- 05000458/LER-1993-001, :on 930113,determined That RWCU Isolation Setpoint Allowable Value Was Exceeded Due to Faulty Thermocouple Tester.All Three STPs Were Performed in Jan 1993 & Improper Settings Corrected + (ML20134B263)
- ML20134B264 + (ML20134B264)
- 05000382/LER-1992-018-01, :on 920930,loss of 3A3-S Safety Bus Experienced When Bus Feeder Breaker Tripped Open on Degraded Voltage Condition.Caused by Personnel Error.Design Change Package Implementation Process Will Be Revised + (ML20134B265)
- ML20134B266 + (ML20134B266)
- ML20134B267 + (ML20134B267)
- ML20134B270 + (ML20134B270)
- NSD-NRC-97-4953, Forwards One Page Statement of Intent to Be Filed in Copy of Emergency Response Guidelines Between Cover Page & Table of Contents + (ML20134B271)
- ML20134B272 + (ML20134B272)
- 05000285/LER-1991-007, :on 910320,identified twenty-one 480 Volt Molded Case Circuit Breakers Outside Design Basis.Caused by Deficiencies in Original Sys Design.Dbds Compiled as Part of Licensees Reconstitution Program + (ML20134B273)
- ML20134B275 + (ML20134B275)
- ML20134B276 + (ML20134B276)
- 05000325/LER-1992-028, :on 921212,group 6 Reactor Bldg Ventilation Sys Isolation & SBGT Initiation for Both Units Occurred During Plant Modification Wire Lift.All Affected Sys Restored to Normal Standby Lineup + (ML20134B278)
- IR 05000528/1976004 + (ML20134B280)
- 05000254/LER-1992-020, :on 920920,determined That TS 3.7.A.2.a.2 Limit Exceeded While Performing LLRT of Atmospheric Containment,Atmospheric Dilution & SGTR Isolation Valve. Caused by Bonnet Leak.Valve Flushed + (ML20134B281)
- RBG-43-653, Forwards River Bend Station Tier II Chemical List Update + (ML20134B284)
- 05000425/LER-1993-001-02, :on 930129,discovered That Low Temp Lift Settings on PORVs Incorrect & Valves Relied Upon to Meet TS Requirements for Cold Overpressure Protection Sys.Caused by Inadequate Procedures.Setpoints Corrected + (ML20134B285)
- ML20134B287 + (ML20134B287)
- 05000443/LER-1992-026, :on 920714,discovered That Three of Four Cover Bolts on Resin Sluice Discharge Valve Fractured,Resulting in Loosening of Valve Bonnet.Caused by High Matl Hardness.Bolts in Plug Valves Replaced + (ML20134B288)
- ML20134B289 + (ML20134B289)
- 05000443/LER-1993-004, :on 930118,determined That 4 H Flow Estimate for Effluent Releases W/Flowmeter Inoperable Exceeded by 35 Minutes.Caused by Chemistry Technician Error.Technician Counseled & Event Will Be Reviewed + (ML20134B290)
- ML20134B291 + (ML20134B291)
- ML20134B292 + (ML20134B292)
- ML20134B294 + (ML20134B294)
- ML20134B295 + (ML20134B295)
- ML20134B296 + (ML20134B296)
- 05000362/LER-1993-001, :on 930116,main Generator Tripped on Stator Ground Protection Signal Causing Turbine/Reactor Trip.Caused by Water Intrusion.Addl Sealing Provided for Main Generator Terminal Encl to Minimize Water Intrusion + (ML20134B297)
- 05000341/LER-1993-003, :on 930106,TS Required Recorder Discovered Not to Be Qualified Due to Procedural deficiency.Non-qualified Recorder Installed in Main Control Room Div 2 Panel Replaced W/Qualified Recorder + (ML20134B299)
- ML20134B301 + (ML20134B301)
- 05000266/LER-1993-001, Revised LER 93-001-00:on 930107,all 4,160 Volt Degraded Grid Voltage Protection Channels Declared Inoperable Due to Discovery That Settings for Relays on Subj Channels Being Too Low.Plant Mods Will Be Made + (ML20134B302)
- ML20134B304 + (ML20134B304)
- 05000353/LER-1993-002-01, :on 930124,improperly Connected Wires Discovered in Circuit Breakers Caused EDG to Be Inoperable & Violation of TS to Occur.Procedure S93.O.C Will Be Revised + (ML20134B307)
- ML20134B308 + (ML20134B308)
- ML20134B309 + (ML20134B309)
- 05000344/LER-1993-001, :on 921008,determined That Sleeved Conduit Penetration Did Not Have Internal Seal Between Sleeve & Conduit Due to Personnel Error.Incorrect Drawing A-116 Revised to Show Wall Containing Penetration + (ML20134B310)
- ML20134B311 + (ML20134B311)
- ML20134B313 + (ML20134B313)
- 05000271/LER-1992-017, :on 920529 & 0623,EDG a Rendered Inoperable After Completing 8 H Monthly Surveillance.Caused by Crack in Cylinder Liner 7 & Cylinder Liner 10.Cylinder Liners Replaced.Not Reportable Per Part 21 + (ML20134B314)
- ML20134B315 + (ML20134B315)
- ML20134B318 + (ML20134B318)
- ML20134B319 + (ML20134B319)
- ML20134B322 + (ML20134B322)
- ML20134B323 + (ML20134B323)
- ML20134B325 + (ML20134B325)
- ML20134B327 + (ML20134B327)
- IR 05000528/1977003 + (ML20134B328)
- ML20134B330 + (ML20134B330)