Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350C184 + (ML19350C184)
- ML19350C185 + (ML19350C185)
- ML19350C186 + (ML19350C186)
- ML19350C187 + (ML19350C187)
- L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b + (ML19350C188)
- ML19350C189 + (ML19350C189)
- ML19350C190 + (ML19350C190)
- ML19350C191 + (ML19350C191)
- ML19350C192 + (ML19350C192)
- ML19350C193 + (ML19350C193)
- ML19350C194 + (ML19350C194)
- ML19350C195 + (ML19350C195)
- ML19350C197 + (ML19350C197)
- ML19350C199 + (ML19350C199)
- ML19350C200 + (ML19350C200)
- 05000339/LER-1981-030, Forwards LER 81-030/03L-0 + (ML19350C201)
- ML19350C202 + (ML19350C202)
- 05000339/LER-1981-030-03, /03L-0:on 810316,casing Cooling Subsys B Was Removed from Svc During Mode 1,contrary to Tech Spec 3.6.2.2.Caused by Need to Prevent Pressurization of Sys While Performing Maint on Valve MOV-RS-201B + (ML19350C203)
- ML19350C204 + (ML19350C204)
- 05000339/LER-1981-027, Forwards LER 81-027/03L-0 + (ML19350C205)
- ML19350C206 + (ML19350C206)
- 05000339/LER-1981-027-03, /03L-0:on 810228,requirement to Determine Core Axial Power Distribution within Limits Every 8-h Was Missed When Monitoring Sys Failed W/O Operator Knowledge.Caused by Processor Overheating Due to Inadequate Ventilation + (ML19350C207)
- 05000313/LER-1981-004, Forwards LER 81-004/03L-0 + (ML19350C208)
- ML19350C209 + (ML19350C209)
- 05000313/LER-1981-004-03, /03L-0:on 810227,diesel Fire Pump Battery Bank Surveillance Test Found Not Completed within Grace Period. Caused by Failure to Notify Supervisor That Procedure Could Not Be Completed During Shift + (ML19350C210)
- 05000260/LER-1981-010, Forwards LER 81-010/03L-0 + (ML19350C211)
- ML19350C212 + (ML19350C212)
- 05000346/LER-1981-015, Forwards LER 81-015/03L-0 + (ML19350C213)
- ML19350C214 + (ML19350C214)
- 05000346/LER-1981-015-03, /03L-0:on 810227,access Door 107 Found Propped Open from ECCS 2 Pump Room 115 to Miscellaneous Waste Monitor Tank & Pump Room 114.Caused by Failure to Follow Posted Signs While Clearing Odor from Room + (ML19350C215)
- 05000260/LER-1981-010-03, /03L-0:on 810306,during Normal Operation,Special Instruction 4.1.B.2 Was Not Performed.Caused by Personnel Error.Personnel Cautioned to Perform Instructions as Scheduled + (ML19350C216)
- 05000368/LER-1981-012, Forwards LER 81-012/03L-0 + (ML19350C217)
- ML19350C218 + (ML19350C218)
- 05000368/LER-1981-012-03, /03L-0:on 810303,loop Two Svc Water Header Engineered Safety Feature Isolation Valve 2CV-1406-2 Would Not Open from Control Room.Caused by Valve Operator Torquing Out Due to Valve Stem Binding + (ML19350C219)
- ML19350C220 + (ML19350C220)
- ML19350C221 + (ML19350C221)
- 05000346/LER-1980-025, Forwards LER 80-025/03X-1 + (ML19350C222)
- ML19350C223 + (ML19350C223)
- ML19350C224 + (ML19350C224)
- 05000346/LER-1980-025-03, /03X-1:on 800330,control Rod Group 5,rod 11 Absolute Position Indication Declared Inoperable.Caused by Fluctuating Signals Resulting in Numerous Asymmetric Rod Alarms Due to Defective Reed Switch Assemblies + (ML19350C225)
- 05000339/LER-1981-022, Forwards LER 81-022/03L-0 + (ML19350C228)
- ML19350C229 + (ML19350C229)
- ML19350C230 + (ML19350C230)
- 05000339/LER-1981-022-03, /03L-0:on 810310,31-day Surveillance Interval Re Updating Axial Power Distribution Monitoring Sys Was Exceeded by 25%.Caused by Personnel Not Upgrading Surveillance Log + (ML19350C231)
- 05000313/LER-1980-028, Forwards Revised LER 80-028/01X-1 + (ML19350C232)
- ML19350C233 + (ML19350C233)
- 05000313/LER-1980-028-01, Intake Structure Concrete Access Plugs Removed.Later Review Identified Access Barriers to Be Missile Shields & No Protection Provided at Personnel Access Doors.Plugs Replaced + (ML19350C234)
- AECM-81-118, Interim Deficiency Rept 9 Re Discrepancies in Design Documentation for Power Generation Control Complex Panels & Hardware,Originally Reported on 800223.Caused by as-shipped Panels Not Matching as-shipped Drawings + (ML19350C235)
- 05000333/LER-1981-023, Forwards LER 81-023/03L-0 + (ML19350C236)
- ML19350C237 + (ML19350C237)
- ML19350C238 + (ML19350C238)