Forwards Revision 2 to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. No Action Required
ML19254E267
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/19/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 7910310398
Download: ML19254E267 (1)


Text

b

[s....,#'o UNITED STATES

! " 3,,( [ g NUCLEAR REGULATORY COMMISSION

.c REGION lli b[

o, 799 ROOSEVELT ROAD o

GLEN ELLYN. ILLINOIS 6o137 I9I9

  • ...+

OCT 1 9 Docket No. 50-409 Dairyland Power Cooperative ATTN:

Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:

The enclosed Bulletin 79-13, Revision 2 is forwarded to you for information. No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, a~

James G. Keppler Director

Enclosures:

1.

IE Bulletin No. 79-13, Revision 2 2.

Listing of IE Bulletins Issued in Last Six Months cc w/ encl:

Mr. R. E. Shimshak, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Anthony Roisman, Esq.,

Attorney

4 178 3gg 4

7910310

SSINS:

6830 Accession No.:

7908220135 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 October 16, 1979 IE Bulletin No. 79-13 '

Revision 2 s

CRACKING IN FEEDWATER SYSTEM PIPING Description of Circumstances:

This revision to IE Bulletin No. 79-13 is based on the results of the radio-graphic examinations and ongoing investigation of the subject problem to date since the initial Bulletin was issued.

The revision reduces in scope the R2 number and extent of the piping system welds required to be examined. The requirements for reporting and action time frame remain unchanged.

On May 20, 1979, Indiana and Michigan Power Company notified the NRC of cracking in two feedwater lines at their D. C. Cook Unit 2 facility. The cracking was discovered fr lowing a shutdown on May 19 to investigate leakage inside containment.

Leaking circumferential cracks were identified in the 16-inch feedwater elbows adjacent to two steam generator nozzle elbow welds.

Subsequent radiographic examination revealed crack indications in all eight steam generator feedwater lines at this location on both Units 1 and 2.

On May 25,1979, a letter was sent to all PWR licensees by the Office of Huclear Reactor Regulation which informed licensees of the D. C. Cook failures and requested specific information on feedwater system design, fabrication, inspection and operating histories. To further explore the generic nature of the cracking problem, the Office of Inspection and Enforcement requested licensees of PWR plants in current outages to immediately conduct volumetric examination of certain feedwater piping welds.

As a result of these actions, several other licensees with Westinghouse steam generators reported crack indications.

Southern California Edison reported on June 5,1979, that radiographic examination revealed indications of e acking in feedwater nozzle-to pipe welds on two of three steam generators of San Onofre Unit 1.

On June 15, 1979, Carolina Power and Light reported that radiography showed crack indicr^. ions in similar locations at their H. B.

Robinson Unit 2.

Duquesne Power and Light confirmed on June 18, 1979, that radiography has shown cracking in their Beaver Valley Unit 1 feedwater piping-to-vessel nozzle weld.

Public Service Electric and Gas Company reported on June 20, 1979 that Salem Unit 1 also has crack indications. Wisconsin Public Service company decided on June 20, 1979 to cut out a fearbater nania-tn-nino weld which contained questionable indi As of June 22, 1979 and since May 25, inspected the feedwater nozzle ~-to pipe DUPLICATE DOCUMENT L