Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134K597 + (ML20134K597)
- ML20134K598 + (ML20134K598)
- ML20134K599 + (ML20134K599)
- ML20134K600 + (ML20134K600)
- ML20134K601 + (ML20134K601)
- ML20134K602 + (ML20134K602)
- ML20134K605 + (ML20134K605)
- ML20134K606 + (ML20134K606)
- 05000254/LER-1996-021, Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made + (ML20134K608)
- ML20134K609 + (ML20134K609)
- ML20134K610 + (ML20134K610)
- ML20134K611 + (ML20134K611)
- ML20134K612 + (ML20134K612)
- ML20134K614 + (ML20134K614)
- ML20134K615 + (ML20134K615)
- ML20134K618 + (ML20134K618)
- ML20134K619 + (ML20134K619)
- ML20134K622 + (ML20134K622)
- ML20134K625 + (ML20134K625)
- ML20134K626 + (ML20134K626)
- ML20134K627 + (ML20134K627)
- ML20134K628 + (ML20134K628)
- ML20134K629 + (ML20134K629)
- 05000254/LER-1996-021-01, :on 961011,B CR HVAC Sys Was Declared Inoperable Due to Crankcase Heater Power Supply Design Deficiency.Design Change Notice 9600380 Issued,Which Replaced Crankcase Heater W/Safety Related Heater + (ML20134K630)
- ML20134K631 + (ML20134K631)
- ML20134K632 + (ML20134K632)
- ML20134K634 + (ML20134K634)
- 05000362/LER-1996-006-01, :on 961025,CPIS Actuated W/Unit 3 in Mode 1 at Full Power.Caused by Radiation Increase Inside Due to Small Pressurizer Vapor Space Leak.Tsip Revising Cpis Actuation Setpoint Installed on 961101 + (ML20134K635)
- ML20134K636 + (ML20134K636)
- ML20134K637 + (ML20134K637)
- ML20134K643 + (ML20134K643)
- ML20134K645 + (ML20134K645)
- ML20134K646 + (ML20134K646)
- ML20134K648 + (ML20134K648)
- ML20134K650 + (ML20134K650)
- ML20134K652 + (ML20134K652)
- ML20134K653 + (ML20134K653)
- 05000369/LER-1996-003-01, Forwards LER 96-003-01 Re Concurrent Inoperability of Edgs. Rev Submitted to Provide Addl Info Re Troubleshooting of Components Removed from EDG 1A + (ML20134K654)
- ML20134K655 + (ML20134K655)
- ML20134K656 + (ML20134K656)
- ML20134K657 + (ML20134K657)
- ML20134K658 + (ML20134K658)
- ML20134K659 + (ML20134K659)
- ML20134K661 + (ML20134K661)
- ML20134K662 + (ML20134K662)
- ML20134K663 + (ML20134K663)
- ML20134K667 + (ML20134K667)
- 05000369/LER-1996-003, :on 960618,during Scheduled Operability Test of EDG 1A,EDG Declared Inoperable.Caused by Equipment Failure/ Malfuction of EDG 1A & Equipment Failure & Mfg Process Deficiency of EDG 1B.EDGs SD & Failed Components Replaced + (ML20134K674)
- ML20134K675 + (ML20134K675)
- ML20134K678 + (ML20134K678)
- ML20134K679 + (ML20134K679)