RO 83-067,Rev 1:from 830802-28 Fire Doors Found Inoperable During Routine Surveillances.Fire Protection Procedures Revised
ML20080L403
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/21/1983
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
RO-83-067-R01, RO-83-67-R1, NUDOCS 8309300298
Download: ML20080L403 (6)


Text

'

A 5 m'.a im Southern California Edison Company 53 S AN ONOFRE NUCLE AR QENER A TI GS I

F6.

p.O. B O x 0 2 4 S A N C LEMEN TE. C A LIF ORNt A 94672 H. 8. R A Y 1

vrtrewoNt 57 AflON M AN AGE A file) 492 7 FOO September 21, 1983 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. J.

B.

Martin, Regional Administrator

Dear Sir:

Subject:

Docket Nos. 50-361 and 50-362 30-Day Report, Inoperable Fire Doors San Onofre Nuclear Generating Station, Units 2 and 3

References:

1. Licensee Event Report 83-067, Revision 1 (Docket No. 50-361), dated September 6, 1983
2. Special Report, Docket No. 50-361, H. B. Ray (SCE) to R. H. Engelken (NRC),

dated March 29, 1982 In accordance with our commitments in Reference (1), this letter represents the 30-day written report, pursuant to Technical Specification 6.9.1.13.b, for fire-rated assemblies (specifically fire doors) found inoperable during routine surveillances.

Due to the large number of fire doors found inoperable during routine i

daily, weekly, and monthly surveillances of fire doors, we believe grouping of all such reportable occurrences into a monthly summary report, rather than multiple reports during the month, is appropriate.

This approach was previously utilized in the case of multiple reports required for inoperable fire-rated assemblies l

(specifically fire barrier penetrations) for which monthly summary reports were submitted beginning with Reference (2).

Our conclusion that monthly summary reporting is appropriate is supported by 10 CFR 50.73 which, when effective, will eliminate the requirement for such reports.

l l

Fire doors found inopetable during routine surveillance can be grouped into three categories:

latching mechanism failures; closure mechanism failures; and doors blocked open typically for construction, startup or maintenance activities.

8309300298 830921 PDR ADOCK 05000361 S

PDR

'7 7k

Mr. J. B. Martin September 21, 1983 Each of the above deficiencies renders the fire docr inoperable.

As these deficiencies are identified, compensatory fire watches, pursuant to Technical Specification 3.7.9 Action Statement

'a',

are initiated.

We have completed a review (limited to fire doors now inoperable) and verified that there are no inoperable fire doors for which compensatory measures have not been implemented.

flowever, exanination of prior surveillance records has not been undertaken since it would not contribute to the identification or implementation of required corrective actions.

As corrective action, we have revised the Fire Protection and Maintenance Surveillance procedures and checklists to ensure that proper compensatory measures are initiated for any fire protection equipment found inoperable during routine surveillances and that surveillance results are promptly evaluated for reportability.

In addition, we have conducted special training of personnel responsible for the surveillances to assure understanding of surveillance and Technical Specification requirements.

We are reviewing methods of preventing closure mechanism and latching mechanism failures and will report the proposed corrective action in the next report.

Results of fire door surveillances conducted during August 1983 are presented in the attached.

Results of such surveillances conducted during September 1983 will be reported by October 18, 1983.

If you require any additional information, please so advise.

Sincerely, tuf o

l Attachment

!!r. J.B. !!ar tin September 21, 1983 cc:

A.E. Chaffee (USNRC Resident Inspector, Units 2 and 3)

J.P.

Stewart (USNRC Resident Inspector, Units 2 and 3) i U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Division of Technical Information and Document Control Institute of Nuclear Power Operations (INPO) 1422u

r ATTACl!ME!!T SOUTl!ER!! CALIFOR!!! A EDISO!i COMPA!!Y I!10PERABLE FIRE DOORS FOR T!!E MOliTH OF AUGUST 1983 SAli O!!OFRE fiUCLEAR GEllERATI!!G STATIO!i Uti! T S !!O. 2 AllD 3, DOCKET !!OS. 50-361 A!!D 50-362 I.

Latching Mechanism Failures 11unber of doors failing - 14, as follows:

Door !!o.

Inoperable Operable AR-104 08/16 08/30 AC-106 08/02 08/04 08/17 Work Pending AC-118 08/15 08/17 AC-127 08/01 08/03 08/06 08/15 08/20 Work Pending AC-131 08/10 Work Pending AC-225 08/19 08/26 08/28 Work Pending AC-236 08/11 08/12 08/14 08/15 AC-239 08/02 08/03 AC-301 08/02 08/05 08/06 08/13 C3-301 08/01 08/02 AC-303 08/19 08/23 08/28 Work Pending C3-401 08/02 08/05 08/06 08/27 C2-403 08/05 08/07 C2-405 08/17 08/23 l

l

ATTACHMENT SOUTHER!I CALIFOR!!I A EDISOli COMPA!!Y INOPERABLE FIRE DOORS FOR THE MOliTl! OF AUGUST 1983 SAtl O!!OFRE liUCLEAR GE!;ERATING STATIO!!

U!IITS !!O. 2 A!!D 3, DOCKET 110S. 50-361 A!!D 50-362 (Continued)

II.

Closure Mechanism Failures

!1 umber of doors failing - 16, as follows:

Door tio.

Inoperable Operable AR-101 08/02 08/03 08/25 Work Pending Fi!3-103 08/11 08/13 08/14 08/17 FH3-207 08/04 08/05 08/06 08/09 m

08/11 08/12 08/14 08/16 AC-223 08/17 08/19 Fl!3-302 08/12 Work Pending AC-303 08/04 08/05 08/06 08/13 08/15 08/17 Fil2-3 0 3 08/02 08/04 08/05 Work Pending AC-305 08/01 08/09 08/11 08/17 08/19 08/29 AC-310 08/10 08/12 08/22 08/30 AR-316 08/26 Work Pending AR-318 08/19 Work Pending AC-345 08/01 08/17 08/19 Work Pending AC-349 08/20 08/22 AC-415 08/16 Work Pending AC-442 08/01 08/02 08/03 08/07 08/11 08/17 08/19 08/21 AR-504 08/01 08/05 08/06 08/09 08/27 08/29 l 1422u

ATTACHME!;T SOUTHERN CALIFOR! IIA EDISON CO!'.PAliY I!10PERABLE FIRE DOORS FOR THE !!ONT!! OF AUGUST 1983 SAll O!10FRE 11UCLEAR GEt1ERATI!!G STATIOt1 Ut1ITS tiO. 2 AND 3, DOCKET 110S. 50-361 A!;D 50-362 (Continued)

III. Doors Blocked Open 11 umber of doors failing - 11, as follows:

Door tio.

Inoperable Operable AC-110 08/15 08/17 FH2-207 08/04 08/06 08/11 08/29 AC-304 08/01 08/02 08/19 Work In Progress AR-312 08/11 08/13 08/22 Work In Progress AR-313 08/26 08/27 AC-319 08/26 08/27 AC-348 08/01 08/02 08/21 08/26 AC-351 08/26 Work In Progress AR-404 08/22 08/30 AC-442 08/01 08/02 08/03 08/07 08/11 08/17 08/19 08/21 08/23 Work In Progress AR-510 08/09 08/12 08/26 Work In Progress 1422u

_ _ _ _ _ - _ _ - _ _ - _ _ _. _