MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20210B2521999-07-14014 July 1999 Confirms 990712 Telcon Between J Smith of Licensee Staff & M Shannon of NRC Re semi-annual Mgt Meeting Schedule for 990820 in Atlanta,Ga to Discuss Recent Sequoyah Nuclear Plant Performance ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20209E4071999-06-30030 June 1999 Forwards Insp Repts 50-327/99-03 & 50-328/99-03 on 990328- 0531.Violations Being Treated as Noncited Violations ML20196J8261999-06-28028 June 1999 Forwards Safety Evaluation Authorizing Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements for Certain Inservice Inspections at Sequoyah Nuclear Plant,Units 1 & 2 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195E9311999-05-28028 May 1999 Informs of Planned Insp Activities for Licensee to Have Opportunity to Prepare for Insps & Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20207A5721999-05-20020 May 1999 Forwards Correction to Previously Issued Amend 163 to License DPR-79 Re SR 4.1.1.1.1.d Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20206C0841999-04-23023 April 1999 Forwards Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted ML20206B9591999-04-20020 April 1999 Responds to 990417 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in Unit 1 TS 3.1.2.2,3.1.2.4 & 3.5.2 & Documents 990417 Telephone Conversation When NRC Orally Issued NOED ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) ML20205B1091999-03-19019 March 1999 Submits Response to NRC Questions Concerning Lead Test Assembly Matl History,Per Request ML20204H0161999-03-19019 March 1999 Resubmits Util 990302 Response to Violations Noted in Insp Repts 50-327/98-11 & 50-328/98-11.Corrective Actions:Lessons Learned from Event Have Been Provided to Operating Crews ML20204E8251999-03-0505 March 1999 Forwards Sequoyah Nuclear Plant,Four Yr Simulator Test Rept for Period Ending 990321, in Accordance with Requirements of 10CFR55.45 ML20207E6851999-03-0202 March 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/98-11 & 50-328/98-11.Corrective Actions:Lessons Learned from Event Have Been Provided to Operating Crews ML20207J1171999-01-29029 January 1999 Forwards Copy of Final Exercise Rept for Full Participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to Sequoyah NPP ML20202A7141999-01-20020 January 1999 Provides Request for Relief for Delaying Repair on Section of ASME Code Class 3 Piping within Essential Raw Cooling Water Sys ML20198S7141998-12-29029 December 1998 Forwards Cycle 10 Voltage-Based Repair Criteria 90-Day Rept, Per GL 95-05.Rept Is Submitted IAW License Condition 2.C.(9)(d) 05000327/LER-1998-004, Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval1998-12-21021 December 1998 Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval ML20198D5471998-12-14014 December 1998 Requests That License OP-20313-2 for Je Wright,Be Terminated IAW 10CFR50.74(a).Individual Retiring ML20197J5541998-12-10010 December 1998 Forwards Unit 1 Cycle 9 90-Day ISI Summary Rept IAW IWA-6220 & IWA-6230 of ASME Code,Section Xi.Request for Relief Will Be Submitted to NRC Timeframe to Support Second 10-year Insp Interval,Per 10CFR50.55a 05000327/LER-1998-003, Forwards LER 98-003-00 Re Automatic Reactor Trip with FW Isolation & Auxiliary FW Start as Result of Failure of Vital Inverter & Second Inverter Failure.Event Is Being Reported IAW 10CFR50.73(a)(2)(iv)1998-12-0909 December 1998 Forwards LER 98-003-00 Re Automatic Reactor Trip with FW Isolation & Auxiliary FW Start as Result of Failure of Vital Inverter & Second Inverter Failure.Event Is Being Reported IAW 10CFR50.73(a)(2)(iv) ML20196F9841998-11-25025 November 1998 Provides Changes to Calculated Peak Fuel Cladding Temp, Resulting from Recent Changes to Plant ECCS Evaluation Model ML20195H7891998-11-17017 November 1998 Requests NRC Review & Approval of Five ASME Code Relief Requests Identified in Snp Second ten-year ISI Interval for Units 1 & 2 ML20195E4991998-11-12012 November 1998 Forwards Rev 7 to Physical Security/Contingency Plan.Rev Adds Requirement That Security Personnel Will Assess Search Equipment Alarms & Add Definition of Major Maint.Rev Withheld (Ref 10CFR2.790(d)(1)) 05000328/LER-1998-002, Forwards LER 98-002-00 Re Automatic Turbine & Reactor Trip, Resulting from Failure of Sudden Pressure Relay on 'B' Phase Main Transformer1998-11-10010 November 1998 Forwards LER 98-002-00 Re Automatic Turbine & Reactor Trip, Resulting from Failure of Sudden Pressure Relay on 'B' Phase Main Transformer ML20195G5701998-11-10010 