Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1262, Responds to NRC 900604 Request for Addl Info on Disposition of NRC Bulletin 88-005 Product Forms,Other than Pipe Fittings & Flanges.West Jersey Mfg Was Only Supplier of Suspect Matl + (ML20065Q669)
- 0CAN108201, Forwards Public Version of Amend 6 to Emergency Plan + (ML20065Q672)
- ML20065Q675 + (ML20065Q675)
- ML20065Q699 + (ML20065Q699)
- ML20065Q703 + (ML20065Q703)
- ML20065Q728 + (ML20065Q728)
- ML20065Q753 + (ML20065Q753)
- RBG-34146, Forwards Revised Response to Violations Noted in Insp Rept 50-458/90-02 on 900122-26,per 900918 & 0507 Ltrs Re Energizing Outboard Isolation Valve 1B21*MOVF019 for Mainsteam Drain Lines During Startup of Operations + (ML20065Q754)
- ML20065Q757 + (ML20065Q757)
- ML20065Q767 + (ML20065Q767)
- ELV-02272, Requests Authorization to Conduct After Hours Unannounced Drill During CY91 in Lieu of After Hours Unannounced Emergency Prepared Exercise.Items That Drill Will Provide Listed + (ML20065Q780)
- NG-94-1668, Forwards 1993 Annual Radiological Environ Operating Rept for Duane Arnold Energy Center + (ML20065Q808)
- NRC-94-4106, Forwards Proprietary Addl Info in Support of Westinghouse Response to RAI 952.48 on AP600 Design.Encl Withheld + (ML20065Q817)
- ML20065Q824 + (ML20065Q824)
- ML20065Q832 + (ML20065Q832)
- ML20065Q835 + (ML20065Q835)
- ML20065Q845 + (ML20065Q845)
- HL-1375, Responds to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. Detailed Safety Assessment Encl + (ML20065Q847)
- ML20065Q851 + (ML20065Q851)
- ML20065Q853 + (ML20065Q853)
- ML20065Q856 + (ML20065Q856)
- ML20065Q858 + (ML20065Q858)
- ML20065Q864 + (ML20065Q864)
- ML20065Q887 + (ML20065Q887)
- ML20065Q895 + (ML20065Q895)
- ML20065Q899 + (ML20065Q899)
- ML20065Q900 + (ML20065Q900)
- ML20065Q904 + (ML20065Q904)
- ML20065Q905 + (ML20065Q905)
- ML20065Q907 + (ML20065Q907)
- ML20065Q911 + (ML20065Q911)
- ML20065Q923 + (ML20065Q923)
- ML20065Q931 + (ML20065Q931)
- ML20065Q949 + (ML20065Q949)
- ML20065Q953 + (ML20065Q953)
- ML20065Q966 + (ML20065Q966)
- BSEP-94-0160, Radiological Environ Operating Rept 1993 Brunswick Nuclear Project + (ML20065Q978)
- PLA-3474, Requests Exemption from Branch Technical Position Etsb 11-1, Section IV, Hydrostatic Testing of D-Augmented Piping Sys. Approval Requested by 910401 + (ML20065Q988)
- A09140, Responds to NRC Re Violations/Deviations Noted in Insp Rept 50-336/90-18.Corrective Actions:Head End of Cable Connections Temporarily Reversed & New Labels Installed on Jumper Cables + (ML20065Q991)
- ML20065R010 + (ML20065R010)
- ML20065R015 + (ML20065R015)
- ML20065R018 + (ML20065R018)
- ML20065R021 + (ML20065R021)
- ML20065R029 + (ML20065R029)
- ML20065R031 + (ML20065R031)
- ML20065R032 + (ML20065R032)
- ML20065R033 + (ML20065R033)
- 05000416/LER-1982-074, Forwards LER 82-074/03L-0 + (ML20065R041)
- ML20065R047 + (ML20065R047)
- 05000416/LER-1982-074-03, /03L-0:on 820923,review Revealed Only One ECCS Operational During 820722 Fuel Load.Caused by Personnel & Procedural Error Resulting in Operators Not Being Fully Aware of ECCS Status.Equipment Problems Corrected + (ML20065R058)
- ML20065R071 + (ML20065R071)