Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20052G392 + (ML20052G392)
- ML20052G394 + (ML20052G394)
- ML20052G397 + (ML20052G397)
- ML20052G398 + (ML20052G398)
- ML20052G401 + (ML20052G401)
- ML20052G402 + (ML20052G402)
- ML20052G405 + (ML20052G405)
- ML20052G406 + (ML20052G406)
- ML20052G409 + (ML20052G409)
- 05000267/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Encl + (ML20052G410)
- ML20052G413 + (ML20052G413)
- 05000267/LER-1982-012-03, /03L-0:on 820410,at 10% Power,Instrument Air Compressor 1C Temporarily Taken Out of Svc to Repair after- Cooler Leak.Water Leak Caused by Normal Wear of after- Cooler.Air Compressor Returned to Svc After Repairs + (ML20052G415)
- ML20052G416 + (ML20052G416)
- ML20052G417 + (ML20052G417)
- 05000327/LER-1982-048, Forwards LER 82-048/03L-0 + (ML20052G418)
- ML20052G422 + (ML20052G422)
- PNO-I-82-037, on 820513,worker Sustained Skin Contamination During Eddy Current Testing on 2B Reactor Water Cleanup Nonregenerative Hx.External Contamination Occurred on 1x1 Inch Area of Right Shoulder.Worker Decontaminated + (ML20052G423)
- ML20052G424 + (ML20052G424)
- 05000327/LER-1982-048-03, /03L-0:on 820408,at 100% Power,Automatic Control Valve 1-PCV-3-132 in Auxiliary Feedwater Sys Flowpath Failed to Open on Demand.Caused by Faulty Soldered Amphenol Connector to Electrohydraulic Actuator.Connector Repaired + (ML20052G425)
- ML20052G427 + (ML20052G427)
- ML20052G429 + (ML20052G429)
- 05000316/LER-1982-034, Forwards LER 82-034/03L-0 + (ML20052G430)
- 05000335/LER-1982-012, Forwards LER 82-012/03L-0 + (ML20052G432)
- PNO-V-82-025, on 820513,resident Inspector Reported Both Trains of Saltwater Cooling Sys Lost for 24 Minutes.Caused by Maint of Saltwater Pump Internals Causing Flooding of Pump Bay & Temp Rise in Component Cooling Water + (ML20052G434)
- ML20052G435 + (ML20052G435)
- ML20052G437 + (ML20052G437)
- 05000301/LER-1982-002, Forwards LER 82-002/01T-0 + (ML20052G438)
- 05000335/LER-1982-012-03, /03L-0:on 820410,while Operating at 99% Power,W/ Charging Pump B Out of Svc,Charging Pump C Exhibited Low Flow & Declared Inoperable.Caused by Faulty Pump Internal Suction & Discharge Valves.Valves Replaced + (ML20052G440)
- ML20052G441 + (ML20052G441)
- 05000316/LER-1982-034-03, /03L-0:on 820412,during Normal Operation,Test of Control Room Emergency Ventilation Sys Found That Air Flow Was 7,370 Cfm for 2-ACRF-1.Caused by Lack of Procedure to Verify Airflow After Prefilter Changes.Procedure Modified + (ML20052G442)
- ML20052G443 + (ML20052G443)
- 05000344/LER-1982-006, Forwards LER 82-006/01T-0.Detailed Event Analysis Encl + (ML20052G444)
- 05000289/LER-1982-005, Forwards LER 82-005/03L-0 + (ML20052G446)
- ML20052G448 + (ML20052G448)
- 05000344/LER-1982-006-01, /01T-0:on 820426,17 Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by Water Jet Impingement & Induced Vibration on Fuel Rods.Fuel Assemblies Modified Using Stainless Steel Pins + (ML20052G449)
- 05000301/LER-1982-002-01, /01T-0:on 820428,during Eddy Current Exam, Discovered Abnormal Degradation in Fuel Cladding,Rcpb & Primary Containment.Seludge Lancing Will Be Performed + (ML20052G450)
- PNO-III-82-045, on 820511,plant Shut Down to Perform Maint to Repair Main Steam Line Drain Line Leakage in Reactor Containment Drywell & Repair Condensate Min Flow Valve. Leakage Not in Excess of Tech Spec Limits + (ML20052G451)
- 05000331/LER-1982-028, Forwards LER 82-028/03L-0 + (ML20052G452)
- ML20052G454 + (ML20052G454)
- ML20052G455 + (ML20052G455)
- PM-82-376, RO 50-321/1979-021:on 820423,tritium Levels Exceeded 3.0 E4 pCi/1 Allowance for Tritium in Environ Water Samples Per Table 3.2-3 of Ets.Cause Might Be Attributed to Slight Shifts in Main Body of Tritiated Groundwater + (ML20052G457)
- 05000289/LER-1982-005-03, /03L-0:on 820411,while in Ordered Shutdown,Liquid Effluent Radiation Monitor Discovered Inoperable.Caused by Failure of Pump SR-P4,due to Piping Clogged W/Mud.Piping Cleared & Motor Replaced + (ML20052G458)
- 05000324/LER-1982-065, Forwards LER 82-065/03L-0 + (ML20052G459)
- 05000324/LER-1982-065-03, /03L-0:on 820330,during Reactor Core Isolation Sys Isolation Channel Functional & Operability Test,Hpci Sys Automatically Isolated.Caused by Technician Inadvertently Lifting Terminal CC-19 Wire.Wire Reterminated + (ML20052G463)
- ML20052G464 + (ML20052G464)
- 1CAN058202, Advises of Error Made in NRC Providing 820302 Meeting Minutes Re Failed Fuel Investigations.Internal Clad Attack in Introduction Should Read External Clad Attack. First Paragraph Under Discussion & Conclusion Clarified + (ML20052G466)
- ML20052G467 + (ML20052G467)
- ML20052G468 + (ML20052G468)
- IR 05000409/1982004 + (ML20052G472)
- ML20052G473 + (ML20052G473)
- 05000327/LER-1982-050, Forwards LER 82-050/03L-0 + (ML20052G474)