November 1998 Documents Util Basis for 981110 Telcon Request for Discretionary Enforcement for Plant TS 3.8.2.1,Action B,For 120-VAC Vital Instrument Power Board 1-IV.Licensee Determined That Inverter Failed Due to Component Failure ML20155J4031998-11-0505 November 1998 Provides Clarification of Topical Rept Associated with Insertion of Limited Number of Lead Test Assemblies Beginning with Unit 2 Operating Cycle 10 Core ML20154R9581998-10-21021 October 1998 Requests Approval of Encl Request for Relief ISI-3 from ASME Code Requirements Re Integrally Welded Attachments of Supports & Restraints for AFW Piping ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML20154K1581998-10-13013 October 1998 Forwards Rept Re SG Tube Plugging Which Occurred During Unit 1 Cycle 9 Refueling Outage,Per TS 4.4.5.5.a.ISI of Unit 1 SG Was Completed on 980930 ML20154H6191998-10-0808 October 1998 Forwards Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 COLR, IAW TS 6.9.1.14.c 05000328/LER-1998-001, Forwards LER 98-001-00 Providing Details Re Automatic Turbine & Reactor Trip Due to Failure of Sudden Pressure Relay on 'B' Phase Main Transformer1998-09-28028 September 1998 Forwards LER 98-001-00 Providing Details Re Automatic Turbine & Reactor Trip Due to Failure of Sudden Pressure Relay on 'B' Phase Main Transformer ML20151W4901998-09-0303 September 1998 Responds to NRC Re Violations Noted in Insp Repts 50-327/98-07 & 50-328/98-07.Corrective Actions:Revised Per SQ971279PER to Address Hardware Issues of Hysteresis, Pressure Shift & Abnormal Popping Noise 1999-09-27
[Table view] |
Text
.. .
I Tennessee Valley Authority, Post Office Box 2000. Soddy-Daisy. Tennessee 37379-2000 R.J. Adney Site Vce President Sequoyah Nuclear Plant May 22,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk i Washington, D.C. 20555 ,
l Gentlemen: ;
i in the Matter of ) Docket No. 50-327 l Tennessee Valley Authority ) 50-328 !
I SEQUOYAH NUCLEAR PLANT (SON) - NRC INSPECTION REPORT NOS. 50-327, 328/96 REPLY TO NOTICE OF VIOLATION (NOV) 50-327,328/96-02 Enclosed is TVA's reply to Mark S. Lesser's letter to Oliver D. Kingsley, Jr., dated l April 22,1996, which transmitted the subject NOVs. The violations are associated with the failure to follow procedures.
TVA is also concerned with procedural adherence at SQN. As a result of violations ,
noted in NRC Inspection Reports 50-327,328/95-26 and 95-27 and as part of continuing site improvement efforts, a review of several ongoing or recently completed evaluations and assessments was performed. The intent of the review was to identify common issues, associated root causes, and appropriate corrective actions.
The review also included a commen cause assessment of procedure compliance issues that were identified over a six-month period. The prirrary cause for the failure to follow procedures is that established standards had not been effectively and consistently enforced throughout site organizations.
A site-wide stand down was conducted to ensure that the standards which SQN management had developed are fully understood and that site personnel realize that individuals will be held accountable to these standards. Managers and supervisors were informed that they will be held accountable for the work practices of their ORhn n ,
9605280172 960522 PDR 0 ADOCK 05000327 PDR
U.S. Nuclear Regulatory Commission Page 2 May 22, 1996 employees. The expectation that every employee be knowledgeable of and adhere to j the policies established in the SON Work Standards Manual was reinforced.
Management has recently reemphasized accountability through the appropriate i disciplinary actions taken, including removing managers from their positions and instituting a positive reinforcement program that recognizes examples of the proper demonstration of accountability. The violation examples cited in this inspection period occurred during the same timeframe that these actions were being taken. Recent l experience indicates that these actions are beginning to improve procedure adherence j and enforcement of work standards. I will have Nuclear Assurance evaluate the J l
effectiveness of the actions in resolving site human performance issues, Enclosure 1 contains TVA's response to the NOVs. Commitments associated with the submittal are included in enclosure 2.
If you have any questions concerning this submittal, please telephone R. H. Shell at (423)843-7170.
Sincerely,
! $ */ l 4I R. J. Adney g l Enclosures cc (Enclosures):
Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
. -. - ~ .
