Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069B879 + (ML20069B879)
- ML20069B880 + (ML20069B880)
- ML20069B884 + (ML20069B884)
- ML20069B885 + (ML20069B885)
- ML20069B886 + (ML20069B886)
- ML20069B889 + (ML20069B889)
- ML20069B890 + (ML20069B890)
- 05000237/LER-1983-012, Forwards LER 83-012/01T-0 + (ML20069B891)
- 05000424/LER-1994-003-03, :on 940426,PPAFES Were Found to Be Closed Due to Circuit Breakers Being Deenergized While Design Change Was Being Performed.Corrective Action:Engineers Will Be Trained & Circuit Breakers Have Been Corrected + (ML20069B892)
- ML20069B897 + (ML20069B897)
- ML20069B899 + (ML20069B899)
- ML20069B900 + (ML20069B900)
- ML20069B904 + (ML20069B904)
- 05000482/LER-1994-004, :on 940426,both Trains of Class 1E HVAC Sys Simultaneously Disabled Due to Inadequate Programmatic Controls.Train a of Class 1E HVAC Sys Restored & Train B of Class 1E HVAC Sys Repaired & Restored + (ML20069B905)
- ML20069B909 + (ML20069B909)
- ML20069B910 + (ML20069B910)
- 05000266/LER-1994-004, :on 940427,unexpected Automatic Trip of Reactor Occurred During Hot Control Rod Drop Testing Due to Inadequate Work Control.Human Performance Root Cause Evaluation 94-016 Being Conducted on Event + (ML20069B911)
- ST-HL-AE-4801, Responds to NRC Re Violations Noted in Insp Rept 50-498/94-12.Corrective actions:mid-loop Procedure Will Be Revised & Lessons Learned Briefings Were Conducted + (ML20069B914)
- ML20069B915 + (ML20069B915)
- ML20069B923 + (ML20069B923)
- ML20069B925 + (ML20069B925)
- ML20069B931 + (ML20069B931)
- 05000302/LER-1982-004, Forwards LER 82-004/01T-0 + (ML20069B934)
- ST-HL-AE-4792, Responds to NRC Re Violations Noted in Insp Rept 50-498/94-09.Corrective Actions:Surveillance Test Was Performed & Shift Supervisors Discussed Briefing Item on Lessons Learned with Crews + (ML20069B938)
- ML20069B940 + (ML20069B940)
- ML20069B944 + (ML20069B944)
- 05000302/LER-1982-004-01, /01T-0:on 820129,during Visual Insp of RCP-A Seal Package,Crack in Weld Between Third Stage Cavity & Vent Pipe Discovered.Caused by Crack in Weld Joint Where Vent Pipe Meets Cavity.Rebuilt Spare Seal Package Installed + (ML20069B945)
- ML20069B951 + (ML20069B951)
- ML20069B953 + (ML20069B953)
- ML20069B954 + (ML20069B954)
- ML20069B958 + (ML20069B958)
- 05000331/LER-1983-005, Forwards LER 83-005/03L-0 + (ML20069B960)
- ML20069B961 + (ML20069B961)
- ML20069B965 + (ML20069B965)
- ML20069B966 + (ML20069B966)
- ML20069B969 + (ML20069B969)
- ML20069B970 + (ML20069B970)
- ML20069B971 + (ML20069B971)
- 05000324/LER-1982-013, Forwards LER 82-013/03L-0 + (ML20069B972)
- ML20069B975 + (ML20069B975)
- 05000324/LER-1982-013-03, /03L-0:on 820116,reactor Low Level Switch 2-B21-LIS-N07 D-1 Actuated Below Min Level.Caused by Loose Setscrew Allowing Instrument Mechanism to Slip & Prevent Accurate Instrument Response.Screw Tightened + (ML20069B981)
- RBG-12-214, Responds to NRC Re Ultimate Capacity Analysis of Mark III Containments. Static Analysis of Containment & Drywell Expected to Be Complete by 820503.Second Analysis Will Not Begin Until Vendor Stress Repts Available + (ML20069B986)
- ML20069B987 + (ML20069B987)
- 05000331/LER-1983-005-03, /03L-0:on 830211,river Water Supply Sys Pumps 1P-117B & 1P-117D Declared Inoperative When ASME Allowables Exceeded.Caused by Instrument Error.Instrumentation Will Be Recalbr & Tested Before Startup from Refueling + (ML20069B988)
- ML20069B994 + (ML20069B994)
- RBG-40590, Responds to NRC Re Notice of Violation & Proposed Imposition of Civil Penalty Described in Insp Repts 50-458/92-15 & 50-458/93-24.Corrective Actions:Safeguards Info Program Transferred from Security to Records Mgt Group + (ML20069C002)
- ML20069C003 + (ML20069C003)
- ML20069C004 + (ML20069C004)
- ML20069C008 + (ML20069C008)
- 05000254/LER-1983-007, Forwards LER 83-007/03L-0 + (ML20069C010)
- ML20069C011 + (ML20069C011)