ML20117H345
| ML20117H345 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/21/1996 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20117H348 | List: |
| References | |
| NUDOCS 9605280167 | |
| Download: ML20117H345 (3) | |
Text
.
j
~
En IeMasee Vancy Aut*v'rity Post Othcc Box 2000 Soddy-Da.sv. Terr.essee 37373 May 21,1996 1
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SON) - UNIT 2 CORE OPERATING LIMITS REPORT (COLR)
In accordance with the SON Unit 2 Technical Specification 6.9.1,.14.c, enclosed is the Unit 2 Cycle 8 COLR.
There are no commitments contained in this submittal. Please direct questions concerning this issue to W. C. Ludwig at (423) 843-7460.
Sincerely, kk. -
R. H. Shell Manager SON Site Licensing Enclosure cc: See page 2 f
h o
9605280167 960521 J
PDR ADOCK 05000328
.j g
p PDR
U.S. Nuclear Regulatory Commission Page 2 May 21,1996 cc (Enclosure):
Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 i
,4a Sb 4(4emtu
@M+
=
4
- P
=>4&
1 i
)
ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 8 CORE OPERATING LIMITS REPORT REVISION O (L36 960429 800) i