Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033B380 + (ML20033B380)
- ML20033B381 + (ML20033B381)
- ML20033B382 + (ML20033B382)
- IR 05000352/1981014 + (ML20033B383)
- 05000369/LER-1981-169, Forwards LER 81-169/03L-0.Detailed Event Analysis Encl + (ML20033B386)
- ML20033B388 + (ML20033B388)
- 05000369/LER-1981-169-03, /03L-0:on 811021,channel 3 Monitoring Loss of Flow in Reactor Coolant Loop C Appeared to Be Out of Calibr & Declared Inoperable.Caused by Malfunctioning Flow Transmitter.Transmitter Replaced & Root Line Leak Repaired + (ML20033B389)
- ML20033B390 + (ML20033B390)
- 05000324/LER-1981-119, Forwards LER 81-119/03L-0 + (ML20033B392)
- ML20033B394 + (ML20033B394)
- 05000325/LER-1981-080, Forwards LER 81-080/03L-0 + (ML20033B395)
- 05000324/LER-1981-119-03, /03L-0:on 811029,RHR Relay Logic a Power Failure Occurred Making LPCI Function of a RHR Subsystem Inoperable. Caused by Accidental Shorting to Ground of Instrument Power Supply Lead While Removing Wire from Switch Terminal + (ML20033B397)
- ML20033B398 + (ML20033B398)
- ML20033B400 + (ML20033B400)
- 05000325/LER-1981-080-03, /03L-0:on 811107,personnel Airlock Interior Door Leakage Rate Exceeded Limit.Caused by Door Roller Assembly Maladjustment Which Prevented Contact of Door & Door Frame Seating Surfaces.Roller Assembly Adjusted + (ML20033B401)
- ML20033B402 + (ML20033B402)
- ML20033B405 + (ML20033B405)
- ML20033B406 + (ML20033B406)
- ML20033B408 + (ML20033B408)
- IR 05000245/1981011 + (ML20033B409)
- ML20033B411 + (ML20033B411)
- A02055, Responds to NRC Re Violations Noted in IE Insp Repts 50-245/81-11 & 50-336/81-10.Corrective Actions:Waste Concentrator & Radwaste Operating Procedures Will Be Updated,Per Reg Guide 1.33 + (ML20033B413)
- ML20033B414 + (ML20033B414)
- 05000325/LER-1981-078, Forwards LER 81-078/03L-0 + (ML20033B415)
- ML20033B417 + (ML20033B417)
- 05000325/LER-1981-078-03, /03L-0:on 811104,primary Containment Isolation Valve Found Closed w/sealed-in Open Command Signal.Caused by Slight Binding of Valve Stem That Prevented Operator from Opening Valve After Manual Closure + (ML20033B420)
- IR 05000373/1981016 + (ML20033B421)
- 05000324/LER-1981-122, Forwards LER 81-122/03L-0 + (ML20033B422)
- ML20033B424 + (ML20033B424)
- 05000280/LER-1981-066, Forwards LER 81-066/03L-0 & Updated LER 81-055/03X-1 + (ML20033B425)
- ML20033B427 + (ML20033B427)
- ML20033B428 + (ML20033B428)
- 05000324/LER-1981-122-03, /03L-0:on 811029,core Spray or RHR Pumps Running Annunciator Received & No Abnormalities Found.Caused by Inadequate Maint Permitting Corrosion to Actuate Switch & Cause Alarm.Switch Cleaned & Calibr + (ML20033B429)
- 05000280/LER-1981-066-03, /03L-0:on 811027,technical Review Found Not Yet Begun on Design Change Package That Relocated Portions of Yard Firemain Piping.Caused by Project Engineer Administrative Error.Documents Updated + (ML20033B430)
- ML20033B431 + (ML20033B431)
- 05000324/LER-1981-120, Forwards LER 81-120/03L-0 + (ML20033B432)
- 05000280/LER-1981-055-03, Both Charging Pump Svc Water Pumps Failed.Caused by Failure of Carbon Steel Cap Screw on One Pump Allowing Impeller to Bind & Shorting Out of Motor Stator Windings of Second Pump + (ML20033B434)
- ML20033B435 + (ML20033B435)
- 05000249/LER-1981-034, Fowards LER 81-034/03L-0.Detailed Event Analysis Encl + (ML20033B436)
- 05000324/LER-1981-120-03, /03L-0:on 811102,core Spray or RHR Pumps Running Annunciator Received & No Abnormalities Found.Caused by Internal Moisture Accumulation Actuating Permissive Pressure Switch.Moisture Removed & Switch Calibr + (ML20033B440)
- 05000249/LER-1981-034-03, /03L-0:on 811026,source Range Monitor Channels 21 & 22 Found to Trip at Level Exceeding Tech Spec Limit.Caused by Drift of High Alarm Setpoint Potentiometer.Setpoints Adjusted + (ML20033B441)
- ML20033B443 + (ML20033B443)
- 05000369/LER-1981-170, Forwards LER 81-170/03L-0.Detailed Event Analysis Encl + (ML20033B444)
- 05000338/LER-1981-078, Forwards LER 81-078/03L-0 + (ML20033B446)
- ML20033B448 + (ML20033B448)
- ML20033B451 + (ML20033B451)
- 05000369/LER-1981-170-03, /03L-0:on 811025,temp Indication for Reactor Coolant Pump 1C Motor Upper Thrust Bearing Exceeded Limit. Apparently Caused by Corrosion on Screw Connections Where Thermocouple Cable Attaches in Terminal Cabinet + (ML20033B452)
- 05000338/LER-1981-078-03, /03L-0:on 811111,axial Flux Difference Deviated More than -5% from Target for More than 12 Minutes.Caused by Rapid Power Reduction Necessitated by Fire on C Main Feedwater Pump.Boration Begun at Increased Rate + (ML20033B453)
- ML20033B454 + (ML20033B454)
- 05000364/LER-1981-048, Forwards LERs 81-041/03L-1 & 81-048/03L-0.W/o LER 81-048/03L-0 + (ML20033B455)
- PNO-II-81-106, on 811125,transformer Failure Resulted in 15-minute Loss of Power to Control Room Annunciators. Annunciator Power Restored by Switching to Redundant Power Source.Caused by Primary Winding Fault in Transformer + (ML20033B457)