Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066H791 + (ML20066H791)
- ML20066H794 + (ML20066H794)
- NG-82-2259, Responds to NRC Re Violations Noted in IE Insp Rept 50-331/82-15.Corrective Actions:Calibr Procedures Written for Counting Room Instruments Used in Performing Required Measurements Utilizing ETS + (ML20066H796)
- ML20066H797 + (ML20066H797)
- 05000416/LER-1982-111, Forwards LER 82-111/99X-0 + (ML20066H799)
- 05000259/LER-1990-021, :on 900927,hourly Fire Watch Could Not Enter a 4,160-volt Shutdown Board Room to Perform Visual Insp of Area in Violation of Tech Spec.Caused by Procedural Deficiency.Fire Protection Plan Revised + (ML20066H802)
- ML20066H808 + (ML20066H808)
- 05000341/LER-1991-001, :on 910116,HPCI Inboard Steam Supply Valve E41-F002 Unexpectedly Closed During Surveillance.Caused by Malfunction of Transistor Q8 on Rosemount 510DU Trip Unit. Trip Unit Replaced + (ML20066H812)
- ML20066H816 + (ML20066H816)
- 05000416/LER-1982-111-99, /99X-0:on 821017,containment Main Steam Tunnel Temp Found in Excess of 125 F.Caused by Low Cooling Water Flow to Tunnel Cooler Due to Partially Open Valve.Valve Lineup Checked & Correct Valve Fully Opened + (ML20066H818)
- ML20066H823 + (ML20066H823)
- ML20066H825 + (ML20066H825)
- ML20066H826 + (ML20066H826)
- 05000416/LER-1982-117, Forwards LER 82-117/03L-0 + (ML20066H827)
- ML20066H835 + (ML20066H835)
- 05000366/LER-1991-002-01, :on 910130,train a of Standby Gas Treatment Sys Automatically Started & Refueling Floor & Reactor Bldg Ventilation Sys Isolated,Causing ESF Actuations.Caused by Blown Fuse.Failed Relay & Fuse Replaced + (ML20066H840)
- ML20066H846 + (ML20066H846)
- 05000416/LER-1982-117-03, /03L-0:on 821020,during shutdown,125-volt Battery Bank Pilot Cell 19 Failed to Meet Tech Spec Min Gravity 1.200.Battery Bank Placed on Equalize Charge for 24-h & Satisfactorily Tested + (ML20066H851)
- ML20066H873 + (ML20066H873)
- ML20066H879 + (ML20066H879)
- 05000368/LER-1991-001-02, :on 910114,two Through Wall Voids Found.Caused by Breakdown in Communication Between Electrical Maint & Fire Protection Personnel.Rev to Insp Procedures & Improved Training for Insp Personnel Implemented + (ML20066H883)
- 05000373/LER-1990-014-08, :on 901225,electrolyte Temp of 250-volt Battery Found to Be 62 F,Causing Inoperability of RCIC Sys.Caused by Inability of Temp Controller to Maintain Proper Temps. Portable Heaters Placed in Switchgear Room + (ML20066H884)
- ML20066H886 + (ML20066H886)
- ML20066H887 + (ML20066H887)
- ML20066H888 + (ML20066H888)
- ML20066H889 + (ML20066H889)
- ML20066H894 + (ML20066H894)
- ML20066H900 + (ML20066H900)
- NLS9100048, Submits 30-day Followup Rept of Util Investigation Into False Positive Drug Test Results Verbally Reported to NRC Operations Ctr on 901224.Error Due,In Part,To Bypassing Immunoassay Test Portion of Process + (ML20066H901)
- ML20066H910 + (ML20066H910)
- ML20066H914 + (ML20066H914)
- ML20066H915 + (ML20066H915)
- ML20066H919 + (ML20066H919)
- JPN-91-004, Forwards Revised Safety Evaluation Re Proposed Tech Spec Changes to Delete HPCI & RCIC Time Delay Relays,Per + (ML20066H921)
- ML20066H926 + (ML20066H926)
- ML20066H932 + (ML20066H932)
- ML20066H940 + (ML20066H940)
- ML20066H966 + (ML20066H966)
- 05000339/LER-1982-070, Forwards LER 82-070/03L-0 + (ML20066H992)
- ML20066J002 + (ML20066J002)
- ML20066J005 + (ML20066J005)
- 05000339/LER-1982-070-03, /03L-0:on 821025,acoustic Monitor for PORV-2456 Found to Be Inoperable.Caused by Failed Signal from Accelerometer,Originating in Accelerometer or Preamplifier. Active Channel Replaced W/Passibe Channel + (ML20066J018)
- 05000311/LER-1982-128, Forwards LER 82-128/01T-0.Detailed Event Analysis Encl + (ML20066J035)
- ML20066J041 + (ML20066J041)
- RBG-34-493, Monthly Operating Rept for Jan 1991 for River Bend Station Unit 1 + (ML20066J050)
- ML20066J061 + (ML20066J061)
- JPN-91-007, Forwards Rev 13 to Security Plan,Reflecting Completion of New Warehouse Facility.Rev Withheld (Ref 10CFR73.21 & 2.790(d)(1)) + (ML20066J074)
- 05000325/LER-1982-127-01, /01T-0:on 821103,quick Start Testing of Diesel Generators 2,3 & 4 Not Performed as Required.Caused by Personnel Not Entering Requirement Into Daily Rept.Personnel Instructed + (ML20066J077)
- ML20066J078 + (ML20066J078)
- HL-1476, Monthly Operating Repts for Jan 1991 for Hatch Units 1 & 2 + (ML20066J082)
- ML20066J087 + (ML20066J087)