Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000339/LER-1981-008-03, /03L-0:on 810107,primary Coolant Iodine Isotopic Analysis Not Made within 2-6 Hour Per Tech Spec Re Power Changes Exceeding 15% Per Hour.Caused by Failure of Operations Personnel to Follow Procedures.Sample Analyzed + (ML20003B161)
- 05000339/LER-1981-011-03, /03L-0:on 810114,w/unit at 100% Power,Breaker for 2-QS-P-1A Spray Pump Racked Out & Suction Valve MOV-QS-200A Closed & de-energized.Caused by Dirty Seat on Vent Valve. Valve Seat Cleaned & Disc Lapped + (ML20003B163)
- ML20003B164 + (ML20003B164)
- 05000321/LER-1981-005, Forwards LER 81-005/03L-0 + (ML20003B165)
- ML20003B166 + (ML20003B166)
- 05000271/LER-1981-002, Forwards LER 81-002/03L-0 + (ML20003B167)
- ML20003B168 + (ML20003B168)
- ML20003B169 + (ML20003B169)
- ML20003B171 + (ML20003B171)
- 05000321/LER-1981-005-03, /03L-0:on 810113,during Steady State Operation, Drywell Temp Recorder IT47-R612 Found to Be Inoperative. Caused by Misalignment of Cam Follower Contact W/Main Programming Cam.Follower Adjusted to Maintain Contact W/Cam + (ML20003B172)
- 05000271/LER-1981-002-03, /03L-0:on 810106,quarterly Stack Particulate Composite Could Not Be Completed Per Tech Specs.Caused by Stack Sample Filters for Oct Being Misplaced.Personnel Reinstructed Re Location & Storage of Filters + (ML20003B173)
- ML20003B174 + (ML20003B174)
- ML20003B175 + (ML20003B175)
- 05000325/LER-1981-008, Forwards LER 81-008/03L-0 + (ML20003B176)
- ML20003B177 + (ML20003B177)
- 05000271/LER-1981-003, Forwards LER 81-003/03L-0 + (ML20003B178)
- ML20003B179 + (ML20003B179)
- 05000327/LER-1981-002, Forwards LER 81-002/03L-0 + (ML20003B180)
- ML20003B181 + (ML20003B181)
- 05000271/LER-1981-003-03, /03L-0:on 810106,surveillance Frequency for Monthly Diesel Fuel Oil Quality Analysis Was Exceeded.Caused by Personnel Oversight.Analysis Performed W/Satisfactory Results + (ML20003B183)
- 05000325/LER-1981-008-03, /03L-0:on 810106,while Performing Primary Containment Leak Rate Testing of Personnel Airlock Doors, Discovered That Drywell Exterior Airlock Door Leakage Rate Exceeded Limits.Caused by Tubing Fitting Lodged in Door + (ML20003B184)
- 05000327/LER-1981-002-03, /03L-0:on 810109,two Intermediate Deck Doors in Ice Condenser Found Frozen Closed.Caused by Water Leaking from AHU-3A Defrost Drain Line Flange Due to Loose Flange Bolts.Bolts Retightened + (ML20003B185)
- 05000318/LER-1981-001, Forwards LER 81-001/03L-0 + (ML20003B186)
- ML20003B187 + (ML20003B187)
- 05000259/LER-1981-002, Forwards LER 81-002/03L-0 + (ML20003B188)
- ML20003B189 + (ML20003B189)
- 05000336/LER-1981-002, Forwards LER 81-002/03L-0 + (ML20003B190)
- ML20003B191 + (ML20003B191)
- 05000259/LER-1981-002-03, /03L-0:on 810114,smoke Detector in Relay Room Alarmed & Would Not Clear.Caused by Detector Sensitivity Increasing Due to Normal,Natural Aging.Detector Replaced & Tested + (ML20003B192)
- 05000318/LER-1981-001-03, /03L-0:on 810107,Channel B Reactor Protective Sys Trip Units for High Power,Thermal Margin/Low Pressure & Axial Flux Offset Bypassed for Troubleshooting Linear Power Range Instrument.Detector Output Faulty + (ML20003B193)
- 05000302/LER-1981-001, Forwards LER 81-001/01T-0 + (ML20003B194)
- ML20003B195 + (ML20003B195)
- PNO-III-81-016, on 810206,EPA Issued Show Cause Order Based on Rn-222 Emanation Levels from Residue Piles at Site & Thorium Contamination in Kress Creek in Excess of EPA Stds + (ML20003B196)
- 05000259/LER-1981-003, Forwards LER 81-003/01T-0 + (ML20003B197)
- ML20003B198 + (ML20003B198)
- 05000302/LER-1981-001-01, /01T-0:on 810107,during Performance of Quarterly Battery Check SP-511,determined That Battery Did Not Meet Tech Spec Requirements.Caused by Decrease in Specific Gravity of One Cell.Battery Placed on Equalize Charge + (ML20003B201)
- 05000259/LER-1981-003-01, /01T-0:on 810124,Div of Engineering Notified That 1-inch Vent Line on Unit 1 Scram Discharge Vol Not Seismically Qualified.Caused by Piping Configuration Not Conforming to Design Requirements + (ML20003B202)
- ML20003B203 + (ML20003B203)
- ML20003B204 + (ML20003B204)
- ML20003B206 + (ML20003B206)
- ML20003B207 + (ML20003B207)
- 05000321/LER-1981-004, Forwards LER 81-004/03L-0 + (ML20003B208)
- ML20003B209 + (ML20003B209)
- 05000260/LER-1981-003, Forwards LER 81-003/03L-0 + (ML20003B210)
- ML20003B211 + (ML20003B211)
- ML20003B212 + (ML20003B212)
- ML20003B213 + (ML20003B213)
- ML20003B214 + (ML20003B214)
- 05000321/LER-1981-004-03, /03L-0:on 810106,w/unit in Steady State Power Operation,Qa Audit Showed That Temporary Procedure Change HNP-818 Was Not Approved by Plant Manager within 14 Days of Implementation.Caused by Deletion of Requirement + (ML20003B215)
- ML20003B216 + (ML20003B216)
- 05000260/LER-1981-003-03, /03L-0:on 810112,core Spray Pump Discharge Pressure Switch 2-PS-75-16 Found Outside Tech Spec Limits. Caused by Setpoint Drift.Switch Recalibr & Replaced + (ML20003B218)