Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117H092 + (ML20117H092)
- ST-HL-AE-5352, Application for Amends to Licenses NPF-76 & NPF-80,allowing Electrosleeving as Approved SG Tube Repair Method in Lieu of Plugging Tubes + (ML20117H093)
- ML20117H099 + (ML20117H099)
- 1CAN058501, Forwards Response to 850313 Request for Info Re Reactor Coolant Pump Seal Performance at Seven C-E Plants.Seal Performance Data Not Routinely Collected & Tracked + (ML20117H105)
- ML20117H124 + (ML20117H124)
- HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel + (ML20117H127)
- ML20117H133 + (ML20117H133)
- ML20117H139 + (ML20117H139)
- ML20117H143 + (ML20117H143)
- 2CAN059604, Determines That Six Addl Walls for ANO-2 Should Have Been Included in Final Rept Required by 180 Day Response to IE Bulletin 80-11 + (ML20117H145)
- ULNRC-03380, Informs of Implementation of Amend 109 & Amend 110 to License NPF-30 + (ML20117H159)
- NSD-NRC-96-4729, Provides Clarification on Topical Repts Supporting NRC Review of Wgothic Computer Code as Part of AP600 Review + (ML20117H162)
- ML20117H163 + (ML20117H163)
- HL-5175, Responds to Violations Noted in Insp Repts 50-321/96-04 & 50-366/96-04.Corrective Actions:Personnel Counseled Re Inappropiate Actions & Rev History for Procedure 31RS-OPS-001-1S Reviewed + (ML20117H169)
- TXX-4474, Forwards Addition to Page 43 of Rev 4 to Physical Security Plan.Encl Withheld + (ML20117H171)
- ML20117H177 + (ML20117H177)
- NSD-NRC-96-4727, Forwards Three Copies of Westinghouse Response to NRC RAI on AP600 Topics + (ML20117H201)
- ML20117H206 + (ML20117H206)
- 0CAN089607, Semi-Annual Radioactive Effluent Release Rept for First & Second Quarters of 1996 + (ML20117H208)
- ML20117H213 + (ML20117H213)
- ML20117H216 + (ML20117H216)
- ML20117H224 + (ML20117H224)
- ML20117H235 + (ML20117H235)
- 05000373/LER-1996-005-02, :on 960423,missed Tech Spec Surveillance LOS-PP-W1.Caused by Human Performance Error.Issued Directive to Control Room Supervisors Requiring Use of Predefined Detail Report + (ML20117H237)
- ML20117H244 + (ML20117H244)
- ML20117H254 + (ML20117H254)
- 05000352/LER-1996-009-01, :on 960422,main Steam System Safety Relief Valve Setpoint Drift Occurred.Caused by Corrosion Induced Bonding Between Pilot Disc & Seat.Installed Special Modified Pilot Disc in Several SRVs + (ML20117H255)
- ML20117H262 + (ML20117H262)
- RBG-43160, Forwards Proprietary Portions of License Amend Request 96-23 to GE NEDC-32489P.Encl NEDC-32489P Withheld + (ML20117H264)
- A04792, Forwards Response to NRC 850401 Comments on Draft Physical Security Plan.Info Withheld (Ref 10CFR2.790) + (ML20117H269)
- ML20117H279 + (ML20117H279)
- ML20117H281 + (ML20117H281)
- ML20117H287 + (ML20117H287)
- RC-96-0138, Special Rept:On 960425,fire Door DRIB/310 Inoperable for More than 7 Days.Caused by High Energy Electrical Arc When Speed Switch on Operating Pump Opened.New Door Ordered & Fire Barrier Will Be Restored within Week of Door Arrival + (ML20117H290)
- HL-5201, Provides Brief Overview of Util Activities Relative to Performance of Passive ECCS Strainers,Discussion of Evaluation,Scoping Study Results & Planned Compensatory Measures,In Response to NRC Bulletin 96-003 + (ML20117H299)
- ML20117H305 + (ML20117H305)
- 0CAN058504, Submits Updated Response to NUREG-0737 Suppl 1 Re Present Status & Tasks Performed Over Previous 6 Months in Control Room Design Review,Reg Guide 1.97,emergency Operating Procedures & Spds/Emergency Response Facility + (ML20117H306)
- BSEP-96-0129, Forwards Form NIS-2 Owner Rept for Repairs or Replacements, as Required by Provisions of ASME Code Section XI + (ML20117H308)
- ML20117H315 + (ML20117H315)
- RBG-42920, License Amend Request (LAR) 96-29 to License NPF-29, Reflecting Change in Name from Gulf States Utils Co to Entergy Gulf States,Inc + (ML20117H322)
- BSEP-96-0203, Requests License SOP-20542-2 Be Terminated Because Individual Has Changed Job Functions within Company + (ML20117H325)
- ML20117H327 + (ML20117H327)
- ML20117H331 + (ML20117H331)
- ML20117H342 + (ML20117H342)
- ML20117H343 + (ML20117H343)
- ML20117H345 + (ML20117H345)
- ML20117H349 + (ML20117H349)
- ML20117H353 + (ML20117H353)
- ML20117H356 + (ML20117H356)
- ML20117H359 + (ML20117H359)
- 05000266/LER-1996-002, :on 960422,determined That steam-driven AFW Valves Were Shut.Caused by Poor Communication.Crew Discussion Re Valve Misoperation Occurred & Test Procedures Reviewed + (ML20117H361)