, ENCLOSURE 1 RESPONSE TO NRC INSPECTION REPORT NOS. 50-327,328/96-02 MARK S. LESSER'S LETTER TO OLIVER D. KINGSLEY, JR.
DATED APRIL 22,1996 VIOLATION 50-327,328/96-02-01
" Technical Specification 6.8.1.a requires, in part, that written procedures shall be established, implemented, and maintained covering the activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Appendix A of Regulatory Guide 1.33 includes procedures for startup, operation, and shutdown of safety-related systems, including the component cooling system.
, " System Operating Instruction (SO) 0-SO-70-1, COMPONENT COOLING WATER SYSTEM "B" TRAIN, Revision 8, provided the steps necessary for operation of "B" train component cooling system, including train shutdown.
" Contrary to the above, on March 20,1996, the licensee failed to provide an approved procedure for operating a "B" train component cooling system return
. isolation valve or failed to implement 0-SO-70-1 to shutdown the "B" train, prior to ,
operating the valve. The failure to establish a procedure or implement an existing '
- procedure caused a component cooling system perturbation which overflowed a
- component cooling system surge tank, resulting in damage to nearby equipment and
- an automatic shutdown of allice condanser glycol chillers.
"This is a Severity Level IV Violation (Supplement I)."
Reason for the Violation The cause of the violation was poor decision making by the Unit Operator, two Assistant Shift Operations Supervisors (ASOS), and the test director. The decision was not to shutdown the B-train component cooling system pump and to proceed with the PMT. The decision to perform the valve stroke with Train B CCS in service placed the CCS system in an alignment which resulted in the CCS surge tank being over-filled. The test director and the licensed operators failed to properly evaluate whether procedural justification existed for the proposed CCS system alignment. The Unit Operator and two ASOSs did not perform a detailed review of the proposed PMT method as provided by the test director.
Corrective Actions That Have Been Taken and the Results Achieved An engineering evaluation of the potential over-pressurization of the CCS surge tank was performed and concluded that the integrity of the CCS surge tank was not challenged during this event. Equipment damaged by the overflow through the relief valve has been repaired and returned to service.
A standing order was issued by the Operations Superintendent to clarify the requirements for control of the system alignrnent during the performance of a PMT.
The personnel involved received the appropriate disciplinary action.
The Corrective Steos Taken to Avoid Future Violations A training letter was prepared and distributed to all licensed operators discussing the observed CCS system response for this event, the design of the CCS surge tank vent and the dry reference leg level indicators, and a review of operator responsibilities associated with the performance of PMT.
The administrative procedure governing PMTs was revised to require the Shift Operations Supervisor or Senior Reactor Operator to ensure that the system configuration necessary to perform the PMT is compatible with approved procedures.
A design issue will be submitted to address the CCS surge tank vent piping arrangement for potential modification of the system.
Date When Full Comoliance Will be Achieved With respect to the examples cited, TVA is in full compliance.
VIOLATION 50-327.328/96-02-05
" Technical Specification 6.8.1.a requires, in part, that written procedures shall be established, implemented, an maintained covering the activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Appendix A of Regulatory Guide 1.33 includes general procedures for control of maintenance, repair, replacement, and modification work.
" Site Standard Practice (SSP) SSP-9.3, PLANT MODIFICATIONS AND DESIGN CHANGE CONTROL, Revision 14, defined the responsibilities and requirements for the development, implementation, and closure of design changes and modifications to systems, components, and structures at Sequoyah Nuclear Plant. Section 5.3.2 of SSP-9.3 stated that field engineers will remain on clearances until equipment can be returned to service unconditionally (i.e. procedure reviews, primary drawing updates, return to operation (RTO), etc.), except as noted in section 5.4.3. Section 5.4.3 of SSP-9.3 allowed for lifting of the hold order for performance of post maintenance testing (PMT) that required the component or system to be in service. ~lf after performance of the PMT, the equipment cannot be returned to service unconditionally (drawings and procedures updated, RTO walkdowns performed, etc.), the cognizant engineer shall insure operations issues a clearance to indicate that an open issue exist.
I
l c ..
" Contrary to the above, on or before March 18,1996, the licensee failed to follow the requirements of SSP-9.3 in that clearance control for several modifications in the plant was inadequate. Modifications without required clearance controlincluded: Unit 1 l cold leg accumulator sample system modification, steam generator blowdown l radiation monitor 1-RE-90-124 modification, and Unit 1 boric acid blender sample ,
system modification. I "This is a Severity Level IV Violation (Supplement 1)."
l Reason for the Violation l l
A review of modification activities and the modification / clearance interface identified that plant personnel have developed workarounds of these plant processes in order to complete work.
