Requests Confirmation of Planned Util Action Re Emergency Response Organization Personnel Training,To Be Completed by 811116
ML20033B390
Person / Time
Site: Calvert Cliffs  
Issue date: 11/19/1981
From: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 8112010352
Download: ML20033B390 (2)


Text

i v

HDV 1 91981 Docket Nos. 50-317 p'a f

50-318 f

'ls) f 3

Baltimore Gas and Electric Company H0t'3 0 1 b ATTN: Mr. A. E. Lundvall, Jr.

u^* DE@N }

Vice President, Supply P. O. Box 1475 Baltimore, Maryland 21203 s T/

g Gentlemen:

This letter refers to our letter to you dated November 6,1981 and to subsequent telephone discussions between Messrs. T.N. Pritchett and S.E.

Jones of your staff, and Mr. G.L. Snyder of my staff on November 10, 1981.

Your staff members expressed concern that items 2 and 3 in our letter dated November 6 were broader in scope than had been agreed upon. Based on discussion of these two items, we understand that the following equivalent actions were completed by November 16, 1981.

2.

Determine which emergency response and ot.her necessary operations personnel must perform essential duties in locations where significant airborne radioactive contamination can be present during emergency conditions.

Determ!ne the availability and storage location of appropriate resp %atory protection equipment (self-contained breathing devices).

Insure that presently available respiratory protection equipment is located and available to personnel performing essential duties.

If additional respiratory protection equipment is required, inform the NRC Region I Office, in writing, of the plans and schedule for procuring the additional equipment.

3a Using your present training program, complete the training of emergency response organization personnel for whom training deficiencies have been identified.

3b Qualify your instructors and prepare formal lesson plans for use during subsequent training.

If our understanding of your planned actions, de'cribed above, is not in accordance.with the actual plans and actions being implemented, please contact this office by telephone and in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

h5 R dPOS RI:D s

R1:

R1:

Sn

/wb

'th te hay StarpT()

I'IM

\\

11 3/81 0

OFF AL RECORD COPY JO

[

8112010352 811119 f($I DR ADOCK 05000317 PDR

h Baltimore Gas and Electric Company 2

Your cooperation in this matter is appreciated.

Sincerely, Original signed By:

Ronald C. Haynes -

Regional Administrator cc:

R. M. Douglass, Manager, Quality Assurance L. B. Russell, Plant Superintendent, (Receives 2.790 Info)

~

T. Sydnor, General Supervisor, Operations QA R. C. L. Olson, Principal Engineer J. A. Tiernan, Manager, Nuclear Power T. N. Pritchett, Project Manager, Nuclear Emergency Programs S. E. Jones, Supervisor of Training R. E. Denton, General Supervisor, Training and Technical Services Public Document Room (PDR)_

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Maryland (2) bec:

. Region I Docket Room (with concurrences)-

l OFFICIAL RECORD COPY 1