ML19345A946

From kanterella
Jump to navigation Jump to search
Forwards LER 80-078/01T-0
Date released: 12/25/2019 Download: ML19345A946


LER 80-078/01T-0:on 801114,determined That,If Safety or Relief Valves Challenged W/Water Loop Seals on Inlet, Downstream Piping Could Be Overstressed.Caused by Inadequate Design.Loop Seal Drains Installed
ML19345A953
Person / Time
Site: Beaver Valley
Issue date: 11/19/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345A953 (4)
Forwards LER 80-078/01T-0
ML19345A945
Person / Time
Site: Beaver Valley
Issue date: 11/19/1980
From: Werling J
DUQUESNE LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345A945 (2)