Corrective Actions That Have Been Taken and the Results Achieved Hold orders were established as appropriate for equipment that had not been properly returned to service.
The personnel involved received the appropriate disciplinary action.
Stand downs were held with Modifications' foremen and engineers, component engineers and Nuclear Engineering supervisors to discuss the issues identified and to reinforce management expectations relative to the clearance and modification programs.
- Each department manager reviewed his area of responsibility through in-plant walk-downs to ensure that hold orders, caution orders, or other protection notices were established where required by site procedures.
The Corrective Stoos Taken to Avoid Future Violations The clearance and modification processes have been revised to preclude the use of workarounds and to require the use of proper protection notices for plant equipment under physical modification. These revisions require that primary drawings and system operating instructions be issued prior to release of the equipment to perform the postmodification testing.
< Date When Full Corroliance Will be Achieved With respect to the examples cited, TVA is in full compliance.
4 1
l l . i l
l l
VIOLATION 50-327.328/96-02-07
" Technical Specification Section 6.8.1.f requires that written procedures shall be established, implemented and maintained covering the fire protection program implementation. The quality assurance (QA) program for fire protection is included in TVA-NOA-PL89-A, NUCLEAR QUALITY ASSURANCE PLAN.
"QA plan TVA-NOA-PLN89-A, Section 9.6, stated that measures shall be established such that items, including consumables, under the scope of the QA program are handled, stored, and shipped by qualified individuals in a manner to prevent deterioration, contamination, damage, or loss of identification in accordance with approved engineering and procurement documents.
"SbP 10.3, HANDLING AND STORAGE OF MATERIALS AND SPARE PARTS, Revision 5, Section 3.2.2.B, stated that site engineering / procurement engineering shall establish storage / preventive maintenance requirements and provide appropriate engineering output documents delineating the requirements.
" Contrary to the above, on February 29,1996, SSP-10.3 was not implemented in that storage and preventive maintenance requirements had not been established for the long term storage of the pumps, motor, diesel engine, pump controllers and related components associated with the new fire protection water supply modification project.
"This is a Severity Level IV Violation (Supplement I)."
Reason for the Violation The Procurement Engineering group personnel failed to properly follow through on resolution of the storage requirements. When the pump skid arrived onsite, the installation schedule had been revised, and interim storage was required. The procurement package for the pumps defined the storage requirement as Level B; however, there were no available Level B storage areas that could accommodate the equipment skid. The decision was made to temporarily store the pump skid in Level C storage (same as Level B except that heat and temperature control are not required).
The Level C storage was intended to be temporary, but the documentation that revised the storage requirements did not identify any limitations.
The warehouse that was used to store the equipment skid suffered damage during a severe winter storm, exposing the skid to extreme temperatures. The damage to the storage building was not promptly repaired.
Corrective Actions That Have Been Taken and the Results Achieved The storm damage to the storage building was repaired. The equipment skid was moved to a Level B storage area. A vendor representative examined the equipment and identified some minor freeze damage. The damage included cracked solder joints, a cracked joint at a check-valve, and a cracked check-valve. No damage to the
- - .. i electronics, motor, or the diesel engine was identified. The minor freeze problems will be corrected during the installation of the skid. Preventive maintenance requirements were developed and implemented to ensure that the pump is properly maintained in storage.
The appropriate Procurement Engineering group personnel were counseled regarding the importance and ownership of properly identifying storage requirements for material ;
and follow through on the resolution of problems. The appropriate warehouse l personnel were counseled regarding the need to address storage facility damage 1 through the corrective action process and escalate repair delays to management for resolution.
As part of the extent of condition review for this problem, a 100 percent walkdown of the warehouses was completed to determine if any other equipment was in storage i that required preventive maintenance. This walkdown identified two motors that were '
not in the preventive maintenance program. Those motors were added to the preventive maintenance program.
The Corrective Steos That Will be Taken to Avoid Future Violations
]
The corrective actions to prevent future violations are complete as stated above. l l
l Date When Full Compliance Will be Achieved With respect to the examples cited, TVA is in full compliance. ,
l
- c. .
ENCLOSURE 2 COMMITMENT FOR RESPONSE TO NRC INSPECTION REPORT j NOS. 50-327,328/96-02 MARK S. LESSER'S LETTER TO OLIVER D. KINGSLEY, JR. :
DATED APRIL 22,1996 i j
- 1. Nuclear Assurance will evaluate the effectiveness of the actions in resolving site ,
human performance issues. This action will be completed by October 31,1996. !
- 2. A design issue will be submitted to address the CCS surge tank vent piping ,
arrangement for potential modification of the system. This action will be completed by June 28,1996.
)
i i