Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035G158 + (ML20035G158)
- ML20035G159 + (ML20035G159)
- ML20035G161 + (ML20035G161)
- ML20035G162 + (ML20035G162)
- 05000282/LER-1990-002-01, Forwards LER 90-002-01 Re Excessive Pressurizer Cooldown Rate & Excessive Spray/Pressurizer delta-T.Procedures Will Be Revised to Require Use of Pressurizer Water Temp for Determining Pressurizer Heatup & Cooldown Rates + (ML20035G163)
- ML20035G166 + (ML20035G166)
- 05000354/LER-1993-001-01, Forwards Revised LER 93-001-01,correcting Typo in LER Number Specified in Previous Occurrence Section from 86-009-00 to 89-006-00 + (ML20035G168)
- ML20035G170 + (ML20035G170)
- 05000354/LER-1993-001, :on 930216,while Performing Monthly Functional Test for HPCI Sys Delta T Channel A5,discovered That Channel Under Test in Bypass Condition.Caused by Procedural Inadequacy.Procedures Re Use of Spare Channel Revised + (ML20035G171)
- ML20035G174 + (ML20035G174)
- ML20035G175 + (ML20035G175)
- 05000382/LER-1992-019-01, :on 920327,indicated That Actual RCS Boron Concentration Below Required Concentration.Caused by Inadequate Procedure Guidance.C/A Included Procedure Changes to Account for Training of Personnel + (ML20035G180)
- 05000353/LER-1993-005, :on 930326,reactor Scram Occurred in Response to Inadvertent Closure of Main Turbine/Main Stop Valves & Automatic Reactor Protection Sys Actuated.Caused by Air Entrained in Control Sys.Orifices Installed in Ports + (ML20035G182)
- ML20035G184 + (ML20035G184)
- ML20035G186 + (ML20035G186)
- ML20035G188 + (ML20035G188)
- ML20035G189 + (ML20035G189)
- ML20035G190 + (ML20035G190)
- ML20035G191 + (ML20035G191)
- ET-NRC-93-3862, Forwards Rev 1 to Proprietary NRC-Requested Catawba Unit 1 SG Leakage Evaluation, in Response to NRC Request at Unit 1 SG Tube Interim Plugging Criterion Meeting of 930401.Rev Withheld (Ref 10CFR2.790) + (ML20035G192)
- ML20035G193 + (ML20035G193)
- ML20035G194 + (ML20035G194)
- LD-93-065, Forwards Markups to CESSAR-Design Certification for Closure of Corresponding Dser,Including Revs to I&C Sys Descriptions in Chapter 7 & Revs to Fire Protection Sys Description in Section 9.5.1 + (ML20035G195)
- LD-93-068, Forwards Revised Bases for Sys 80+ Ts.Revs Will Be Included in CESSAR-Design Certification,Amend O,Which Will Be Printed in May 1993 + (ML20035G196)
- ML20035G198 + (ML20035G198)
- ML20035G199 + (ML20035G199)
- ML20035G200 + (ML20035G200)
- ML20035G201 + (ML20035G201)
- ML20035G202 + (ML20035G202)
- ML20035G204 + (ML20035G204)
- ML20035G211 + (ML20035G211)
- ML20035G214 + (ML20035G214)
- ML20035G217 + (ML20035G217)
- ML20035G218 + (ML20035G218)
- ML20035G219 + (ML20035G219)
- ML20035G221 + (ML20035G221)
- ML20035G223 + (ML20035G223)
- ML20035G224 + (ML20035G224)
- ML20035G227 + (ML20035G227)
- ML20035G228 + (ML20035G228)
- ML20035G229 + (ML20035G229)
- ML20035G231 + (ML20035G231)
- ML20035G232 + (ML20035G232)
- 05000333/LER-1993-007-01, :on 930322,determined That Thermal Power Trip Function of APRM Not Tested to Completion When RPS Bypassed Resulting in Blocked Initiation of Scram Signal.Caused by Procedural Deficiency.Procedures Revised + (ML20035G233)
- PY-CEI-NRR-1628, Forwards 1992 Annual Financial Repts for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,Unit 1, Respectively + (ML20035G236)
- ML20035G241 + (ML20035G241)
- ML20035G243 + (ML20035G243)
- ML20035G248 + (ML20035G248)
- ML20035G252 + (ML20035G252)
- ML20035G253 + (ML20035G253)
- ML20035G255 + (ML20035G255)