Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101F807 + (ML20101F807)
- ML20101F815 + (ML20101F815)
- ML20101F816 + (ML20101F816)
- ML20101F824 + (ML20101F824)
- ML20101F825 + (ML20101F825)
- ML20101F827 + (ML20101F827)
- JPN-96-009, Forwards Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability + (ML20101F828)
- ML20101F831 + (ML20101F831)
- ML20101F832 + (ML20101F832)
- AECM-84-0531, Requests Extension of Environ Qualification Deadline for Seven Categories of safety-related Electrical Components Until 851130.Supporting Info & Justifications for Continued Operation Encl + (ML20101F833)
- ML20101F835 + (ML20101F835)
- 0CAN128404, Forwards Endorsements 11-15,17-21 & 47-52 to Nelia Policy NF-210,Endorsements 41-44 to Maelu Policy MF-74 & Amend 2 to Indemnity Agreement B-65.Future Mail Should Be Addressed to Jm Griffin,Senior Vice President + (ML20101F837)
- ML20101F840 + (ML20101F840)
- ML20101F841 + (ML20101F841)
- 05000327/LER-1992-007, :on 920316,identified That Several Ice Condenser Inlet Doors on Unit 2 Were Inhibited from Opening. Caused by Failure to Install Sealant Matl in Wear Slab Joints.Unit 1 Shutdown Initiated + (ML20101F845)
- ML20101F851 + (ML20101F851)
- ML20101F856 + (ML20101F856)
- ML20101F867 + (ML20101F867)
- 05000267/LER-1992-004, :on 920520,FHM Was Moved While Louvers Were Open.Caused by Failure to Follow Procedures.Louvers Were Closed & Personnel Reminded of Necessity to Follow Procedures + (ML20101F876)
- ML20101F882 + (ML20101F882)
- ML20101F886 + (ML20101F886)
- ML20101F887 + (ML20101F887)
- 05000395/LER-1992-003, :on 920520,reactor Trip Occurred During Repair of Nuclear Instrumentation Due to Personnel Error.Personnel Completed Repair Activity Which Initiated Trip & Verified Operability of NI-42 Before Plant Restart + (ML20101F888)
- ML20101F889 + (ML20101F889)
- 3F0692-13, Provides Justification Re Request for Temporary Waiver of Compliance for TS 3.9.4 to Allow Administrative Controls to Be Utilized for Station Air Valves & Temporary Connection Air Valves + (ML20101F907)
- ML20101F910 + (ML20101F910)
- AECM-84-0541, Forwards Grand Gulf Nuclear Station Unit 1,50% Power Operational Readiness Review. Addl Independent Operational Readiness Review Will Be Conducted within 30 Days Following Completion of 100 H Warranty Run + (ML20101F933)
- ML20101F939 + (ML20101F939)
- ML20101F945 + (ML20101F945)
- ML20101F946 + (ML20101F946)
- ML20101F952 + (ML20101F952)
- ML20101F956 + (ML20101F956)
- ML20101F960 + (ML20101F960)
- ML20101F961 + (ML20101F961)
- ML20101F962 + (ML20101F962)
- ML20101F964 + (ML20101F964)
- ML20101F966 + (ML20101F966)
- ML20101F969 + (ML20101F969)
- ML20101F972 + (ML20101F972)
- ML20101F976 + (ML20101F976)
- ML20101F977 + (ML20101F977)
- ML20101F980 + (ML20101F980)
- ML20101F981 + (ML20101F981)
- ML20101F987 + (ML20101F987)
- ML20101F988 + (ML20101F988)
- 05000338/LER-1984-020-01, :on 841118,reactor Trip Occurred.Caused by Performing Overspeed Protection Controller Test Outside Normally Prescribed Procedure Sequence.No Repairs or Replacements Required Prior to Restart + (ML20101G003)
- ML20101G006 + (ML20101G006)
- ML20101G008 + (ML20101G008)
- ML20101G014 + (ML20101G014)
- ML20101G016 + (ML20101G016)
- ML20101G020 + (ML20101G020)