Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000498/LER-1995-001, :on 950124,experienced Reactor Trip Due to low- Low SG Level on 1C SG After Loss of MFW Pump 13.Caused by Failed Thrust Bearing Wear Probe Assembly.Thrust Bearing Wear Probe Assembly on MFW Pump 13 Replaced + (ML20080L256)
- RC-95-0042, Submits Four Controlled Copies of Amend 34 to Physical Security Plan.Encl Withheld + (ML20080L258)
- ML20080L261 + (ML20080L261)
- ML20080L273 + (ML20080L273)
- ML20080L274 + (ML20080L274)
- 05000368/LER-1983-039-03, /03L-0:on 830825,leak Found in Weld of Pressure Sensing Line for Middle Seal of Reactor Coolant Pump.Caused by Weld Crack Due to Vibration.Line W/Cracked Weld Replaced. Mod Planned + (ML20080L275)
- 05000361/LER-1983-118-03, /03L-0:on 830911,containment Isolation Valve 2HCV-9945 Found Locked Open.Caused by Valve Incorrectly Positioned on 830906.Isolation Valve Returned to Proper Position.Appropriate Disciplinary Action Taken + (ML20080L277)
- ML20080L285 + (ML20080L285)
- 05000327/LER-1983-112-01, /01T-0:on 830911,both Trains of Actuation Logic for Reactor Trip Made Inoperable When Reactor Trip Breaker Undervoltage Coils Jumpered Out.Caused by Procedural Error. Procedure Revised + (ML20080L286)
- ML20080L291 + (ML20080L291)
- ML20080L293 + (ML20080L293)
- ML20080L297 + (ML20080L297)
- ML20080L299 + (ML20080L299)
- 05000282/LER-1995-001-01, :on 950125,determined That Safeguards Traveling Screen Declared Inoperable on 950121 Due to Personnel Error Reportable.Standing Instrument Calibr Procedures Will Be Reviewed + (ML20080L305)
- ML20080L311 + (ML20080L311)
- ML20080L319 + (ML20080L319)
- ML20080L323 + (ML20080L323)
- RBG-15-986, Final Deficiency Rept DR-114 Re Welds in Radial Rebar Anchor Ring for Shield Bldg Roof.Condition Not Reportable Per 10CFR50.55(e) + (ML20080L326)
- ML20080L329 + (ML20080L329)
- ML20080L334 + (ML20080L334)
- ML20080L336 + (ML20080L336)
- ML20080L340 + (ML20080L340)
- RBG-16-986, Forwards Response to Geosciences Branch Question 231.15 Re 41 Unidentified Seismic Reflection Profile Lines within 5 Miles of Site.Response Clarifies Info Submitted on 840120 & Will Be Incorporated Into FSAR + (ML20080L345)
- ML20080L348 + (ML20080L348)
- ML20080L351 + (ML20080L351)
- ML20080L359 + (ML20080L359)
- ML20080L367 + (ML20080L367)
- ML20080L373 + (ML20080L373)
- ML20080L383 + (ML20080L383)
- ML20080L384 + (ML20080L384)
- ML20080L386 + (ML20080L386)
- 05000255/LER-1983-061-03, /03L-0:on 830910,11 & 16,several Hourly Fire Tours in safety-related Areas Not Completed within Required Period.Caused by Personnel Error.Fire Tours Reestablished + (ML20080L389)
- ML20080L394 + (ML20080L394)
- 05000346/LER-1981-077-03, During Surveillance Test ST5016.11 Numerous Conduit Pull Boxes Discovered W/Unsealed Fire Resistant Matl.Fire Watch Stationed + (ML20080L398)
- ML20080L403 + (ML20080L403)
- ML20080L405 + (ML20080L405)
- A09849, Discusses Review of RI-91-A-0230 Re Activities at Millstone Unit 2 + (ML20080L411)
- W3P84-0318, Forwards Relief Requests Resulting from Preservice Insp Program Hanger/Hanger Support Visual Exams,Per Sser 5 Section 5.2.4 & Signed NIS-1 Form for Eddy Current Test Rept + (ML20080L413)
- ML20080L420 + (ML20080L420)
- 05000362/LER-1983-059-03, /03L-0:on 830824,w/unit in Mode 3,following Performance of Radiation Monitoring Shiftly Surveillance, Main Steam Line Radiation Monitor 3RI-7874-B1 Declared Inoperable.Caused by Loosened Pin + (ML20080L434)
- ML20080L436 + (ML20080L436)
- ML20080L452 + (ML20080L452)
- NRC-95-0024, Forwards Plant Physical Security Plan,Rev 25.Encl Withheld + (ML20080L453)
- A10020, Discusses Review of RI-91-A-231 Re Activities at Millstone Unit 2 + (ML20080L459)
- ML20080L460 + (ML20080L460)
- ML20080L462 + (ML20080L462)
- 05000373/LER-1983-104-03, /03L-0:on 830827,during LOS-RH-Q1,RHR 1C Pump Min Flow Bypass Valve 1E12-F064C Failed to auto-open When Flow Decreased Less than 1,000 Gpm.Cause Not Determined.Pressure Switch Found to Have Conservative Setpoint + (ML20080L466)
- AECM-83-0600, Updated RO 83-067/1:on 830819,accelerographs Used for Seismic Monitoring Discovered Damaged Due to over-ranging. Instrument on HPCS Spray Line Replaced 830713.LPCS Spray Line Instrument Replaced 830713 + (ML20080L471)
- ML20080L473 + (ML20080L473)
- GO2-83-858, Final Deficiency Rept,Condition 258 Re Failure to Comply W/Ge Specs for Installation of RHR Hx.Initially Reported on 830609.Deficiencies Corrected.Final Review Practices Developed by Completion Contractor + (ML20080L478)
- 05000373/LER-1983-103-03, /03L-0:on 830823,following Completion of LIS-RD-02,27,accumulator Low Pressure Switches & Three Pressure Indicators Found to Exceed Tech Spec Limits.Caused by Instrument Drift.Instrument Calibr + (ML20080L486)