Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000335/LER-1996-010, :on 960730,upper & Lower Detector Leads for Linear Range Ni Were Reversed on Channels A,C & D.Mod Package for Replacement of RPS Ni Drawers Contained Design Error.Drawers Have Been Reconnected & Retested + (ML20117G788)
- ML20117G789 + (ML20117G789)
- ML20117G790 + (ML20117G790)
- ML20117G800 + (ML20117G800)
- ML20117G805 + (ML20117G805)
- ML20117G810 + (ML20117G810)
- 05000271/LER-1996-011, :on 960416,check Valves Not Included in IST Program.Caused by Failure to Perform Comprehensive Sys/ Component Reviews During Past IST Program Scope Reviews. Reviewed IST Program & Prepared Basis Document + (ML20117G813)
- ML20117G818 + (ML20117G818)
- ML20117G822 + (ML20117G822)
- ML20117G832 + (ML20117G832)
- ML20117G846 + (ML20117G846)
- ML20117G856 + (ML20117G856)
- ML20117G861 + (ML20117G861)
- ML20117G868 + (ML20117G868)
- ML20117G881 + (ML20117G881)
- 05000341/LER-1996-007, :on 960419,RCIC Sys Declared Inoperable Due to Turbine Shaft Gland Leakage.Caused by Steam Leakage Past Seat of RCIC Turbine Steam Admission Valve + (ML20117G886)
- 05000277/LER-1996-004-01, :on 960417,HPCI Sys Declared Inoperable Due to Leak in Cooling Water Relief Valve.Caused by Igscc.Hpci Cooling Water Relief Valve Was Replaced.W/Undated Ltr + (ML20117G892)
- 05000328/LER-1996-001-05, :on 960418,inadvertent ESF Actuation & Loss of Power Signal & Load Sequencing Occurred During Maint. Caused by Personnel Error.Individual Involved in Event Was Counseled & Lessons Were Discussed + (ML20117G922)
- 05000321/LER-1996-006, :on 960421,withdrawal of Inoperable Control Rod Occurred.Caused by Inadequate Procedure & Lack of Work Coordination.Procedure 3460-OPS-066-05 Revised & TSs Associated W/Event Explained + (ML20117G935)
- 05000461/LER-1996-005, :on 960411,failure to Follow Procedures During Completion of one-rod-out Interlock Test Results in Reactor Mode Switch Not Locked in Refuel During Control Rod Exercising as Required by TS + (ML20117G939)
- ML20117G949 + (ML20117G949)
- ML20117G965 + (ML20117G965)
- RBG-20933, Forwards Amend 19 to FSAR for River Bend Station.Amend Provides Response to Various Open & Confirmatory Items of SER (NUREG-0989) + (ML20117G970)
- JAFP-96-0343, Informs That New York Power Authority Has Completed Review of Plant Heavy Load Program to Ensure Compliance W/Clb & Regulatory Guidelines.Results Confirm That Heavy Load Movements Will Continue to Be Performed within CLB + (ML20117G986)
- NSD-NRC-96-4809, Forwards WCAP-14701, Methodology & Results of Defining Evaluation Issues for AP600 Human System Interface Design Test Program + (ML20117G993)
- ML20117H018 + (ML20117H018)
- 05000306/LER-1996-002-02, :on 960418,reactor Trip Occurred.Caused by Failure of 122 Air Dryer Purge Exhaust to Close.Valves Were Inspected + (ML20117H020)
- 05000293/LER-1996-002, :on 960205,loss of Valve Position Indication for MO-1301-16 Occurred.Caused by Loose Control Power Fuse in Breaker B1864.Investigation & Troubleshooting Plan Was Implemented + (ML20117H022)
- RBG-20773, Responds to NRC Re Deficiencies & Open Items Noted in Insp Rept 50-458/85-03.Corrective Actions: Notification Procedure Revised & Main Control Room Modified to Provide Addl Space & Orientation for Communicator + (ML20117H025)
- 05000346/LER-1996-004, :on 960417,PCAQR 96-0512 Document Failure to Initiate Required Compensatory Actions for Thermo-Lag for Radiant Energy Shields.Caused by Personnel Error.Util Plans to Replace Thermo-Lag + (ML20117H033)
- ML20117H034 + (ML20117H034)
- ML20117H045 + (ML20117H045)
- ML20117H054 + (ML20117H054)
- ML20117H064 + (ML20117H064)
- ML20117H066 + (ML20117H066)
- 05000321/LER-1996-007, :on 960424,failed Component Results in Inadvertent EDG Start.Caused by Relay Momentarily Binding in Actuated Position.Relay Replaced & Surveillance Completed + (ML20117H067)
- ML20117H081 + (ML20117H081)
- ML20117H092 + (ML20117H092)
- ST-HL-AE-5352, Application for Amends to Licenses NPF-76 & NPF-80,allowing Electrosleeving as Approved SG Tube Repair Method in Lieu of Plugging Tubes + (ML20117H093)
- ML20117H099 + (ML20117H099)
- 1CAN058501, Forwards Response to 850313 Request for Info Re Reactor Coolant Pump Seal Performance at Seven C-E Plants.Seal Performance Data Not Routinely Collected & Tracked + (ML20117H105)
- ML20117H124 + (ML20117H124)
- HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel + (ML20117H127)
- ML20117H133 + (ML20117H133)
- ML20117H139 + (ML20117H139)
- ML20117H143 + (ML20117H143)
- 2CAN059604, Determines That Six Addl Walls for ANO-2 Should Have Been Included in Final Rept Required by 180 Day Response to IE Bulletin 80-11 + (ML20117H145)
- ULNRC-03380, Informs of Implementation of Amend 109 & Amend 110 to License NPF-30 + (ML20117H159)
- NSD-NRC-96-4729, Provides Clarification on Topical Repts Supporting NRC Review of Wgothic Computer Code as Part of AP600 Review + (ML20117H162)
- ML20117H163 + (ML20117H163)
- HL-5175, Responds to Violations Noted in Insp Repts 50-321/96-04 & 50-366/96-04.Corrective Actions:Personnel Counseled Re Inappropiate Actions & Rev History for Procedure 31RS-OPS-001-1S Reviewed + (ML20117H169)