Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133L065 + (ML20133L065)
- ML20133L067 + (ML20133L067)
- ML20133L068 + (ML20133L068)
- ML20133L069 + (ML20133L069)
- BSEP-97-0001, Responds to NRC 961113 & 15 Ltr Re Violations Noted in Insp Repts 50-324/96-17 & 50-325/96-17.Corrective Actions: Security Instruction OSI-20 Reporting of Safeguards Events Was Revised + (ML20133L071)
- ML20133L072 + (ML20133L072)
- ML20133L073 + (ML20133L073)
- 3F0785-20, Suppls Response to Violations Noted in Insp Rept 50-302/85-07.Corrective Actions:Administrative Instruction 1100 Revised to Reflect Current FSAR Record Retention Requirements + (ML20133L075)
- ML20133L076 + (ML20133L076)
- ML20133L078 + (ML20133L078)
- ML20133L079 + (ML20133L079)
- ML20133L080 + (ML20133L080)
- ML20133L082 + (ML20133L082)
- ML20133L083 + (ML20133L083)
- B11799, Forwards Integrated Safety Assessment Program Topic 1.21, Fault Transfers. Disarming or Removal of Six Remaining Automatic Bus Transfers in 480 Volt ac,120 Volt Ac & 125 Volt Dc Impractical Due to Safety Function of Devices + (ML20133L084)
- ML20133L085 + (ML20133L085)
- ML20133L087 + (ML20133L087)
- 05000341/LER-1985-062, :on 850909,intermediate Range Monitor Channels B & D Inoperable Due to Weekly Channel Functional Test Not Completed on Time.Caused by Staff Not Being Aware of Surveillance Time Limit.Test Completed + (ML20133L088)
- ML20133L089 + (ML20133L089)
- ML20133L091 + (ML20133L091)
- ML20133L092 + (ML20133L092)
- ML20133L094 + (ML20133L094)
- ML20133L097 + (ML20133L097)
- ML20133L099 + (ML20133L099)
- ML20133L100 + (ML20133L100)
- ML20133L103 + (ML20133L103)
- ML20133L105 + (ML20133L105)
- ML20133L106 + (ML20133L106)
- ML20133L107 + (ML20133L107)
- ML20133L108 + (ML20133L108)
- ML20133L109 + (ML20133L109)
- ML20133L110 + (ML20133L110)
- BSEP-97-0011, Responds to NRC Re Violations Noted in Insp Repts 50-324/96-15 & 50-325/96-15.Corrective Actions:Reactor Power Was Reduced & Feedwater Temperature Compensation Was Corrected + (ML20133L111)
- ML20133L112 + (ML20133L112)
- ML20133L113 + (ML20133L113)
- ML20133L115 + (ML20133L115)
- ML20133L116 + (ML20133L116)
- ML20133L117 + (ML20133L117)
- ML20133L119 + (ML20133L119)
- ML20133L122 + (ML20133L122)
- ML20133L123 + (ML20133L123)
- ML20133L127 + (ML20133L127)
- ML20133L128 + (ML20133L128)
- ML20133L132 + (ML20133L132)
- ML20133L133 + (ML20133L133)
- ML20133L134 + (ML20133L134)
- ML20133L136 + (ML20133L136)
- ML20133L137 + (ML20133L137)
- ML20133L138 + (ML20133L138)
- ML20133L139 + (ML20133L139)
- ML20133L141 + (ML20133L141)