Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309H529 + (ML19309H529)
- ML19309H530 + (ML19309H530)
- ML19309H533 + (ML19309H533)
- ML19309H535 + (ML19309H535)
- 05000327/LER-1980-031-03, /03L-0:on 800410,during Performance of Surveillance Instruction,Containment Spray Pump Check Valves Reported Leaking.Caused by Const Personnel Error.Disc & Related Parts Were Reinstalled + (ML19309H537)
- ML19309H538 + (ML19309H538)
- 05000333/LER-1980-032, Forwards LER 80-032/04L-0 + (ML19309H541)
- ML19309H542 + (ML19309H542)
- 05000333/LER-1980-032-04, /04L-0:on 800408,during First Quarter of 1980, Release of Halogens & Particulates w/half-lives of Greater than Eight Days Exceeded Ets.Caused by Packing Leak in RHR Sys.Tightened Packing as Temporary Corrective Action + (ML19309H544)
- 05000333/LER-1980-033, Forwards LER 80-033/03L-0 + (ML19309H545)
- ML19309H546 + (ML19309H546)
- ML19309H547 + (ML19309H547)
- ML19309H548 + (ML19309H548)
- ML19309H549 + (ML19309H549)
- ML19309H551 + (ML19309H551)
- ML19309H552 + (ML19309H552)
- 05000333/LER-1980-033-03, /03L-0:on 800409,during Normal Operation,Diesel Fire Pump Was Intentionally Made Inoperable for Approx 45 Minutes.Caused by Need to Replace Engine Cooling Heat Exchanger Goose Neck,Corroded Due to Normal Wear & Tear + (ML19309H553)
- ML19309H554 + (ML19309H554)
- 05000295/LER-1980-016, Forwards LER 80-016/03L-0 + (ML19309H555)
- ML19309H557 + (ML19309H557)
- ML19309H558 + (ML19309H558)
- ML19309H559 + (ML19309H559)
- 05000295/LER-1980-016-03, /03L-0:on 800325,during Normal Operation,S/G Steam Flow Channel Was Found Reading Lower than Allowable Channel Tolerance.Caused by Excessive Process Noise from Transmitter.Transmitter Replaced & Channel Returned to Svc + (ML19309H560)
- ML19309H561 + (ML19309H561)
- 05000366/LER-1980-070, Forwards LER 80-070/03L-0 + (ML19309H564)
- ML19309H565 + (ML19309H565)
- ML19309H567 + (ML19309H567)
- ML19309H568 + (ML19309H568)
- ML19309H569 + (ML19309H569)
- ML19309H570 + (ML19309H570)
- 05000366/LER-1980-070-03, /03L-0:on 800422,while Performing Surveillance Procedure HNP-2-3405,reactor Core Isolation Cooling Trip & Throttle Valve Closed When Turbine Speed Reached 2,000 Rpm. Cause Not Identified.Trip & Throttle Valve Reset + (ML19309H572)
- NUREG-0670, Discusses Comments on NUREG-0670, Study of Separation of Functions & Ex Parte Rules in NRC Adjudications for Domestic Licensing. Recommends Approval of Encl Draft Ltr to Senators Ribicoff & Culver + (ML19309H573)
- ML19309H574 + (ML19309H574)
- ML19309H575 + (ML19309H575)
- 05000366/LER-1980-071, Forwards LER 80-071/03L-0 + (ML19309H576)
- ML19309H577 + (ML19309H577)
- 05000346/LER-1980-033, Forwards LER 80-033/01T-0 + (ML19309H578)
- ML19309H579 + (ML19309H579)
- ML19309H580 + (ML19309H580)
- ML19309H581 + (ML19309H581)
- 05000366/LER-1980-052, Forwards LER 80-052/03L-0 + (ML19309H582)
- ML19309H583 + (ML19309H583)
- 05000346/LER-1980-033-01, /01T-0:on 800425,determined from Bechtel Study That Bleed Rate for 12 Hydraulic Snubbers Would Be Insufficient to Permit Thermal Growth of Piping During Transient Concurrent W/Locked Snubber + (ML19309H584)
- ML19309H585 + (ML19309H585)
- 05000366/LER-1980-071-03, /03L-0:on 800424,during Routine Reactor Startup Activities,Reactor Core Isolation Cooling Leak Detection Logic Power Failure Alarm Was Received.Caused by Component Failure.Inverter Supporting Power Was Replaced + (ML19309H586)
- ML19309H587 + (ML19309H587)
- ML19309H588 + (ML19309H588)
- 05000282/LER-1980-014, Forwards LER 80-014/03L-0 + (ML19309H589)
- ML19309H590 + (ML19309H590)
- 05000366/LER-1980-052-03, /03L-0:on 800408,during Maint of Standby Gas Treatment Sys,Power Cables to Heaters & Fans Found Undersized.Caused by Design Error.Cables Will Be Replaced by 800601 + (ML19309H591)
- ML19309H592 + (ML19309H592)