Forwards Revised Preservice Insp Programs for HPCS Sys, Reactor Pressure Vessel,Rhr Sys & Reactor Water Cleanup Sys
ML20133L065
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/07/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20133L068 List:
References
NUDOCS 8508120485
Download: ML20133L065 (1)


Text

_

7 t

1,

'5

+ 5; 4

4 P.O. BOX 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.

- 55 PUBLICSOUARE Serving The Best Location in the Nation i

MURRAY R. EDELMAN VICE PRESIDENT P4UCLEAR August 7, 1985 PY-CEI/NRR-0297 L Mr. B. J. Youngblood, Chief Licensing Bn =~h No. 1 Division of Lictnsing U.S. Nuclear Regalatory Commission Washington, D.C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Preservice Inspection Program

Dear Mr. Youngblood:

This letter and its attachments are provided to update prior submittals regarding the PNPP Preservice Inspection (PSI) Program.

Attached are controlled copies of revised PSI Program Plans for the:

High Pressure Core Spray System, Reactor Pressure Vessel, Residual Heat These new revisions Removal System and the Reactor Water Clean Up System.

are to completely replace the previously submitted PSI Program Plans for these systems.

One copy of these revised PSI Program Plans has also been sent to Mr. Boyd Brown of EG&G 7daho. If you have any questions please call.

Very truly yours, Murray R. Edelman Vice President Nuclear Group MRE:nje

/b Attachments

{

pO cc: Jay Silberg, Esq.

t John Stefano (2) i\\

J. Grobe 8508120485 050807 PDR ADOCK 05000440 0