Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19254E255 + (ML19254E255)
- ML19254E256 + (ML19254E256)
- ML19254E257 + (ML19254E257)
- ML19254E258 + (ML19254E258)
- ML19254E259 + (ML19254E259)
- ML19254E260 + (ML19254E260)
- ML19254E261 + (ML19254E261)
- ML19254E262 + (ML19254E262)
- 05000325/LER-1979-076, Forwards LER 79-076/03L-0 + (ML19254E264)
- ML19254E265 + (ML19254E265)
- ML19254E266 + (ML19254E266)
- ML19254E267 + (ML19254E267)
- ML19254E268 + (ML19254E268)
- ML19254E269 + (ML19254E269)
- 05000325/LER-1979-076-03, /03L-0:on 791002,valve E11-F068B Failed to Open. Caused by Contacts Sticking in Relay Ri in Position Modulator,Resulting in Constant Close Signal.Relay Freed & Replacement Ordered + (ML19254E270)
- ML19254E271 + (ML19254E271)
- ML19254E272 + (ML19254E272)
- ML19254E273 + (ML19254E273)
- 05000325/LER-1979-072, Forwards LER 79-072/03L-0 + (ML19254E275)
- ML19254E276 + (ML19254E276)
- ML19254E277 + (ML19254E277)
- ML19254E278 + (ML19254E278)
- ML19254E279 + (ML19254E279)
- 05000338/LER-1979-134, Forwards LER 79-134/03L-0 + (ML19254E280)
- ML19254E281 + (ML19254E281)
- ML19254E282 + (ML19254E282)
- 05000325/LER-1979-072-03, /03L-0:on 791003,main Steam Line High Radiation Instrument D12-RM-K603A Intermittently Spiked.Caused by Loose Condition of Voltage Cable,Resulting in Poor Contact. Connector Removed & Cleaned + (ML19254E283)
- ML19254E284 + (ML19254E284)
- ML19254E285 + (ML19254E285)
- 05000338/LER-1979-134-03, /03L-0:on 790928,six Valves Failed to Close on First Signal of Containment Depressurization Test But Did So on Second Signal.Cause Undetermined.Valves Will Be Rechecked & Repaired as Necessary + (ML19254E286)
- ML19254E287 + (ML19254E287)
- ML19254E288 + (ML19254E288)
- ML19254E289 + (ML19254E289)
- ML19254E290 + (ML19254E290)
- ML19254E292 + (ML19254E292)
- ML19254E293 + (ML19254E293)
- ML19254E294 + (ML19254E294)
- 05000368/LER-1979-075-03, /03X-1:on 790822,during Mode 1 Operation,Data Link from Control Element Assembly Cluster to B Core Protection Computer Dropped,Resulting in B Channel Tripping.Caused by Failed Optical Amplifier.Data Link Was Repaired + (ML19254E296)
- ML19254E297 + (ML19254E297)
- ML19254E298 + (ML19254E298)
- 05000368/LER-1979-083-03, /03L-0:on 790926,during Mode 2 Operation,Rod 46 Dropped Four Times to Lower Electrical Limit.Cause Not Stated.Voltage to CEDM Gripper Coils Was Increased & Rod Exercised Successfully.Control Element Assembly Realigned + (ML19254E299)
- ML19254E300 + (ML19254E300)
- 05000368/LER-1979-084-03, /03L-0:on 790927,during Mode 2 Operation,Control Element Assembly 46 Dropped to Lower Electrical Limit.Cause Not Stated.Gripper Voltage Was Increased to Facilitate Rod Withdrawal.Rod Was Realigned to Group Average + (ML19254E301)
- 05000338/LER-1979-135, Forwards LER 79-135/03L-0 + (ML19254E302)
- ML19254E303 + (ML19254E303)
- ML19254E304 + (ML19254E304)
- 05000368/LER-1979-085-03, /03L-0:on 790925,during Mode 2 Operation,Refueling Water Tank Boron Concentration Was 1,705 Ppmb.Caused by Calculation Based on Boron Concentration Taken Prior to Sufficient Mixing.Operating Procedures Revised + (ML19254E305)
- ML19254E306 + (ML19254E306)
- ML19254E307 + (ML19254E307)
- ML19254E308 + (ML19254E308)
- ML19254E309 + (ML19254E309)