Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1993-019, :on 930722,automatic Actuation of RHR Sys Portion of PCIS Occurred.Caused by Momentary Pressure Transient That Actuated Protective High Pressure Switches. Calibr Performed + (ML20056F612)
- JPN-93-060, Forwards Proprietary Rev 1 to NEDC-32016P-1, Power Uprate Safety Analysis for Ja FitzPatrick Nuclear Power Plant, Per 920605 Proposed Changes to TS Re Power Uprate.Safety Analysis Withheld,Per 10CFR2.790 + (ML20056F613)
- IR 05000348/1993005 + (ML20056F614)
- ML20056F632 + (ML20056F632)
- ML20056F644 + (ML20056F644)
- ML20056F645 + (ML20056F645)
- ML20056F657 + (ML20056F657)
- ML20056F661 + (ML20056F661)
- ML20056F669 + (ML20056F669)
- ML20056F673 + (ML20056F673)
- ML20056F680 + (ML20056F680)
- HL-3428, Plant Ei Hatch,Units 1 & 2 Semiannual Radioactive Effluent Release Rept,Jan-June 1993 + (ML20056F685)
- ML20056F686 + (ML20056F686)
- ML20056F695 + (ML20056F695)
- BSEP-93-0134, Requests Relief for Temporary non-code Repair to SWS for Bsep,Unit 1,per GL 90-05.Alternate Requirements Provided in Engineering Evaluation Rept 93-0502, Operability Assessment of Pinhole Leak in 6 Vital SW Header + (ML20056F696)
- ML20056F699 + (ML20056F699)
- 0CAN089305, Forwards Comments on GL 86-10,Suppl 1, Fire Endurance Acceptance Criteria for Fire Barrier Sys Used to Separate Redundant Safe Shutdown Trains within Same Fire Area + (ML20056F705)
- ML20056F706 + (ML20056F706)
- ML20056F707 + (ML20056F707)
- ML20056F709 + (ML20056F709)
- ML20056F711 + (ML20056F711)
- ML20056F712 + (ML20056F712)
- ML20056F714 + (ML20056F714)
- ML20056F716 + (ML20056F716)
- 05000424/LER-1993-009-01, :on 930728,reactor Tripped During Maint Due to Low Pressure Signal.Caused by Cognitive Personnel Error. Personnel Involved Disciplined & Reminded of Importance of Procedural Compliance + (ML20056F722)
- ML20056F725 + (ML20056F725)
- ML20056F729 + (ML20056F729)
- ML20056F733 + (ML20056F733)
- ML20056F735 + (ML20056F735)
- ML20056F738 + (ML20056F738)
- ML20056F742 + (ML20056F742)
- ML20056F743 + (ML20056F743)
- ML20056F744 + (ML20056F744)
- L-93-205, Forwards Physical Security Plan,Rev 5 Suppl for Units 3 & 4 Under 10CFR50.54(p) Re Temporary Relocation of Section of Protected Area Barrier to Facilitate Central Receiving Facility Reconst Efforts.Suppl Withheld + (ML20056F745)
- ML20056F746 + (ML20056F746)
- 05000370/LER-1993-004-03, :on 930725,discovered That TS Violated as Result of Past Inoperability of Valve 2RV-80B Due to Inappropriate Action.Sys Engineering Personnel Will Evaluate Placing Stem Cap on Valve 2RV-80B + (ML20056F747)
- ML20056F748 + (ML20056F748)
- ML20056F750 + (ML20056F750)
- ML20056F756 + (ML20056F756)
- B14589, Forwards Schedule for Resolution of 13 Unresolved Items Noted in Electrical Distribution Sys Functional Insp Rept 50-336/93-81 on 930315-0402 + (ML20056F757)
- ML20056F758 + (ML20056F758)
- HL-3417, Comments on Regulatory Review Group Rept Which Appeared in 930518 Fr.Util in Agreement W/Numarc Comments to Be Provided to NRC + (ML20056F761)
- ML20056F762 + (ML20056F762)
- ML20056F764 + (ML20056F764)
- ML20056F765 + (ML20056F765)
- ML20056F766 + (ML20056F766)
- ML20056F767 + (ML20056F767)
- ML20056F768 + (ML20056F768)
- ML20056F769 + (ML20056F769)
- ML20056F771 + (ML20056F771)
- ML20056F772 + (ML20056F772)