Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093D878 + (ML20093D878)
- ML20093D885 + (ML20093D885)
- B11264, Forwards Response to Mechanical Engineering Branch Draft SER Open Item MEB-25 Re Testing Requirements for RCS Relief & Safety Valves.Items Considered Confirmatory + (ML20093D889)
- ML20093D903 + (ML20093D903)
- NLS8400122, Forwards Controlled Copy 126 of Tech Specs.Copies of Revised Pages Will Be Submitted as Amends Approved.W/O Encl + (ML20093D906)
- ML20093D912 + (ML20093D912)
- 05000317/LER-1984-010, :on 840829,quarterly Surveillance Testing of 125 Volt Dc Batteries Found Not Performed.Batteries Declared Inoperable.Caused by Personnel Error.Test Scheduling Sys Being Developed + (ML20093D913)
- ML20093D916 + (ML20093D916)
- ML20093D918 + (ML20093D918)
- 05000317/LER-1984-011, :on 840830,surveillance Test Procedure on Diesel Generators 11 & 12 Not Performed Per Tech Spec Requirements.Caused by Personnel Error.Test Procedure Will Be Revised to Clarify Required Testing + (ML20093D925)
- ML20093D926 + (ML20093D926)
- ML20093D928 + (ML20093D928)
- 0CAN068406, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/84-12 & 50-368/84-12.Corrective Actions: Combustibles (chem-wipe Toweling) Removed & Daily Insp of Areas Outside of Controlled Access Instituted + (ML20093D929)
- ML20093D931 + (ML20093D931)
- ML20093D936 + (ML20093D936)
- ML20093D941 + (ML20093D941)
- ML20093D955 + (ML20093D955)
- ML20093D960 + (ML20093D960)
- ML20093D961 + (ML20093D961)
- ML20093D964 + (ML20093D964)
- ML20093D967 + (ML20093D967)
- ML20093D969 + (ML20093D969)
- ML20093D972 + (ML20093D972)
- ML20093D982 + (ML20093D982)
- ML20093D989 + (ML20093D989)
- ML20093D992 + (ML20093D992)
- ML20093D993 + (ML20093D993)
- ML20093D997 + (ML20093D997)
- ML20093E018 + (ML20093E018)
- 05000271/LER-1984-008, :During 840612-17,air Particulate & Charcoal Cartridge Sampling Not Performed as Required by Tech Spec. Caused by Technician Leaving Off Air Sampling Station. Procedures Revised & Technicians Instructed + (ML20093E019)
- PMNS20200217, Notice of Meeting with Southern Nuclear Operating Company + (ML20093E024)
- TXX-4177, Discusses 840522 Conversation Between D Hunnicutt & D Chapman Re Request for Extension to 840523 Deadline for Responding to Concerning Welding Practices. Extension Granted to 840608 + (ML20093E025)
- ML20093E028 + (ML20093E028)
- ML20093E029 + (ML20093E029)
- ML20093E032 + (ML20093E032)
- ML20093E037 + (ML20093E037)
- ML20093E040 + (ML20093E040)
- ML20093E042 + (ML20093E042)
- ML20093E059 + (ML20093E059)
- ML20093E060 + (ML20093E060)
- ML20093E066 + (ML20093E066)
- ML20093E069 + (ML20093E069)
- ML20093E076 + (ML20093E076)
- ML20093E078 + (ML20093E078)
- ML20093E084 + (ML20093E084)
- ML20093E094 + (ML20093E094)
- ML20093E100 + (ML20093E100)
- ML20093E104 + (ML20093E104)
- ML20093E106 + (ML20093E106)
- ML20093E107 + (ML20093E107)
- ML20093E108 + (ML20093E108)