Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093N677 + (ML20093N677)
- ML20093N686 + (ML20093N686)
- ML20093N690 + (ML20093N690)
- ML20093N692 + (ML20093N692)
- ML20093N697 + (ML20093N697)
- ML20093N698 + (ML20093N698)
- BSEP-95-0560, Forwards Rev 22 to Industrial Security Plan for Brunswick Steam Electric Plant Units 1 & 2.Plan Withheld + (ML20093N699)
- ML20093N705 + (ML20093N705)
- 05000249/LER-1984-015-06, :on 840925,during Planned Unit Shutdown,Reactor Scrammed on Low Condenser Vacuum Caused by Air in-leakage Through Damaged Bellows on Seal Steam Relief Valve Discharge Line.Bellows Replaced + (ML20093N715)
- RBG-19191, Interim Deficiency Rept DR-210 Re Circuit Board Retaining Parts in Two Model 510 Du Rosemount Card Files.Next Rept Will Be Provided by 841211 + (ML20093N719)
- TXX-4327, Amended Response to Significant Deficiency Rept SDAR-142 Submitted on 840928 Re Unqualified Limitorque Electric Motors.Correct Ref for Block Is CP-84-18 + (ML20093N721)
- ML20093N722 + (ML20093N722)
- 3F1095-09, Clarifies Commitment for Use of self-contained Breathing Apparatus by Crystal River Unit 3 Control Room Operators During Event Involving Toxic Gas + (ML20093N725)
- ML20093N727 + (ML20093N727)
- ML20093N737 + (ML20093N737)
- ST-HL-AE-5219, Provides Addl Info & Clarification Re South Tx Projects Response on 950627 to GL 95-03 + (ML20093N739)
- ML20093N745 + (ML20093N745)
- ML20093N746 + (ML20093N746)
- ML20093N751 + (ML20093N751)
- ML20093N759 + (ML20093N759)
- ML20093N766 + (ML20093N766)
- ML20093N768 + (ML20093N768)
- ML20093N772 + (ML20093N772)
- ML20093N783 + (ML20093N783)
- 05000316/LER-1984-023, :on 840829,fire Damper 2-HV-ACED-2 Inoperable During Manual Actuation of Low Pressure CO2 Fire Suppression Sys.Caused by pop-off Latch Caught on Protective Screen, Preventing Complete Closure of Damper + (ML20093N784)
- ML20093N785 + (ML20093N785)
- ML20093N788 + (ML20093N788)
- ML20093N790 + (ML20093N790)
- RBG-19190, Interim Deficiency Rept DR-167 Re Control Panel Wiring for HPCS Diesel Generator Supplied by Ge.Next Rept Will Be Provided by 841127 + (ML20093N792)
- 05000315/LER-1984-020, :on 840822,control Room Cable Vault Supply Fan Damper Found Blocked Open W/Obstructed Conduit.Caused by Personnel Using Conduit to Hold Dampers Open.Administrative Policy Changes Established + (ML20093N793)
- ML20093N795 + (ML20093N795)
- ML20093N807 + (ML20093N807)
- 05000327/LER-1995-012, :on 950923,determined That SRs Associated W/ Analog Channel Inputs to Ssps May Not Have Been Performed as Required by TS Because of Inadequate Performance Guidance. Procedure Established to Ensure That Stated Tests Performed + (ML20093N815)
- ML20093N816 + (ML20093N816)
- ML20093N828 + (ML20093N828)
- ML20093N829 + (ML20093N829)
- ML20093N831 + (ML20093N831)
- 05000336/LER-1995-036, :on 950922,identified That Quarterly Surveillance for Valve 2-SW-1A Missed Due to Personnel Error.Valve 2-SW-1A Tested & Verified Operable & IST Program Surveillances Reviewed + (ML20093N835)
- ML20093N837 + (ML20093N837)
- ML20093N842 + (ML20093N842)
- ML20093N844 + (ML20093N844)
- 05000336/LER-1995-037, :on 950923,determined That CEA TS SR Not Performed as Required on Previous Two Shifts Due to Lack of Debriefing,Communication Problems & TS Interpretation.Aop 2556, CEA Malfunctions Will Be Revised + (ML20093N847)
- ML20093N848 + (ML20093N848)
- ML20093N853 + (ML20093N853)
- ML20093N857 + (ML20093N857)
- ML20093N860 + (ML20093N860)
- ML20093N865 + (ML20093N865)
- ML20093N867 + (ML20093N867)
- ML20093N872 + (ML20093N872)
- ML20093N874 + (ML20093N874)
- ML20093N878 + (ML20093N878)