Forwards Revision 2 to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. No Action Required
ML19254E268
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/19/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 7910310399
Download: ML19254E268 (1)


Text

b km RfC

'o UNITED STATES

! ",,, ( [',j NUCLEAR REGULATORY COMMISSION

'j.. r REGION lit o

799 Rf>OSEVELT ROAD

%, ' b/

o GLEN ELLYN. ILLINOIS 60137 OCT 191979 Docket No. 50-341 s

The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

The enclosed Bulletin 79-13, Revision 2 ir forwarded to you for information. No written response is required.

If you desire additional information regardinr S.ais matter, please contact this office.

Sincerely, u[

b*

ames G. Keppler Director

Enclosures:

1.

IE Bulletin No. 79-13, Revision 2 2.

Listing of IE Bulletins IsEued in Last Six Months cc w/ encl:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney

.)

,,'4 180 u

[

7010310 y'

SSINS:

6830 Accession No.:

7308220135 UNITED STATES NUCLEAR REGULATORY C0milSSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 October 16, 1979 IE Bulletin No. 79-13 Revision 2 CRACKING IN FEEDWATER SYSTEM PIPING Description of Circumstances:

This revision to IE Bulletin No. 79-13 is based on the results of the radio-graphic examinations and ongoing investigation of the subject problem to date since the initial Bulletin was issued.

The revision reduces in scope the R2 number and extent of the piping system welds required to be examined. The requirements for reporting and action time frame remain unchanged.

On May 20, 1979, Indiana and Michigan Power Company notified the NRC of cracking in two feedwater lines at their D. C. Cook Unit 2 facility. The cracking was discovered following a shutdown on May 19 to investigate leakage inside containment.

Leaking circumferential cracks were identified in the 16-inch feedwater elbows adjacent to two steam generator nozzle elbow welds.

Subsequent radiographic examination revealed crack indications in all eight steam generator feedwater lines at this location on both Units 1 and 2.

On May 25, 1979, a letter was sent to all PWR licensees by the Office of Nuclear Reactor Regulation which informed licensees of the D. C. Cook failures and requested specific information on feedwater system design, fabrication, inspection and operating histories.

To further explore the generic nature of the cracking problem, the Office of Inspection and Enforcement requested licensees of PWR plants in current outages to immediately conduct volumetric examination of certain feedwater piping welds.

As a result of these actions, several other licensees with Westinghouse steam generators repoM ed crack indications.

Southern California Edison reported on June 5,1979, that radiographic examination revealed indications of cracking in feedwater nozzle-to pipe welds on two of three steam generators of San Onofre Unit 1.

On June 15, 1979, Carolina Power and Light reported that radiography showed crack indications in similar locations at their H. B.

Robinson Unit 2.

Duquesne Power and Light confirmed on June 18, 1979, that radiography has shown cracking in their Beaver Valley Unit 1 feedwater piping-to-vessel nozzle weld.

Pubiic Service Electric and Gas Company reported on June 20,1979 that Salem Unit I also has crack indications. Wisconsin Public Service company decided on June 20, 1970 +a m+ ant a faa h tar nn771a-tn-nine weld wnich contained questionable indic As of June 22, 1979 and since May 25, 1 inspected the feedwater nozzle ~-to pipe DUPLICATE DOCUMENT Entire docrent previously NOTE:

R1 and R2 indicates lines rev ntered into system under:

ANO

'l k

No. of pages:

/

rv

.