'o 6
\\
TENNESSESl)/6%EQUTHORITY CH AThANObb'I/T EN'Nf*KyE ; 7401 A
400 Chestnut Street Tower II 32 f ER 19 fefedy717, 1982 4
t--
co BLRD-50-438/81-16 s
BLRD-50-439/81-16
[y 9
Rec,D $
e
$5
%,9 U.S. Nuclear Regulatory Commission 788A Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 4/
(3 Atlanta, Georgia 30303 m
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - REACTOR BUILDING COOLING FANS -
BLRD-50-438/81-16, BLRD-50-439/81 FIFTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. W. Wright on January 28, 1981 in accordance with 10 CFR 50.55(e) as NCR 1351. This was followed by our interim reports dated February 27, June 2, September 3, and December 16, 1981. Enclosed is our fifth interim report. We expect to submit our next report by May 18, 1982. We consider 10 CFR Part 21 to be applicable to this deficiency.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY
):
. M. Mills, lianager Nuclear Regulation and Safety Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. James McFarland (Enclosure)
Senior Project Manager Babcock & Wilcox Company P.O. Box 1260 Lynchburg, Virginia 24505
,OFFiCI AL COPY bb t\\
92030E02Oi 820217 gDRADOCK05000 An Equal Opportunity Employer
a ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 REACTOR BUILDING COOLING FANS BLRD-50-438/81-16, BLRD-50-439/81-16 10 CFR 50.55(e)
FIFTH INTERIM REPORT Description of Deficiency The reactor building cooling system consists of three integral fan cooling coil units as well as other equipment. Onsite inspection of the fan motors by a service representative of the motor manufacturer (Reliance Electric Motor Company, Cleveland, Ohio) revealed that old grease in the bearings had become hard and that grease was forced onto the motor winding when new grease was pumped into the bearings.
The Reliance servico representative also witnessed the regreasing of the motor bearings. It was noted that grease easily purged out of the relief hole with the relief tubing disconnected; but when the tubing was reconnected, grease did not purge properly from the relief tubing.
Instead, it passed across the seal and onto the windings. This is due to the fact that the grease relief tubing in these fans is undersized.
Also, these fans are required to receive semiannual maintenance to include the purging of bearing grease. This cannot be easily accomplished with the present configuration of grease relief tubing.
The units were purchased from B&W.
Interim Progress A field change request (FCR) was generated on January 12, 1982, to document removal of the grease relief tubing. This FCR has been transmitted to B&W for their approval. B&W has requested revised lubrication schedules from the subvendor and will submit these schedules to IVA upon receipt.
+
o a