (ML20134L501)
- DD-96-13, Informs That Time Provided by NRC Regulation for Commission to Act to Review Directors Decision DD-96-13 Has Expired. Decision Became Final Agency Action on 961101.W/Certificate of Svc.Served on 961115 + (ML20134L502)
- PNO-III-85-076, on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry + (ML20134L503)
- ML20134L505 + (ML20134L505)
- PY-CEI-NRR-2140, Monthly Operating Rept for Jan 1997 for Perry Unit 1 + (ML20134L507)
- 3F1196-01, Forwards Rev 23 to Crystal River Unit 3,FSAR Which Satisfies Requirements of 10CFR50.71(e)(4) & Includes Matl Which Describes Organization,Mods or Changes to CR-3 That Have Been Implemented as of End of Refuel 10 + (ML20134L508)