Sixth Interim Deficiency Rept Re Piping Potential Safety Concern.Initially Reported on 801121.B&W Analyses Completed Except for in-core Piping.Next Rept by 830523.Also Reported Per Part 21
ML20065R071
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 10/14/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8210290059
Download: ML20065R071 (2)


Text

,N TENNESSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 37401 C

- : r.

400 Chestnut Street Tower II D

~2

"._4 M

October 14, 1982 g

Q.m

's I;Oc i5 U.S. Nuclear Regulatory Commission E5 Region II

-32 Attn:

W. James P. O'Reilly, Regional Administrator c:3 101 Marietta Street, Suite 3100

'c Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - ATTACHED PIPING POTENTIAL SAFETY CONCERN - NCR BLN NEB 8008 - SIITH INTERIM REPORT On November 21, 1980, R. W. Wright, NRC-0IE Region II, was informed that the subject nonconformance was determined to be reportable in accordance with 10 CFR 50.55(e). This was followed by our interim reports dated December 19, 1980, April 2 and July 17, 1981, and February 17 and June 22, 1982. Enclosed is our sixth interim report. We consider 10 CFR Part 21 to be applicable to this nonconformance. We expect to submit our next report by May 23, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, l

TENNESSEE VALLEY AUTHORITY l

N.YM L. M. Mills, Manager Nuclear Licensing Enclosure cc: lir. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. James McFarland (Enclosure)

Senior Project Manager Babcock & Wilcox Company P.O. Box 1260 Lynchburg, Virginia 24505 CON sgho2;ggoggggg og #

e

<rM An Ecua! Opportumty Emptcyer

b ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 ATTACHED PIPING POTENTIAL SAFETY CONCERN NCR BLN NEB 8008 10 CFR 50.55(e)

SIXTH INTERIM REPORT Description of Deficiency Babcock and Wilcox (B&W), Lynchburg, Virginia, has uncovered an inconsistency between the assumptions relative to pipe breaks in the loss-of-coolant accident (LOCA) analysis and the structural analysis of certain connecting pipes in the affected or broken loop.

The LOCA analysis does not assume a consequential failure of piping caused by a LOCA pipe break. Certain piping and instrumentation connections to the Reactor Coolant System (RCS) may not be adequately designed to maintain function or to resist consequential failures as a result of the LOCA break in the Reactor Coolant System. Consequential failures of these piping connections could represent an inconsistency with the ECCS analysis performed for Bellefonte.

Interim Progress B&W has performed an investigation on the 205 FA plants where the high energy lines (which could be subjected to major displacements), jet impingement, and/or pipe whip from a spectrum of LOCA pipe breaks were listed. A comparison was made of the connecting lines which were aesigned for the appropriate displacements and loadings from LOCA breaks. This investigation significantly reduced the number of piping connections of concern. However, some potential problem areas were identified.

These problem areas were categorized into three groups as listed in the fourth and fifth interim reports. All B&W analyses for group one have been completed except for the incore piping. B&W's schedule for completing the incore piping evaluation has been changed from September 1, 1982, to March 1, 1983 All B&W and TVA analyses for g";upa 2 and 3 have been completed.

B&W is also to advise TVA of the assignable cause of the nonconforming condition and action required to prevent recurrence by November 11, 1982.

-