- 05000327/LER-1980-173-01, /01T-0:on 801105,potential Discovered for Line Failure During Seismic Event Due to Missing Hangers on Component Cooling Water Supply Piping to Centrifugal Charging Pump Mechanical Seals.Caused by Drawing Omission + (ML19345A943)
- ML19345A944 + (ML19345A944)
- 05000334/LER-1980-078, Forwards LER 80-078/01T-0 + (ML19345A945)
- ML19345A946 + (ML19345A946)
- 05000344/LER-1980-021-03, During Temporary Plant Test,C Main Steam Isolation Valve Did Not Fully Close. Caused by Component Failure.Test Completed Successfully & Valve Closed + (ML19345A947)
- 05000285/LER-1980-027, Forwards LER 80-027/03L-0 + (ML19345A948)
- ML19345A949 + (ML19345A949)
- AECM-80-286, Second Interim Deficiency Rept Re Procedural Violation in Cutting Rebar,Initially Reported on 800602.Constructor Issued Stop Work Order.Method to Evaluate Unlogged Cut Rebar Is Being Developed.Final Rept Will Be Provided by 810801 + (ML19345A950)
- ML19345A952 + (ML19345A952)
- 05000334/LER-1980-078-01, /01T-0:on 801114,determined That,If Safety or Relief Valves Challenged W/Water Loop Seals on Inlet, Downstream Piping Could Be Overstressed.Caused by Inadequate Design.Loop Seal Drains Installed + (ML19345A953)
- 05000285/LER-1980-027-03, /03L-0:on 801027,during Monthly Ac Sequencer Timer Test,Timer FW-6 on Sequencer S1-2 Failed to Time Out within Prescribed Limit.Caused by Sticky Operating Mechanism.Timer Replaced W/Spare + (ML19345A954)
- 05000325/LER-1980-076, Forwards LER 80-076/03L-0 + (ML19345A956)
- ML19345A957 + (ML19345A957)
- 05000325/LER-1980-076-03, /03L-0:on 801022,primary Containment Oxygen Analyzer 1-CAT-AT-1259-2 Observed Indicating Upscale.Caused by Failed Magnetic Analyzer Sample Cell.Magnetic Unit Replaced & Analyzer Returned to Satisfactory Operation + (ML19345A958)
- 05000324/LER-1980-085, Forwards LER 80-085/03L-0 + (ML19345A959)
- ML19345A960 + (ML19345A960)
- 05000324/LER-1980-084, Forwards LER 80-084/03L-0 + (ML19345A961)
- ML19345A962 + (ML19345A962)
- 05000324/LER-1980-085-03, /03L-0:on 801024,containment Atmosphere Dilution Sys Valves 2-CAD-V55 & 56 Would Not Fully Open.Caused by Deformed Stem Seals in Each Valve Operator.New Stem Seals Installed + (ML19345A963)
- 05000267/LER-1980-067, Forwards LER 80-067/01T-0 + (ML19345A964)
- ML19345A965 + (ML19345A965)
- 05000324/LER-1980-084-03, /03L-0:on 801024,containment Atmosphere Dilution Tank Flow Control Valves 2-CAC-FCV-2717 & 2720 Would Not Operate.Caused by Accumulation of Water in Electropneumatic Converter of Valve 2720.Water Removed + (ML19345A966)
- 05000219/LER-1980-048, Forwards LER 80-048/03L-0 + (ML19345A967)
- ML19345A968 + (ML19345A968)
- 05000267/LER-1980-067-01, /01T-0:on 801107,tritium Concentration Exceeded Limit Specified in LC04.8.24.8.2(a).Caused by Inadequate Deviation 80-445 to Surveillance Procedure SR 5.8.2bc-M. Procedure & Design Changes Under Investigation + (ML19345A969)
- ML19345A970 + (ML19345A970)
- ML19345A972 + (ML19345A972)
- 05000219/LER-1980-048-03, /03L-0:on 801029,during Functional Testing,Snubber 23-7 Failed to Lock Up in Tension Direction.Cause Unknown. Snubber Replaced + (ML19345A973)
- ML19345A974 + (ML19345A974)
- 05000334/LER-1980-077, Forwards LER 80-077/01T-0 + (ML19345A975)
- ML19345A976 + (ML19345A976)
- 05000334/LER-1980-077-01, /01T-0:on 801114,overstress Condition Determined to Exist on Main Steam Line Branch Line Support.Caused by Thermal Movement of Main Steam Line Affecting Branch Line Support.Pipe Support Rod Completed + (ML19345A977)
- ML19345A978 + (ML19345A978)
- ML19345A979 + (ML19345A979)
- 05000219/LER-1980-049, Forwards LER 80-049/01T-0 + (ML19345A980)
- ML19345A981 + (ML19345A981)
- 05000219/LER-1980-049-01, /01T-0:on 801105,when Isolation Condenser B Was Removed from Svc to Repair Steam Leak,Vent Isolation Valves V-14-1 & V-14-19 Apparently Failed to Close.Cause Undertermined.Stem Packing Replaced & Tested + (ML19345A982)
- PNO-I-80-167, on 800929,State of Nj Dept of Environ Protection Received Ltr from Citizen Complaining of Radioactive Contamination Along Route 17,Rochelle,Park,NJ. Th-232 & Ra-226 Confirmed in 801008 & 20 Soil Samples + (ML19345A983)
- ML19345A984 + (ML19345A984)
- 05000320/LER-1980-048, Forwards LER 80-048/03L-0 + (ML19345A985)
- PNO-I-80-168, on 801117,reactor Tripped Due to Low Steam Pressure Signal.Caused by Placing Wrong Channel in Trip When Intermittent Fault Became Evident on Another Instrument. Outage Expected to Last Two Days for Reboration & Repairs + (ML19345A987)
- ML19345A989 + (ML19345A989)
- 05000320/LER-1980-048-03, /03L-0:on 801017,after Sampling a Core Flood Tank, Inner Containment Isolation Valve CF-V115 Failed to Close. Apparently Caused by Motor & Control Circuits Grounding Out, Induced by Water Leakage.Valve Closed & Deactivated + (ML19345A990)
- 05000249/LER-1980-037-03, /03L-0:on 801020,during Normal Operation W/Dis 500-2 in Progress,Level Switch LIS 263-57B Was Found to Trip at Differential Pressure Less than Tech Specs.Caused by Instrument Drift.Instrument Readjusted + (ML19345A992)
- ML19345A993 + (ML19345A993)
- ML19345A994 + (ML19345A994)
- ML19345A995 + (ML19345A995)
- ML19345A996 + (ML19345A996)
- ML19345A997 + (ML19345A997)
- ML19345A998 + (ML19345A998)
- ML19345B002 + (ML19345B002)