Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19269D111 + (ML19269D111)
- ML19269D112 + (ML19269D112)
- ML19269D113 + (ML19269D113)
- ML19269D114 + (ML19269D114)
- 05000325/LER-1979-002-03, /03L-0 on 790123:standby Liquid Control Relief Valve C41-F029 Lifted at Pressure of 1300 Psig,Below Tech Spec Min.No Mechanical Reason Found.Valve Reset + (ML19269D115)
- ML19269D116 + (ML19269D116)
- ML19269D117 + (ML19269D117)
- ML19269D118 + (ML19269D118)
- ML19269D119 + (ML19269D119)
- ML19269D121 + (ML19269D121)
- ML19269D122 + (ML19269D122)
- 05000237/LER-1979-009-03, /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open + (ML19269D123)
- ML19269D124 + (ML19269D124)
- ML19269D125 + (ML19269D125)
- ML19269D126 + (ML19269D126)
- ML19269D127 + (ML19269D127)
- ML19269D128 + (ML19269D128)
- ML19269D129 + (ML19269D129)
- 05000278/LER-1979-001-03, /03L-0 on 790111:discovered That Recorded hi-hi Trip Valve for Steam Line Radiation Monitor Was 50 man-rem/h Greater than Tech Spec Limit & No Corrective Action Taken. Caused by Procedural Deficiency + (ML19269D130)
- ML19269D131 + (ML19269D131)
- ML19269D132 + (ML19269D132)
- ML19269D133 + (ML19269D133)
- ML19269D134 + (ML19269D134)
- ML19269D135 + (ML19269D135)
- ML19269D136 + (ML19269D136)
- ML19269D137 + (ML19269D137)
- ML19269D139 + (ML19269D139)
- ML19269D140 + (ML19269D140)
- ML19269D142 + (ML19269D142)
- ML19269D143 + (ML19269D143)
- ML19269D144 + (ML19269D144)
- 05000278/LER-1979-004-03, /03L-0 on 790117:during Surveillance Test,Setpoint of PS-3-14-44D Found to Be Greater than Tech Spec Max.Caused by Setpoint Drift on static-o-ring Model 5N-AA3 Pressure Switch.Instrument Recalibrated + (ML19269D145)
- 05000247/LER-1979-004-03, /03L-0 on 790126:during Normal Operation,Process Radiation Monitors R-11 & R-12 Became Inoperable Due to Seized Sample Pump.Caused by Seizure of Conde Dry Air Pump, Model 6SFCW,for Process Radiation Monitors R-11 & R-12 + (ML19269D146)
- 05000259/LER-1979-002, Forwards LER 79-002/03L-0 + (ML19269D147)
- ML19269D148 + (ML19269D148)
- ML19269D149 + (ML19269D149)
- ML19269D150 + (ML19269D150)
- ML19269D151 + (ML19269D151)
- ML19269D152 + (ML19269D152)
- ML19269D153 + (ML19269D153)
- ML19269D154 + (ML19269D154)
- 05000259/LER-1979-002-03, /03L-0 on 790129:during Normal Operation While Performing Surveillance Test,Standby Liquid Control Pump 1B Relief Valve Opened Below Tech Spec Min.Caused by Valve Seat Surface Deterioration + (ML19269D155)
- ML19269D156 + (ML19269D156)
- 05000338/LER-1979-011, Forwards LER 79-011/03L-0 + (ML19269D157)
- ML19269D158 + (ML19269D158)
- ML19269D159 + (ML19269D159)
- 05000338/LER-1979-011-03, /03L-0 on 790126:fire Door SS54-9 Was Nonfunctional.Caused by Removal of Latch from Door by Person or Persons Unknown + (ML19269D160)
- ML19269D161 + (ML19269D161)
- 05000271/LER-1979-003, Forwards LER 79-003/03L-0 + (ML19269D162)
- ML19269D163 + (ML19269D163)
- 05000346/LER-1979-016, Forwards LER 79-016/03L-0 + (ML19269D164)